1.

Performance based contract is also known as

a)

Key Performance Indicator

b)

Comprehensive Contract

c)

Term Contract

d)

Service Level Agreement

e)

Non comprehensive Contract

2.

Which scenario would you use SOR in Ad-hoc contract (2 Correct Answers)

a)

Buying 20 set of office system furniture at $40,000

b)

Façade repair that cost $200,000 and will take 5months to complete

c)

Install 5 power socket outlet for $400 in the office

d)

Replacing 2 unit of AHU costing $40,000

e)

Replace 5 urinal sensors at $300 for the male toilet in the building 

3.

Which scenario would you use SOR in term contract ?

a)

Monthly testing of Public Address system for the building

b)

Spare part replacement for the Public Address system

c)

Daily cleaning service for the building for 2 years

d)

Quarterly testing of the emergency generator system

4.

Which are the 3 components in Service Level Management

(3 Correct Answers)

a)

Service Element

b)

Service Performance

c)

Service Requirement

d)

Service Management

e)

Service Measurement

5.

Advantages of SOR contract (3 Correct Answers)

a)

Simplify and shorten time request for work to be carry out

b)

Requires technical knowledge for supervision of contract execution

c)

Reduce price fluctuation, variation and cost uncertainty

d)

Facility owner need not provide complete design

e)

Negotiation necessary during procurement stage

6.

Disadvantages of SOR contract (4 correct answers)

a)

Effort needed to identify the scope in the contract to ensure contract covers all the work needed (task, labour, material etc)

b)

Higher fees for smaller projects

c)

No incentive for Cost control by contractor.

d)

Facility owner need not provide complete design

e)

Negotiation necessary during procurement stage

7.

Contract stated that “Cleaners to provide cleaning service from 9am to 6pm from Monday to Sat”” is an example of _______under the Service Element

a)

Work Scope

b)

Conditions of Services available

c)

Service Standard

d)

Service Effectiveness

8.

Contract stated that “Cleaners to response to site within 10min upon receiving feedback/ complaint on the cleanliness of the toilet” is an example of ________ under the Service Element

a)

Work Scope

b)

Condition of Services available

c)

Service Standard

d)

Service Effectiveness

9.

Contract include the clause on “Quantum for Liquidated Damages” which is an example of _____________under the Service Element

a)

Assessment mode

b)

Service Standard

c)

Non Compliance Recourse

d)

Service Effectiveness

10.

Definition on Extension of Time for a purchasing contract for office equipment

a)

Additional time given to supplier to complete their production

b)

Additional time given to supplier beyond the period indicated in the contract

c)

Additional time given for both parties to fulfil their obligation

d)

Additional time given to supplier to obtain the necessary certification

11.

Why is Good Tenant Management important for the

Facility Owner (3 correct answers)

a)

Major source of revenue from the leasing of space

b)

Better mix of tenants and more choices for shopper in a shopping malls

c)

Tenant are likely to recommend their subsidiaries, associate companies to the property

d)

Tenant may obtain lower rental rates for their space leases

e)

Major/ Key tenant raised the prestige of the property and therefore helps to attract new tenants

12.

Which of the following is the 1st step in handover (landlord) and takeover (tenant)

a)

Defect Identification with landlord committing to a rectification dates. If defect is minor, keys to premises will be handed over

b)

Scheduling of joint inspection with the tenant

c)

If the state of premises is materially different from what is agreed in the lease agreement, tenant can choose to defer to the handover and another handover date will be arrange

d)

Tenant will be handed the keys to the unit on date stipulated in the contract

13.

Which of the following is the 2nd step in handover (landlord) and takeover (tenant)

a)

Defect Identification with landlord committing to a rectification dates. If defect is minor, keys to premises will be handed over

b)

Scheduling of joint inspection with the tenant

c)

If the state of premises is materially different from what is agreed in the lease agreement, tenant can choose to defer to the handover and another handover date will be arrange

d)

Tenant will be handed the keys to the unit on date stipulated in the contract

14.

What are the ways to improve service delivery (3 correct answers)

a)

Provides value added services

b)

Put in place customer service orientated process

c)

Offering rental rebates or discount to the tenant

d)

Continuous Improvement to tenant satisfaction

e)

Provide tenant with discounted season parking lots

15.

Advantage of Good / Effective Procurement Practices (4 correct answers)

a)

Efficient Workflow

b)

Increased Saving

c)

Shorter Contract Period

d)

Assess and Enhance Supplier Performance

e)

Less dispute

16.

Scope of Work is set of document that define (3 correct aswers)

a)

Budget

b)

Work Activities

c)

Deliverables

d)

Timeline

e)

Contract Term and Conditions

17.

The followings are covered during Vendor Qualification except

a)

Financial Status

b)

Performance History

c)

Work Quality

d)

Shareholders / Ownership

18.

The following are resons why Single Source is used except

a)

For emergency where time / safety is crucial factor

b)

Lack of leadtime to prepare for procurement

c)

Work can only be carried out by Specialist Services

d)

International Agreement directed by HQ

19.

The following are advantages of E-bidding except

a)

Monitoring of bidder

b)

Easy comparison of bids

c)

Ease and Speed of communication to multiple bidders

d)

Large pool of bidder available

20.

Do you think you are ready for the Test ?

a)

Can Pass

b)

Can do Well

c)

Think will fail

d)

Will leave it to Almighty