Worksheets

Work Order vs IMAC

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

A branch requesting more power outlets

a)

IMAC Request

b)

Work order

2.

Request a new primary phone number

a)

work order

b)

Imac Request

3.

Workstation has power but won't boot

a)

Work Order

b)

IMAC

4.

Install a new tv

a)

Work order

b)

Imac Request

5.

A branch receives new equipment such as a router that needs to be installed

a)

A work order should already be opened but you can reach out to cbiz to confirm

b)

An IMAC request should already be opened but you can reach out to IMAC to confirm

6.

A branch wants a phone moved

a)

Work order

b)

IMAC request

7.

A branch needs longer cables for equipment

a)

Work Order

b)

IMAC

8.
  • Branch's existing/installed monitor won't turn on

a)

Work order

b)

IMAC

9.
  • Branch's printer is producing streaks 

a)

Work Order

b)

IMAC

10.
  • Branch's existing secondary printer won't power on


a)

Work Order

b)

IMAC

11.
  • BOA's keyboard is not working. The branch does not have a spare workstation or keyboard to use. 


a)

Work order

b)

IMAC

12.
  • BOC Beeping


a)

Work order

b)

IMAC

13.

Printer is making noises and won't print

a)

Work order

b)

IMAC

14.
  • Branch is insisting on replacing their large BOC with a smaller BOC

a)

Work Order

b)

IMAC

15.

Branch wants their personal monitors installed

a)

CBIZ

b)

IMAC

16.
  • Branch is requesting assistance with assembling sit/stand desk or tray for keyboard. 

a)

Work Order

b)

IMAC

17.

Branch was remodeled and they need their equipment reconnected

a)

Work Order

b)

IMAC

18.

Branch unplugged their workstation and cannot get it reconnected

a)

Work order

b)

IMAC

19.

add, move, or remove Edward Jones provided equipment

a)

Work Order

b)

IMAC

20.

Maintenance and Break/Fix Issues 


a)

Work Order

b)

IMAC