What is the maximum allowable slope for PWD ramps, according to BP 344?
10%
12%
1:10
1:12
What is the minimum dimension of the required turnabout space for walkways and what should be the maximum distance between two turnabout spaces?
Minimum dimension of 1.20m, maximum distance of 15.00m
Minimum dimension of 1.50m, maximum distance of 12.00m
Minimum dimension of 1.20m, maximum distance of 12.00m
Minimum dimension of 1.50m, maximum distance of 15.00m
What are the minimum dimensions required for elevators?
Hoistway inside dimensions of 1.10m x 1.40m
Car inside dimensions of 1.10 x 1.40m
Hoistway inside dimensions of 1.10 x 1.70
Car inside dimensions of 1.10 x 1.70
What is the maximum travel distance allowed for accessible elevators?
10.00m from entrance
15.00m from entrance
20.00m from entrance
30.00m from entrance
For PWD washrooms, what is the maximum height allowed for a lavatory counter?
750 mm
800 mm
900 mm
1200 mm
What is the minimum headroom for walkways according to BP 344?
1.8 m
2 m
2.1 m
3 m
1:20
1:12
1:18
1:24
Any physical change made on a building/structure to increase its value, utility and/or to improve its aesthetic quality.
Alteration
Renovation
Addition
Modification
This person is tasked with the enforcement of the National Building Code in his or her jurisdiction. He/she issues, denies, suspends, or revokes building permits.
Secretary of the DPWH
Building Official
construction inspector
barangay captain
Before using or occupying a completed building, this document must be issued first.
Bldg permit
Cert of Inspection
Cert of Compliance
Cert of Occupancy
The Building Code requires that the owner hire a full-time inspector for the construction. This inspector must be a:
Licensed Architect
Licensed CE
Licensed Contractor
The general provision of PD 1096 or the National Building Code of the Philippines are? (sec. 104)
Maintain building in safe, sanitary and good working conditions
Adequate environmental safeguards
Safe construction
All of the above
What is the minimum distance required between roof eaves and rear/side property lines?
500mm
750mm
1000mm
1500mm
What is the minimum area for habitable rooms, according to the National Building Code?
1.2sqm
3sqm
6sqm
12sqm
For forest areas, the NBC requires at least _____ of easement for each side of the waterway.
3m
10m
20m
40m
Where do you register for Partnership?
Department of Trade and Industry
Securities and Exchange Commission
Where do you register for sole proprietorship?
Department of Trade and Industry
Securities and Exchange Commission
In this phase, you are tasked to submit the program, budget, schedule, and initial line drawings. You are also tasked to send a Statement of Probable Project Construction Cost (SPPCC).
Pre-design services
Schematic Design Phase
Bidding Phase
Project Definition Phase
In this phase, you are to submit the plans, elevations, sections, outline specifications and construction systems. You are also tasked to send the updated SPPCC in line with your design. What phase is this?
Schematic Design Phase
Design Development Phase
Contract Document Phase
Construction Phase
Professional fee for Consultants per appearance
1,000php
576php + gas money
5,000php
1,000 + lunch
It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.
Architectural programming
Space programming
Space planning
Consultation
The architect was asked to analyze the site's potentials, the context of the site as well as its surroundings. Which service was rendered?
Architectural programming
Site utilization and land-use studies
Site selection and analysis
Consultation
Which is NOT true of architectural design competitions?
They may be expensive
They are open only to architects and not architectural firms
They may be time-consuming
All of these are true
Which selection method is appropriate for civic projects?
Direct selection
Comparative selection
Architectural design competition
Bidding
Which term does not belong?
Contractor
General Contractor
Manufacturer
Builder
In this service, the architect determines the adequate size and appropriate configuration for a proposed project considering the use, allocation, and interface of spaces for given activities.
Space management studies
Space planning
Architectural programming
Site utilization studies
Which method of selection is appropriate for monumental projects?
Bidding
Competition
Direct selection
Either B or C
They represent the architect’s initial assessment of a project’s soundness generally using researched, processed, and validated secondary data.
Pre-feasibility study
Appraisal
Business plan preparation
Feasibility study
In this phase of the regular design service, the architect prepares the initial line drawings representing design studies that will lead to a recommended solution
Project definition phase
Schematic design phase
Design development phase
Pre-design phase
Is it the duty of the architect to review the contractor’s billings and issue Certificates of Payment during the regular design service?
Yes, this is part of the regular design service
No, this is not part of the regular design service
Only if the architect will be hired to perform construction management services as well.
Both B and C
What is the full title of RA 9266?
The Architecture Act of 2004
An Act Providing For A More Responsive And Comprehensive Regulation For The Registration, Licensing And Practice Of Architecture
Standards of Professional Practice
Code of Ethical Conduct
The Code of Ethical Conduct is an integral part of what ?
UAP Documents on services of the Architect
Civil Code of the Philippines
Architect's National Code
National Building COde
Aside from the people and country, who does the architect give supreme oath to?
God
Client
Colleagues
Subordinates
Allan , a 5th year student is commissioned by Mr. & Mrs. ABC to design a house.
Allan had the plans signed by his professor Architect petmalu. Who is Unethical?
Mr. & Mrs. ABC
Allan
Allan and Arch. Petmalu
All of them
(Allan prepared plans signed by Arch. Petmalu)
Who can be reprimanded by the PRC?
Arch. Petmalu
Allan and Arch Petmalu
Allan and Mr. / Mrs. ABC
All of them
A client wants your design to be the same with another Architect. What should you do?
Use the same design
Forego with the Project
Do a Different design
Adapt only the design concept
As the Architect of the project, you have been instructed from a persistent client that a design he saw in another building should be copied. What can you do to tell the client that his kind of practice is unethical?
Follow the instruction of the client because his opinion is very important
Try to follow the clients request but make subtle changes to make the design to look different
Try to convince the client to change design even with the risk of loosing him
Ignore the client and proceed with your design
How much will the Architect pay if he/she Violates the Code of Ethical Conduct?
P100,000
P150,000
P5,000,000
P200,000
Architect X is Celebrating the 25th year anniversary of his office. He wants to be featured on a magazine. To lessen the amount that will be spent on being published, with his consent, he allowed his friend who is a writer to solicit from advertisers under his name.
Is there anything wrong here? If there is, what/who is wrong in this situation?
Nothing is wrong. This was done with everybody's consent and nobody was coerced into doing anything
Architect is Liable
The Writer friend of Architect X
The advertisers
What is the extent of site visits the architect must conduct in the course of rendering the regular design service?
Periodic
Once a week
Twice a week
Twice a month
In this phase, the architect prepares the initial line drawings representing design studies leading to a recommended solution, including a general description of the project for approval by the Owner.
Predesign phase
Consultation phase
Schematic design phase
Conceptual design phase
How many sets of drawings should the architect give to the client as part of the regular design service?
3 sets
5 sets
7 sets
9 sets
In direct selection, which should NOT be a basis of the client for selecting an architect?
Architect's reputation
Recommendation of a friend
Recommendation of another architect
Sketches submitted by the architect for the contemplated project