In some cases a Client may request an Architect to do work which will require his personal time such as, attending project-related meetings, conferences or trips;
Per Diem, Honorarium Plus Reimbursable Expenses
Mixed Methods of Compensation
Professional Fee Plus Expenses
Lump Sum or Fixed Fee
The Asia Pacific Economic Cooperation (APEC) is an international forum composed of (a) member economies that have undertaken to act collectively to promote economic and technical cooperation within the Asia-Pacific region.
This phase consists of the preparation of studies derived from the Project Definition Phase, leading to conceptual plans. The Architect, evaluates the Owner’s program, schedule, budget, project site and proposes methods of project deliveries.
Bidding or Negotiation Phase
Design Development Phase
Contract Document Phase
Schematic Design Phase
Property is either of public dominion or of public ownership.
False
True
next question
I will guess
The engineer or architect who drew up the plans and specifications for a building is liable for damages if within sixteen years from the completion of the structu
False
True
Maybe
No answer
A system for the rotation of the Secretariat services among member economies is generally accepted by the Council as a notional timeframe. Commitments made by economies to serve for a period of not less than ___ years
1.5
2
2.5
3
The action must be brought to court within Fifteen years following the collapse of the building.
True
Not sure
False
Passed
Liquidated damages are those agreed upon by the parties to a contract, to be paid in case of breach thereof
Maybe
True
False
No answer
REPUBLIC ACT NO. 396 AN ACT TO ORDAIN AND INSTITUTE THE CIVIL CODE OF THE PHILIPPINES
True
False
Not sure
Passed
These preliminary studies involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making. They represent the Architect’s initial assessment of a project’s soundness, allowing the Client to promptly explore available/ readily identifiable directions / options. Researched / processed / validated secondary data are generally used for such studies e.g. electronic, print, etc.
Pre-Feasibility Studies
Feasibility Studies
Architectural Research
Architectural Programming
Applicants for registration as an APEC Architect must have completed a prescribed period of practical prelicensure or pre-registration diversified experience, as defined by the home economy, for a minimum period equivalent to a total of (a) years.
In computing a period, the first day shall be excluded, and the last day included.
I do not know the answer
True
Not sure
False
The owner of a parcel of land is the owner of its surface and of everything under it
True
False
Maybe
No answer
Applicants for registration as an APEC Architect must satisfy the home economy Monitoring Committee that they have completed a minimum period of professional practice of (a) years;
An _______ ________ is a person who is registered, licensed or otherwise professionally recognized as an architect in a participating economy, and whose name is enrolled on a section of the APEC Architect Register maintained by that economy.
(a)
The aim of the APEC Architect framework is to establish a mechanism to facilitate the mobility of (a) for the provision of architectural services throughout the APEC region by reducing current barriers to the export of professional services.
The owner is likewise responsible for the damages if the edifice falls, within the designated period , on account of defects in the construction or the use of materials of inferior quality furnished by him, or due to any violation of the terms of the contract.
True
Not sure
I do not want to answer
False
the Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).
Pre-Feasibility Studies
Design Brief Preparation
Value Management
Promotional Services
Ignorance of the law excuses no one from compliance therewith.
Maybe
True
False
Not sure
It has the has ultimate responsibility for all matters relating to the APEC Architect framework.
APEC Architects
Central Council
Monitoring Committees
Home Economy
An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces. The formulation of the space program will serve as the basis for the development of the architectural plan / design.
Feasibility Studies
Architectural Programming
Space Management Studies
Space Planning
entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion.
Consultation
Space Planning
Architectural Programming
Architectural Research
prepares change orders, gathers and turns over to the Owner written guarantees required of the Contractor and Sub-Contractors.
Construction Phase
Project Definition Phase
Contract Document Phase
Bidding or Negotiation Phase
Whatever is built, planted or sown on the land of another and the improvements or repairs made thereon, belong to the architect of the land, subject to the provisions of the following articles under the civil code
I will guess
No answer
True
False
APEC stand for
(a)
Which is not a member APEC economies ? Brazil, Malaysia, Canada, New Zealand
(a)
The SPP provides for more than one method of compensation on a project. Each project should be examined to determine the most appropriate and equitable method of compensation.
Professional Fee Plus Expenses
Mixed Methods of Compensation
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
The APEC registration requires that the education as an architect shall comprise at least (a) years of full time study. The education must be of
university level, with architecture the principal component.
This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like
Per Diem, Honorarium Plus Reimbursable Expenses
Professional Fee Plus Expenses
Multiple of Direct Personnel Expenses
Lump Sum or Fixed Fee
This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.
Site Utilization and Land-Use Studies
Feasibility Studies
Site Selection and Analysis
Pre-Feasibility Studies