Day 2 Test topics

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

What must be presented to start the demolition work?

a)

letter from owner

b)

demolition permit

c)

brgy permit

d)

ntp

2.

the bldg permit shall not be issued by the local bldg official w/out this doc

a)

locational clearance

b)

arch signiture

c)

assesors receipt

d)

brgy permit

3.

what leetter shall be secured from brgy office before demolition

a)

2 pcs brgy clearance

b)

brgy request letter

c)

brgy clearance

d)

2pcs brgy request letter

4.

A written communication issued by the owner authorizing the contractor to proceed with the work and establishing the date and commencement

a)

contract

b)

bidding

c)

ntp

d)

notice if award

5.

what else must be presented to start the const work?

a)

letter from owner

b)

construction clearance

c)

brgy clearance

d)

ntp

6.

compliance to the cost of installed equipments, materials, and labor directly involved in the physical const of a permanent facility

a)

direct cost

b)

indirect cost

c)

const cost

d)

contract cost

7.

what tpe of payment mode is applicable in labor cost of painting works?

a)

pre sqm w/ multiplier

b)

fixed rate

c)

daily rate

d)

all

8.

How is the cost of labor for a small residential const renumerated?

a)

per sqm cost

b)

fixed rate

c)

daily rate

d)

lump sump cost

9.

the technique of measuring quantities from dwgs, sketches and specs prepared by designers, architects and engrs in order to prepare tender or contract docs

a)

quantity takeoff

b)

detailed estimate

c)

WBS

d)

take off of specs

10.

improvement of slum, deteriorated and underutilized areas of the city

a)

urban design

b)

environmental planning

c)

urban renewal

d)

environmental assessment

11.

it also called the blood stream of the city

a)

freeways

b)

networks

c)

communications

d)

transportation

12.

an efficient and rapid transport system for automobile to circulate across urban to urban

a)

skyways

b)

street

c)

freeways

d)

major roads

13.

the projection of a future pattern of use wthin an area, as determined by development goals

a)

land use plan

b)

land survey

c)

site devt plan

d)

land devt plan

14.
a)

physical analysis

b)

site analysis

c)

development analysis

d)

land use analysis

15.
a)

infra & utilities plan

b)

physical plan

c)

devt plan

d)

land use plan

16.
a)

the area is primarily residential

b)

the area is primarily industrial disctrict

c)

the area is primarily a commercial/shopping district

d)

the area is primarily a multi-family residential district

17.
a)

agriculture use

b)

agriculture farming value

c)

productive use

d)

productive farming value

18.

a)

Rezoning

b)

Variance

c)

Spot Zoning

d)

Exception

19.
a)

Exaction

b)

Improvement standards

c)

Growth management controls

d)

City parks and leisure space

20.
a)

Flexible zoning

b)

approved zoning

c)

spot zoning

d)

exception