wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

PRO PRAC 2 - REVIEWER

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

The member of the board shall hold office for a term of _____ after appointment or until their successors shall have been appointed and duly qualified.

a)

6

b)

3

c)

4

d)

2

2.

Who shall develop the CPD program for architects?

a)

The CPD providers

b)

The academe

c)

The IAPOA

d)

The PRBArch

3.

Who shall prepare the syllabi for the licensure exams?

a)

The PRC

b)

The PRBArch

c)

The UAP

d)

The IAPOA

4.

The proprietary rights to an architectural work by a person who commissions the Architect.

a)

Ownership

b)

Copyright

c)

Authorship

d)

Property

5.

Directly and professionally responsible for the total design of the project.

a)

Consulting Architect

b)

Architect in charge of construction

c)

Architect of record

d)

Architect

6.

An architect who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture

a)

Architect

b)

Professional Architect

c)

Consulting Architect

d)

Architect-of-Record

7.

Does the architect have the right to control the construction of any building that only partly reproduces his design?

a)

Yes.

b)

No.

c)

Only if the design is copied exactly, without any modifications.

d)

Only if the owner of the building hired the architect to design the building.

8.

Only if the owner of the building hired the architect to design the building.

a)

Sec. 1

b)

Sec. 18

c)

Sec. 24

d)

Sec. 33

9.

What is the full title of RA 9266?

a)

The Architecture Act of 2004

b)

An Act Providing For A More Responsive And Comprehensive Regulation For The Registration, Licensing And Practice Of Architecture

c)

Standards of Professional Practice

d)

Code of Ethical Conduct

10.

Section 28

a)

Prohibition in the practice of architecture and penal clause

b)

Continuing Professional Development

c)

Signing of architectural plans, specifications and other contract documents

d)

Ownership of plans, specifications and other contract documents

11.

Are foreign consultants required to register with PRC?

a)

Yes

b)

No

c)

Maybe

d)

It depends

12.

Who nominates persons for each position in the PRBArch?

a)

The IAPOA

b)

The outgoing members of the PRBArch

c)

The President of the Philippines

d)

Any registered and licensed architect may nominate persons for vacant positions in the PRBArch

13.

An act to Regulate the Practice of Architecture in the Philippines

a)

RA 545

b)

RA 9266

c)

PD 1096

d)

BP 220

14.

the one who Establish and maintain high standards of admission to all

professions Ensure and safeguard the integrity of all licensure examinations.

a)

The PRC

Commissioners

b)

The PRC

Chairperson

c)

The DPWH Secretary

d)

The CHED

Commissioner

15.

SEC

a)

Securities and Exchange Commission

b)

Security and Exchange Composition

c)

Securities and Exchange Company

d)

Security and Exchange Commision

16.

All of the following are grounds for the disqualification of any nominee for a PRBArch position except for which one?

a)

The nominee is an officer of the UAP.

b)

The nominee is an officer of a professional organization for architects that is not the UAP.

c)

The nominee has never taught at a school, university, or review center teaching architecture courses.

d)

Both B and C

17.

Issuance of certificates of registration and professional identification card

a)

Sec. 18

b)

Sec. 33

c)

Sec. 24

d)

Sec. 17

18.

RA 9266 repeals

a)

RA 454

b)

PD 1096

c)

RA 545

d)

RA 9266

19.

All subjects for licensure examinations shall be taught by persons who are

holders of valid certificates of registration and valid professional licenses of

the profession and who comply with the other requirements of the _______

a)

PRC

b)

Civil Service

Commission

c)

CHED

d)

PR-BOA

20.

The term “architectural company” is synonymous to


a)

Architectural corporation

b)

Architectural partnership

c)

Sole proprietorship

d)

The term “architectural company” may refer to all three.

21.

It guarantees the compensation and scope of services rendered by an Architect

a)

Sign and Seal

b)

CoR and PIC

c)

Service Agreement

d)

Per square meter

22.

Suspension and Revocation of certificates of registration, professional identification card or the special/temporary permit.

a)

Sec. 45

b)

Sec. 3

c)

Sec. 23

d)

Sec. 24

23.

PCAB

a)

Philippine Contractors Accreditation Board

b)

Philippine Commission Accredited Board

c)

Philippine Contractor Accredited Board

d)

Philippine Contractors Architects Board

24.

In case of a discontinued project, can anybody use the architectural documents without the consent of the architect?

a)

No

b)

Yes

c)

Maybe

d)

It depends

25.

What does PRC mean?

a)

Philippine Regulatory Commission

b)

Professional Regulatory Commission

c)

Philippine Regulation Commission

d)

Professional Regulation Commission

26.

Foreign nationals need a temporary or special permit to practice architecture in the Philippines. Where can this special permit be obtained?

a)

From the PRBArch

b)

From the local counterpart

c)

From the Department of Foreign Affairs

27.

