wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

physical instability Case

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

While Escalating Physical Instability Case to IU , SLA will be :

a)

1 Day

b)

2 Day

c)

5 Day

2.

Customer has ticket Physical Instability in IU , CCA informed him that he within SLA , Right SR is :

a)

FBB Tech Problem > ​​Physical Instability > ​Follow up After SLA

b)

FBB Tech Problem > ​​Physical Instability > ​Follow Up

c)

FBB Tech Problem > ​​Physical Instability Contradiction > ​Follow Up

3.

While escalating Physical Instability CCA Must inform customer to keep his CPE turned on :

a)

TRUE

b)

FALSE

4.

CCA must Ask customer for 2 mobiles numbers while escalating Physical Instability case  : 

a)

TRUE

b)

 false

5.

CCA must inform customer with ticket number while escalating Physical Instability case :

a)

TRUE

b)

FALSE

6.

In physical instability case We will escalate the ticket to ( Pilot-Follow Up ) when problem solved after CST  connected from main wall outlet :

a)

TRUE

b)

FALSE

7.

while troubleshooting physical instability , Clear View Result After Search "Technical dispatch is recommended " ,, next action is : 

a)

 Check connection type

b)

Check last fix date according to TTS and customer input at same time 

8.

While Escalating Physical Instability Case to IU for third time , SLA will be :

a)

1 Day

b)

2 Day

c)

2 Working Day

9.

while troubleshooting physical instability , connection type : wall outlet , the next step is :

a)

Check if connection Right or Wrong

b)

Check splitter existence before cpe

10.

while troubleshooting physical instability , connection type : wall outlet , connection is right the next step is :

a)

Re run assia clear view

b)

Check splitter existence before cpe