Font size
Worksheetscopman finalz
Total questions: 97
Worksheet time: 19mins
Establishing the timing of the use of equipment, facilities, and human activities in an organization.
Cost savings
Scheduling
Increases in productivity
Workforce
Effective scheduling can yield:
Increases in productivity.
Setup times
Processing times
Cost savings
Scheduling is not an exact science
chrue
real
wrong
very wrong
Choose the incorrect answer:
SCHEDULING DIFFICULTIES -
Variability in:
Setup times
Processing times
Interruptions
Changes in the set of jobs
Ongoing task for a manager
Minimizing scheduling difficulties can:
Set realistic due dates
Focus on bottleneck operations (more work request than it can process)
Increases in productivity
Consider lot splitting of large jobs.
Controls customer arrivals for service
RESERVATION SYSTEMS
SCHEDULING THE WORKFORCE
SCHEDULING MULTIPLE RESOURCES
APPOINTMENT SYSTEMS
Manages capacity for service
RESERVATION SYSTEMS
SCHEDULING THE WORKFORCE
APPOINTMENT SYSTEMS
SCHEDULING MULTIPLE RESOURCES
Estimates demand for service
RESERVATION SYSTEMS
APPOINTMENT SYSTEMS
SCHEDULING THE WORKFORCE
SCHEDULING MULTIPLE RESOURCES
Coordinates use of more than one resource
SCHEDULING THE WORKFORCE
APPOINTMENT SYSTEMS
SCHEDULING MULTIPLE RESOURCES
RESERVATION SYSTEMS
- Hospitals, police/fire departments, restaurants, supermarkets
- Rotating schedules
SEQUENCING
CYCLICAL SCHEDULING
JOB-SHOP SCHEDULING
FLOW SYSTEM
CHOOSE ALL THE CORRECT ANSWERS:
CYCLICAL SCHEDULING
Set a scheduling horizon.
Identify the work pattern.
Scheduling for high-volume flow system
Develop a basic employee schedule.
Assign employees to the schedule.
SERVICE OPERATION PROBLEMS
- Can store or inventory services.
- Customer service requests are in sequence.
true
false
Scheduling service involves:
Customers Workforce Equipment
Consumers
Employees
Management
Customers
Equipment
Management
High-volume system with Standardized equipment and activities that provide identical or similar operations on customers or products.
FLOW-SHOP SCHEDULING
INTERMEDIATE-VOLUME SYSTEMS
FLOW SYSTEM
HIGH-VOLUME SYSTEM
Scheduling for high-volume flow system
INTERMEDIATE-VOLUME SYSTEMS
HIGH-VOLUME
FLOW SYSTEM
FLOW-SHOP SCHEDULING
NOT AN EXAMPLE OF FLOW-SHOP SCHEDULING:
automobile parts
appliances
car detailing
petroleum refining
HIGH-VOLUME SUCCESS FACTORS
- Process and product design
- Preventive maintenance
- Rapid repair when breakdown occurs.
- Optimal product mixes
- Minimization of quality problems
- Reliability and timing of supplies
false
true
The outputs are between standardized high-volume systems and made-to- order job shops
FLOW-SHOP SCHEDULING
INTERMEDIATE-VOLUME SYSTEMS
FLOW SYSTEM
CYCLICAL SCHEDULING
assignment of jobs to process centers
LOADING
SEQUENCING
JOB-SHOP SCHEDULING
determining the order in which jobs will be processed.
JOB-SHOP SCHEDULING
LOADING
SEQUENCING
Scheduling for low-volume systems with many variations in requirements
SEQUENCING
JOB-SHOP SCHEDULING
LOADING
A _ is a horizontal bar chart developed as production control tool in 1917. It is used to plan, coordinate and track tasks in a project
(a)
A Gantt chart is a horizontal bar chart developed as production control tool in 1917 by _ , an American engineer and social scientist.
Harry L. Grantt
Henry L. Gantt
Henry L. Grantt
Gantt chart is used as a visual aid for loading and scheduling.
true
false
Determine the order in which jobs at a work center will be processed.
WORKSTATION
SEQUENCING
JOB FLOW TIME
JOB LATENESS
An area where one person works, usually with special equipment, in a specialized job.
