MCQ Test on Unit1(BCATY)

Total questions: 20

Worksheet time: 11mins

Name
Class
Date
1.

System study involves_____

a)

the study of an existing system

b)

documenting the existing system

c)

identifying current deficiencies and establishing new goals

d)

All of the above

2.

______ is an orderly grouping of independent components linked together
according to a plan to achieve a specific objective or goal.

a)

System

b)

Software

c)

Subsystem

d)

Physical system

3.

Which of the following is not element of system

a)

control

b)

interfaces

c)

environment

d)

risk​

4.

We can define information system as a set of devices, procedures, rules but most of the
work performs manually

a)

Formal Information system

b)

Manmade Information system

c)

Informal information system

d)

All of above

5.

-------- refers to the process of examining a business situation with the intent of improving it
through better procedures and methods.

a)

Software Anticipation

b)

Software Investigation

c)

Software Requirement

d)

System analysis

6.

-----------the system which are represented conceptually non Physical systems are called

a)

Abstract system

b)

System model

c)

Open system

d)

Closed system

7.

During the maintenance phase

a)

System requirements are established

b)

System analysis is carried out

c)

Programs are tested

d)

None of the above

8.

Problem analysis is done during_____

a)

system design phase

b)

systems analysis phase

c)

before system test

d)

All of the above

9.

SDLC is ___ process for building System.

a)
  1. Efficient

b)
  1. Non systematic

c)
  1. A systematic

d)
  1. None of these

10.

The requirement analysis is a detailed analysis which includes the answer of,

a)
  1. What is the problem? What is the solution? Is solution feasible?

b)
  1. How much time required solving the problem? How it will be resolved?

c)
  1. How many resources will be required?

d)
  1. All of the mentioned above

11.

With reference to System design, which of the following is correct,

a)
  1. System design is a blueprint of proposed solution

b)
  1. It creates logical design

c)
  1. If any changes required, analysts redesign it.

d)
  1. All of the mentioned above

12.

Identify missing SDLC phase,
Problem identification → Requirement analysis → ___ → Development → Testing → Implementation → Deployment Maintenance

a)
  1. System print

b)
  1. System design

c)
  1. System hardware

d)
  1. None of the mentioned above

13.

What is the purpose of a feasibility study?

a)

To determine if a project is technically feasible

b)

To determine if a project is financially feasible

c)

To determine if a project is socially feasible

d)

To determine if a project is politically feasible

14.

A system analyst is responsible for analyzing, designing and implementing systems to

fulfill organizational needs.

a)

false

b)

true

15.

The main aim of a system is to produce _____

a)

an output

b)

an element

c)

an input

d)

uncommon objective

16.

A system consists of elements that function in this way:

a)

simultaneously

b)

interdependently

c)

autonomously

d)

exclusively.

17.

"Open-closed" refers to the amount of interaction a group has with its _____________.

a)

Boundary

b)

Environment

c)

Input and output

d)

processor

18.

What of the following is an operational component of the system?

a)
  1. Input device

b)
  1. RAM

c)
  1. Processor

d)

None of the above mentioned

19.

SAAD is a systematic procedure to develop or redesign a system.

a)
  1. True

b)
  1. False

20.
  • The most important role of a systems analyst in business is ____.

a)

Technical understanding of information systems

b)

Problem solving

c)

  • Knowing what data needs to be stored and used

d)

Special programming skills