The architect who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans.

a)

Architect

b)

Architect-of-Record

c)

Architect-in-Charge-of-Construction

d)

Professional Architect

28.

The intellectual property rights retained by an architect over any architectural documents/work that he/she prepares unless there is a written stipulation to the contrary.

a)

Property

b)

Ownership

c)

Authorship

d)

Copyright

29.

Reciprocity Requirements

a)

Section 27

b)

Section 33

c)

Section 3

d)

Section 18

30.

the existing official national organization of all architects of the Philippines in which all registered Filipino architects shall be members without prejudice to membership in other voluntary professional associations;

a)

IAPOA

b)

PRC

c)

UAPGA

d)

PRBArch

31.

Who shall have the responsibility of developing a continuing professional development programs for architects?

a)

PRBoa

b)

UAP

c)

PIA

d)

PRC

32.

How much of the owners, shareholders, etc. of architectural corporations must be registered and licensed architects?

a)

50% + 1

b)

At least 50%

c)

75% + 1

d)

At least 75%

33.

Also known as the Professional Regulation

Commission (PRC) Modernization Act of 2000.

a)

RA. 9266

b)

RA. 8981

c)

RA. 8189

d)

PD. 8981

34.

A certificate bearing a registration number signifying that the individual has successfully passed the licensure examination and is registered to practice his/her profession as architect

a)

Certificate of Examination

b)

Certificate of Registration

c)

Certification of Licensure

d)

Professional Certification

35.

The following are considered part of the contract documents, except for:

a)

Code of Ethical Conduct

b)

Standards of Professional Practice

c)

UAP Document

d)

None of these are part of the contract documents

e)

Both A and B

36.

A duly notarized written contract stipulating the scope of services and guaranteeing compensation for such services that the architect will render.

a)

Scope of Work

b)

Proposal

c)

Preliminary Conditions

d)

Service Agreement

37.

Who is directly and professionally responsible and liable for the construction supervision of the project

a)

AICC

b)

AOR

c)

EXO

d)

CA

38.

Documents which define all aspects of professional service, prescribes minimum basic fees and establishes the rights and obligations of both the architect and the client.

a)

Code of Ethical Conduct

b)

Standards of Professional Practice

c)

Schedule of Fees

d)

Architect's Credo

39.

Which of the following is true?

a)

All registered and licensed architects may join any organization for architects.

b)

All registered and licensed architects are required to be members of the UAP because it is the IAPOA.

c)

Both A and B

d)

All of the above are false

40.

Monitor the performance of schools in licensure

examinations and post the results to the public.

a)

UAP

b)

Civil Service

Commission

c)

PRC

d)

CHED

41.

The Architect shall accept offer of free professional engineering or

allied design service/s, or receive any substantial aid,

gifts, commissions, or favors from any Contractor or

Sub-contractor which will tend to place him/her in any

kind of obligation to return such favors.

a)

TRUE

b)

FALSE

42.

Any formal grouping or two or more architects or architectural firms working in joint venture on a project basis.

a)

Architectural Company

b)

Corporation

c)

Association

d)

Company

43.

Means an individual architect practicing and delivering architectural services, duly registered with the DTI, BOA and the PRC.

a)

Architect

b)

Sole proprietorship

c)

Engineer

d)

Contractor

44.

How often must the Certificate of Registration be renewed?


a)

Every year

b)

Every three years

c)

It never expires.

d)

It must be renewed whenever the PRC ID is renewed.

45.

Short Title of RA 9266

a)

Architecture Law of 2004

b)

Law of Architecture 2004

c)

Architecture Act of 2004

d)

Actitecture of 2004

46.

As per Article 2 Section 7 : the following are the powers and function of the board except

a)

Prescribe and/or adopt the Code of Ethical Conduct and Standards of Professional Practice

b)

Administer oaths in connection with the administration of R.A. No. 9266

c)

Monitor the conditions affecting the national building code

d)

Hear and decide administrative cases involving violations of R.A. No. 9266

47.

Who shall file a case against a person illegally practicing architectural services?


a)

Architect

b)

Engineer

c)

Client

d)

Any individual

48.

the Architect shall not seek commissions, discounts, or favors from firms handling

building materials which may place him/her in a reciprocal frame of

mind. All market discounts shall be credited to the Client.

a)

TRUE

b)

FALSE

49.

The local philippine architect, partnership or corporation that must work in association with a foreign architect, partnership or corporation, on a project on Philippine soil.

a)

Foreign Architect

b)

Filipino Counterpart

c)

Ownership

d)

Architect

50.

Based on the Civil Code of the Philippines, how long is the mandated civil liability of the design professionals?

a)

3 years

b)

10 years

c)

15 years

d)

10 months