WORKSTATION
SEQUENCING
PRIORITY RULES
MAKESPAN
PRIORITY RULE ASSUMPTIONS:
The set of jobs is unknown.
true
false
PRIORITY RULE ASSUMPTIONS:
Setup time is independent of processing sequence
true
false
PRIORITY RULE ASSUMPTIONS:
Processing time is deterministic.
true
false
FCFS
(a)
SPT
(a)
EDD
(a)
CR
(a)
S/O
(a)
The length of time that begins when a job arrives at a shop and ends when it leaves the shop.
JOB FLOW TIME
JOB LATENESS
MAKESPAN
AVERAGE NUMBER OF JOBS
The total time needed to complete a group of jobs.
JOB FLOW TIME
JOB LATENESS
AVERAGE NUMBER OF JOBS
MAKESPAN
The length of time the job completion date is expected to exceed the due date.
MAKESPAN
JOB FLOW TIME
JOB LATENESS
AVERAGE NUMBER OF JOBS
Total flow time/makespan.
MAKESPAN
AVERAGE NUMBER OF JOBS
JOB LATENESS
JOB FLOW TIME
“Digitalization makes demarcation of industries useless.”
KOREK
HINDI KOREK????
A sequence of organizations – their facilities, functions, and activities – that are involved in producing and delivering a product or service
SUPPLY CHAIN
SUPPLY CHAIN MANAGEMENT
LOGISTICS
The sequence begins with basic suppliers of raw materials and extends all the way to the final customer.
LOGISTICS
SUPPLY CHAIN
SUPPLY CHAIN MANAGEMENT
THE MORE STEPS IN THE CHAIN THE LESS INVENTORY CARRIED AND THE SHORTER IT TAKES TO MOVE THROUGH THE CHAIN
CHREW
FALSE
The strategic coordination of the supply chain for the purpose of integrating supply and demand management.
SUPPLY CHAIN
SUPPLY CHAIN MANAGEMENT
LOGISTICS
The supply chain managers are involved with planning and coordinating activities that include sourcing and procurement of materials and services, transformation activities and logistics.
TRUE
FALSE
The movement of goods, services, cash, and information in a supply chain.
LOGISTICS
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN
is the integration of the activities that procure materials and services, transform them into intermediate goods and the final product, and deliver them to customers.
SUPPLY CHAIN MANAGEMENT
LOGISTICS
SUPPLY CHAIN
Competition is no longer between companies; it is between _.
(a)
It enables managers to incorporate economics into outsourcing and other decisions, giving them a rational basis for managing their supply chains.
GREENING THE SUPPLY CHAIN
MEASURING SUPPLY CHAIN ROI
INTEGRATING INFORMATION TECHNOLOGY
- Includes corporate responsibility, regulations, and public pressure.
- This may involve redesigning products and services, reducing packaging, choosing green suppliers, managing returns etc.
RE-EVALUATING OUTSOURCING
INTEGRATING INFORMATION TECHNOLOGY
GREENING THE SUPPLY CHAIN
MEASURING SUPPLY CHAIN ROI
Decisions to outsource have been based on lower prices resulting from lower labor costs.
GREENING THE SUPPLY CHAIN
RE-EVALUATING OUTSOURCING
INTEGRATING INFORMATION TECHNOLOGY
MANAGING RISKS
Sourcing is crucial. It affects efficiency and responsiveness in a supply chain.
RE-EVALUATING OUTSOURCING
GREENING THE SUPPLY CHAIN
INTEGRATING INFORMATION TECHNOLOGY
MANAGING RISKS
Produces real-time data that can enhance strategic planning and helps businesses to control costs, measure quality and productivity, respond quickly to problems and improve supply chain operations.
GREENING THE SUPPLY CHAIN
MEASURING SUPPLY CHAIN ROI
INTEGRATING INFORMATION TECHNOLOGY
RE-EVALUATING OUTSOURCING
The supply chain is a major source of risk, so it is essential to adopt procedures for managing risks.
MEASURING SUPPLY CHAIN ROI
MANAGING RISKS
RE-EVALUATING OUTSOURCING
GREENING THE SUPPLY CHAIN
- Ability to focus on core strengths.
- Converting fixed costs to variable costs
- Freeing up capital to devote to other needs.
- Shifting some risks to suppliers
- Taking advantage of supplier expertise
- Ease of expansion outside the home country
POTENTIAL BENEFITS OF OUTSOURCING
CHALLENGES OF OUTSOURCING
- Inflexibility due to longer lead times.
