1.

Wall mounted water closet fixtures shall be securely bolted to an approved _____.

a)

carrier fitting

b)

spud adapter

c)

ferrous swedged adapter

d)

wall to spud adapter

2.

You are installing an PVC soil drainage system. The minimum face width of the PVC closet flange that you are installing is _____.

a)

1"

b)

1-1/4"

c)

1-1/2"

d)

2"

3.

What is the minimum and maximum depth of a shower dam or threshold is _____ inches to _____ inches.

a)

2, 9

b)

3, 5

c)

4, 7

d)

6, 8

4.

When gutters are installed in public or gang shower rooms, the drain shall be located not more than _____ feet apart.

a)

12

b)

16

c)

8

d)

4

5.

Providing access to and means for inspection of all completed work shall be the responsibility of the _____.

a)

job site superintendent

b)

general contractor

c)

person requesting the inspection

d)

property owner

6.

Where a provisions of this code, or the application thereof to any person or circumstance, is held invalid, the remainder of the code shall _____.

a)

not be affected

b)

become null and void

c)

be readopted by the jurisdiction

d)

be under review until the next code cycle

7.

The lowest portion of the inside of a horizontal drainage pipe is known as the _____.

a)

trap weir

b)

flood rim

c)

center line

d)

invert

8.

The unobstructed vertical distance through the free atmosphere between the lowest opening from any pipe or faucet conveying potable water to the flood level rim is known as an _____.

a)

indirect waste pipe

b)

airgap-drainage

c)

airbreak

d)

airgap-water distribution

9.

A sink with a visible trap and the same flushing and cleansing characteristics as a water closet is a _____.

a)

portable sink

b)

service sink

c)

wash down sink

d)

clinic sink

10.

You are installing a water heater in a remodeled residence. The only option you have is to install the heater under a stairway. What is the code ruling on this installation?

a)

the code prohibits this installation

b)

the code has no reference for this installation

c)

the installation may occur if not prohibited by other regulations

d)

this code refers you to the mechanical code

11.

When installing a water heater in an attic or furred space where the possibility of damage may occur you shall install a corrosion resistant pan beneath the vessel. What is the minimum diameter drain that shall be incorporated into this pan _____.

a)

1/2"

b)

3/4"

c)

1"

d)

no drain required by this code

12.

A water heater supported from the ground shall rest on level concrete or other approved base extending not less than ____ inches above the adjoining ground level?

a)

2

b)

3

c)

12

d)

18

13.

Water heaters shall be anchored or strapped to resist horizontal displacement. Strapping shall be located _____.

a)

one strap located in the middle of the unit

b)

not required by this code

c)

one strap in the upper 1/3rd and one in the lower 1/3rd of the unit

d)

only required when the heater is installed in a basement or attic

14.

When using pipe joint materials it shall be applied only on the _____.

a)

female threads

b)

inside threads of the fitting

c)

male threads

d)

male threads and the inside of the fitting

15.

Refer to Drawing #48 (Water Heater Installation Drawing). If this water heater had a recirculation pump installed in the system. Where must the piping at “E” terminate?

a)

6-inches above the floor

b)

to an approved water heater corrosive resistant pan

c)

to a bathtub waste and overflow by a wye branch fitting

d)

to the exterior of the building not less than 6-inches above the ground

16.

The required height above the floor that a backflow prevention assembly is to have a permanent platform installed for testing purposes is _____.

a)

1 foot 6 inches

b)

3 feet 0 inches

c)

5 feet 0 inches

d)

5 feet 6 inches

17.

Refer to Drawing #34. With a water pressure between 45-55 psi. the fixture units and the pipe size at (G) is _____ fixture units and _____ pipe.

a)

15 - 1"

b)

17 -1"

c)

16 - 3/4"

d)

15.5 - 1"

18.

Refer to Drawing #34. With a water pressure of 55-65 psi. The fixture units at (C) is _____ WSFU.

a)

3

b)

2.5

c)

2

d)

1

19.

The size cleanout plug on a 3 inch line is _____ inch.

a)

1-1/2

b)

2

c)

2-1/2

d)

3

20.

Refer to Drawing #23. This is a single family dwelling in a small town. The minimum trap arm size at ( K ) is _____.

a)

1-1/4 inch

b)

1-1/2 inch

c)

2 inch

d)

none of the above

21.

The fixture unit capacity of a fixture over 50 gallons per minute shall be determined by _____.

a)

appendix I

b)

the Health Officer

c)

the Authority Having Jurisdiction

d)

the manufacture of the fixture

22.

The maximum trap loading for a 3 inch trap is _____ fixture unit(s).

a)

1

b)

3

c)

4

d)

6

23.

An indirect waste pipe that is trapped but not vented shall be no more than _____ feet in length?

a)

20

b)

15

c)

10

d)

5

24.

Condensation lines from air conditioning may discharge into a sanitary sewer system by the means of a _____.

a)

wye type fitting

b)

vent pipe

c)

sanitary tee

d)

indirect waste line

25.

The drain from a automatic dishwasher shall discharge through a _____.

a)

check valve

b)

rubber hose

c)

air gap

d)

air break

26.