- Increased transportation costs
- Language and cultural differences
- Loss of jobs
- Loss of control
- Lower productivity
- Loss of business knowledge
- Knowledge transfer
- Concern about intellectual property security.
CHALLENGES OF OUTSOURCING
POTENTIAL BENEFITS OF OUTSOURCING
THE PURCHASING CYCLE
a. Purchasing receives the requisition.
b. Purchasing selects a supplier.
c. Purchasing places the order with a vendor.
d. Monitoring orders.
e. Receiving orders.
1- a
2- b
3- c
4- d
5- e
1- e
2- b
3- a
4- d
5- c
1- b
2- d
3- e
4- c
5- a
Purchasing is handled by one special department
CENTRALIZED PURCHASING
DECENTRALIZED PURCHASING
Individual departments or separate locations handle their own purchasing requirements.
CENTRALIZED PURCHASING
DECENTRALIZED PURCHASING
ETHICS IN THE SUPPLY CHAIN
- Opportunities for unethical behavior are enormous and temptations are low.
false
true
ISM
Institute for Supply Management
Institute for Supply Management
Institute for Supply Management
ETHICS IN THE SUPPLY CHAIN
-Many companies have strict rules and codes of conduct that define that define acceptable behavior.
false
true
There are significant management issues in controlling a supply chain involving many independent organizations.
- Mutual agreement on goals
- Trust
- Compatible organizational cultures
MANAGING THE SUPPLY CHAIN
VENDOR SELECTION
NEGOTIATIONS
VENDOR DEVELOPMENT
VENDOR SELECTION
Critical decision
Find potential vendors.
Determine the likelihood of them becoming good suppliers.
NEGOTIATIONS
VENDOR DEVELOPMENT
VENDOR EVALUATION
VENDOR SELECTION
Training
Engineering and production help
Establishing policies and procedures.
VENDOR EVALUATION
VENDOR DEVELOPMENT
NEGOTIATIONS
VENDOR SELECTION
Cost-Based Price Model
Market-Based Price Model
Competitive Bidding
NEGOTIATIONS
VENDOR DEVELOPMENT
VENDOR EVALUATION
supplier opens books to purchaser.
Cost-Based Price Model
Market-Based Price Model
Competitive Bidding
price based on published, auction, or indexed price.
Cost-Based Price Model
Market-Based Price Model
Competitive Bidding
used for infrequent purchases but may make establishing long-term relationships difficult.
Market-Based Price Model
Cost-Based Price Model
Competitive Bidding
A flexible system that uses minimal resources and produces high quality goods and services.
LEAN OPERATIONS
JUST-IN-TIME
Lean systems tend to achieve less productivity, lower costs, shorter cycle time, and higher quality than non-lean systems.
true
false
Which answer does not belong?
LEAN OPERATIONS
a. Cutting costs and operating more efficiently.
b. Creating a productive and engaged workforce.
c. Enhance the stature of the supply management profession.
d. Key strategy in improving internal functions.
a
b
c
d
A highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed.
JUST-IN-TIME
LEAN OPERATIONS
RISK OF LEAN SYSTEMS
a. Reduced cycle time due to elimination of non-value added.
b. Increased stress on workers due to increased responsibilities for equipment changeovers, problem solving and process and quality improvement.
c. Reduced waste due to emphasis on waste reduction.
d. Increased productivity due to elimination of non- value-added processes.
a
b
c
d
EIGHT WASTES IN LEAN PHILOSOPHY
Excess inventory
Overproduction
Waiting time
Unnecessary transporting
Processing waste
Inefficient work methods
Product defects
Underused people
true
false
Try to avoid having workers who are servicing customers also answer telephones.
ELIMINATE WASTE
REDUCE SET-UP TIMES AND PROCESSING TIMES
MAKE THE SYSTEM FLEXIBLE
ELIMINATE DISRUPTIONS
To train workers so that they can handle more variety.
ELIMINATE DISRUPTIONS
MAKE THE SYSTEM FLEXIBLE
REDUCE SET-UP TIMES AND PROCESSING TIMES
ELIMINATE WASTE
This includes errors and duplicate work. Keep the emphasis on quality and uniform service.
MAKE THE SYSTEM FLEXIBLE
REDUCE SET-UP TIMES AND PROCESSING TIMES
ELIMINATE WASTE
MINIMIZE WORK-IN-PROCESS
Have frequently used tools and equipment readily available. For service calls, try to estimate what supplies might be needed so they will be on hand and avoid carrying huge inventories.
ELIMINATE WASTE
REDUCE SET-UP TIMES AND PROCESSING TIMES
MINIMIZE WORK-IN-PROCESS
SIMPLIFY THE PROCESS
This works especially when customers are part of the system (hotel and flight remote check-ins, self- service systems including retail operations, ATMs and vending machines, service stations, etc
SIMPLIFY THE PROCESS
MINIMIZE WORK-IN-PROCESS
ELIMINATE WASTE
REDUCE SET-UP TIMES AND PROCESSING TIMES
The mission of _ is to “make people happy,” and the folks at Disney World are masters at doing that. - They realize that waiting in lines at attractions does not add to the enjoyment of their customers. They also realize that customers waiting in lines are not generating the revenue that they would if they visited restaurants and souvenir shops. Hence, they have several reasons for wanting to reduce waiting lines.
(a)
Waiting lines occur when there is temporary imbalance between supply (capacity) and demand.
true
false
_ add to the cost of operation and they reflect negatively on customer service.
(a)
IN LEAN SYSTEMS, WAITING IS ONE OF THE SEVEN WASTES.
false
true
Having to wait for service can range from being acceptable (short waits), to being annoying (longer waits), to being a matter of life and death (in emergencies).
FOR BUSINESSES
FOR CUSTOMERS
FOR SOCIETY
The costs of waiting come from lower productivity and competitive advantage.
FOR BUSINESSES
FOR CUSTOMERS
FOR SOCIETY
The costs are wasted resources (fuel consumption of cars stuck in traffic) and reduce quality of life.
FOR BUSINESSES
FOR CUSTOMERS
FOR SOCIETY
Mathematical approach to the analysis of waiting lines.
QUEUING THEORY
QUEUING PROCESS
QUEUING SYSTEM
is directly applicable to a wide range of service operations, including call centers, banks, post offices, restaurants, theme parks, hotels, telecommunication systems.
(a)
is important because Customers regard waiting negatively. Customers may tend to associate this with poor service quality, especially if the wait is long.
Queuing theory
Queuing analysis
Queuing process
WHAT CAUSES WAITING LINES TO FORM? WHY IS IT IMPOSSIBLE TO ELIMINATE THEM COMPLETELY?
- Waiting lines tend to form even though a system is basically underloaded.
true
false
WHAT CAUSES WAITING LINES TO FORM? WHY IS IT IMPOSSIBLE TO ELIMINATE THEM COMPLETELY?
- In reality, customers arrive at random intervals rather than at evenly spaced intervals, and some orders take longer to fill than others.
false
true
Using part-time workers during busy periods may be possible. Tradeoffs might involve training costs, quality issues, and perhaps slower service than would be provided by regular workers
USE TEMPORARY WORKERS
SHIFT DEMAND
STANDARDIZE THE SERVICE
Lower prices to shift demand from busy times to slower times. Restaurants offer “early-bird specials” to accomplish this. Some retail businesses offer coupons that are valid only for certain (slow) days or times.
USE TEMPORARY WORKERS
SHIFT DEMAND
STANDARDIZE THE SERVICE
LOOK FOR A BOTTLENECK
The more service can be standardized, the greater the impact on waiting lines.
USE TEMPORARY WORKERS
SHIFT DEMAND
STANDARDIZE THE SERVICE
THE PSYCHOLOGY OF WAITING
One aspect of a process may be largely responsible for a slow service rate; improving that aspect of the process might yield a disproportionate increase in the service rate.
THE PSYCHOLOGY OF WAITING
LOOK FOR A BOTTLENECK
STANDARDIZE THE SERVICE
SHIFT DEMAND
Several factors can influence the difference between the actual time customer spend waiting and their perceived time.
STANDARDIZE THE SERVICE
LOOK FOR A BOTTLENECK
THE PSYCHOLOGY OF WAITING
SHIFT DEMAND
MANAGING WAITING LINES AT DISNEY WORLD
1 Provide distractions.
2. Provide alternatives for those willing to pay a premium.
3. Keep customers informed.
4. Exceed expectations.
5. Provide comfortable waiting environment and keep lines moving.
agree
very agree
super agree