In a private installation, two 1.6 tank type water closets, two lavatories, one kitchen sink, one clothes washer, one bathtub, and one shower (private installation) have a total waste fixture unit count of ______ fixture units.

a)

17

b)

20

c)

14

d)

30

27.

The common waste pipe serving four clothes washers in a battery will have a total fixture count of ______ fixture units.

a)

8

b)

12

c)

24

d)

16

28.

Vitrified clay building sewer pipe and fittings are ______.

a)

approved for use at least 12 inches below grade

b)

approved for use inside a buildings and aboveground

c)

unrestricted in use for drain lines

d)

unrestricted in use for vent lines

29.

Refer to the drawing below. The minimum size pipe at “B” is _____ inch.

a)

1-1/2

b)

2

c)

1-1/4

d)

3

30.

There are _____ fixture units allowed on a 1-1/2 inch vent stack.

a)

3

b)

4

c)

5

d)

8

31.

The total number of kitchen sinks allowed on a 2-inch vertical waste pipe is ______.

a)

4

b)

6

c)

8

d)

10

32.

In a private installation, two 1.6 tank type water closets, two lavatories, one kitchen sink, one clothes washer, one bathtub, and one shower (private installation) have a total waste fixture unit count of ______ fixture units.

a)

17

b)

20

c)

14

d)

30

33.

Refer to the drawing #22. What size is the trap arm at Q?

a)

1-1/2"

b)

2"

c)

1-1/4"

d)

3'

34.

Refer to the drawing #22. How many fixture units are at M?

a)

5

b)

6

c)

4.5

d)

4

35.

Refer to the drawing #22. What is the pipe size at G

a)

1-1/4”

b)

1-1/2”

c)

2"

d)

3"

e)

4"

36.

Refer to the drawing #22. What is the pipe fitting at F?

a)

combination wye and 1/8 bend

b)

wye

c)

sweep

d)

san tee

37.

The sump discharge from subsoil drains may discharge onto a concrete block with a minimum length of _____ inches.

a)

18

b)

24

c)

30

d)

36

38.

A gutter collecting the rainfall from a 476 square foot roof, with 4 inches of rainfall, and a slope of 1/16 inch per foot, shall be a minimum size of _____ inch.

a)

3

b)

4

c)

5

d)

6

39.

Refer to Drawing #47. C = 46’ - 0”, D = 12’ - 0”, E = 110’ - 0”. If there is a 4 inch rain fall, and 1/2” slope what are the drain sizes at A and B is _____.

a)

A is 5 inch and B is 6 inch

b)

A is 4 inch and B is 5 inch

c)

A and B are the same size at 5 inch

d)

A is 6 inch and B is 5 inch

40.

An approved _______ shall be installed immediately upstream of a gas regulator?

a)

flow control device

b)

gas shut off valve

c)

flex connector

d)

automatic shut off valve

41.

Refer to Drawing #37. The correct pipe size at ( B ) is _____ inch.

a)

1-1/4

b)

1

c)

3/4

d)

1/2

42.

Refer to Drawing #37. The pipe size at section ( D ) is _____ inch.

a)

1/2”

b)

3/4”

c)

1"

d)

1-1/4”

43.

Refer to Drawing #37. What is the gas demand at section ( F ) with 1100 Btu/ft3.

a)

245 cubic feet per hour

b)

215 cubic feet per hour

c)

230 cubic feet per hour

d)

209 cubic feet per hour

44.

Refer to Drawing #37. What is the pipe size at (A)?

a)

1"

b)

1-1/4"

c)

1-1/2"

d)

2"

45.

Refer to Drawing #37. What is the pipe size at (K)?

a)

1/2"

b)

3/4"

c)

1"

d)

1-1/4"

46.

Plastic or copper water pipe when installed through a framing member to within 1-inch of the exposed framing, shall be protected by _____.

a)

1/2 inch foam rubber insulation

b)

plastic pipe sleeve schedule 40

c)

steel nail plate not less than 18 gauge

d)

steel nail plate not less than 22 gauge

47.

When installing CPVC in a single family dwelling that has two or more floors. You are working on a horizontal application installing 1 inch pipe. Where shall the supports be placed _____.

a)

every 4 feet allowing for expansion

b)

every 10 feet and the pipe shall be banded every 4 feet

c)

every 6 feet with expansion and contraction sleeves

d)

every 3 feet where the joints are solvent cemented

48.

When using hanger rods to support piping 3 inches in diameter. The hanger rod shall be _____ inch.

a)

1/4

b)

3/8

c)

1/2

d)

5/8

49.

Plumbing systems shall be installed in a manner that is in accordance with this code, applicable standards, and _____.

a)

the Authority Having Jurisdiction

b)

accepted engineering standards

c)

engineered plans and specifications

d)

manufacturer’s installation instructions

50.

A suspended 3 inch cast iron, no-hub pipe, 60 feet in length, using 10 feet lengths of pipe shall be supported by approved hangers spaced _____.

a)

every 4 feet with 3/8 inch rod

b)

every 8 feet than 2 feet

c)

every 10 feet with 1/2 inch rod

d)

on both sides of the joint within 18 inches