Building name & Architect?
Le corbuiser & Zurich Pavillion
Le corbuiser & Palace of Assembly
Kengo kuma & Daiwa Ubiquitos Researh Bldg.
Zha Hadid & Heydar Pavillion
Name of Building & Architect?
East Building, National Gallery of Art & I.M. Pei
Frederick Robbie House & Frank Lloyd Wright
Robbie House & Frank Loyd Wright
Villa Savoye & Le Corbuiser
Name of the Building & Architect?
One Central Park & Jean Novel
Heydar Aliyev Center & Zha Hadid
East Building, National Gallery of Art & I.M. Pei
National Congress & Oscar Niemeyer
The current UAP national president
ar. robert mirafuente
ar. yolanda d. reyes
ar. robert sac
ar. benjamin M. garcia
Year was the UAP stablished
Nov. 15, 1976
May 12, 1975
Sept. 13, 1978
August 14, 1969
Situational: The architect asked by his client to design a
commercial building which is located near the luneta park. The
partial of the land was purchased by the owner from the
goverment, as he comissioned by the owner. What is the
appropreate responsibility of the architect to the public?
he shall respect and conserved the system of
values and heritage of the community in
which he creates architecture.
he will continue to design in accordance to
the client's requirements on the project.
he will incourage the clients to buy another
land in replaced for the project.
he will advised the client that the location is
not suitable for the proposed project.
Situation: Mr. Yao is a very studious person. He first graduated
as a Civil Engineer and then after passing the Licensure
Examination for Civil Engineers decided to continue his studies
and ultimately became a Registered and Licensed Architect.
Not yet contented, he also passed the Master Plumber
Licensure Examinations. As a professional with so many
license, he became very busy with his numerous projects as
he too become a Contractor.A. Because Mr. Yao is so busy, he
can no longer handle the construction of his own house. He
hires a person to supervise its construction. To whom is this
person technically under?
Owner
Contractor
Architect
Engineer
What do you do next?
Go back to your old job and make it better.
Look for greener pasture
Get ready for the Oath taking
Put-up your own firm
This is an “Alternative” start to a career in Architecture.
Work as an employee in an Architectural
Firm to gain more experience
Take a risk and establish your own firm
Establish a Firm with your friends
Go Qatar
You want to be updated on the latest trends in Building and
Construction. What should you do?
Attend social activities of your Professional
Organization
Be an active member of your Professional
Organization
Stablish an organization
Go and search on the internet
Due to your excitement at being a new Architect, you
misplaced you PRC Identification Card. You applied at PRC for
a replacement ID. How long will you wait to get your ID card?
1 week
1 month
1 Day
1 Hour
Due to the flooding and leaks, the whole house had to be
rewired. After a successful mediation, Architect “A” continued
with the project. How are Electricians paid?
Lump sum
Per outlet, switches and complexity
Ask the Contractor
Based on Material Cost
Situation: Boss R. has been working at doha qatar for almost
15 years but he feels incomplete since he was not able to take
the licensure examination when he was still in the Philippines.
He heard that the PRBoA is going to conduct FLEA at Doha Qatar.
He asks his family to send his Transcript of Records, Birth
Certificate and Diploma, What else does he need to be able
to take the FLEA?
Diversified Training Logbook signed and
sealed by a Filipino RLA
Certificate of Employment from his company
showing his tenure and position
Recommendation Letter from the Consulate
employment certificate
After Boss R. passing the FLEA, his company had big project. He was
the one who made all the drawings. To whom is he liable to?
To the company
To the Philippine Government
To the Qatar Government
None
After passing the FLEA, who can administer his Professional
Oath?
Any Registered and Licensed Architect
working abroad
The Ambassador of the Philippines Embassy
The PRBoA will hold a special Oath taking
Ceremony
none of the above
Situation: Rommel passed the ALE with flying colors and came
back to his old job in Bahrain. His boss was so impressed,
that he wanted to put up an architectural firm here in the
Philippines, What should Rommel's boss do to practice
architecture in the Philippines?
He should collaborate with a Filipino
Firm/Architect and be partners, to be able to
practice architecture in the Philippines
He should register his firm and begin
practicing architecture in the Philippines
He is not allowed to put up an architectural
firm in the Philippines
He could practice architecture in the
Philippines anytime he wants
Situation: Three siblings decided to form their own
architectural firm. One is an Architect, another is an Engineer
and the last is an Interior Designer.G. How much should be the
architectural composition of the corporation?
60%
65%
75%
85%
Situation: A contractor has a son who was born in the
Philippines but as raised and educated in New York. His son,
John, is a licensed architect in New York. Upon his father’s
prodding, Arch. John returned to the Philippines to be with his
father. However, instead of joining his father’s firm, he decided
to set-up his own firm, The son’s firm submitted drawings to
the OBO for bldg. permit but the drawings were rejected. What
went wrong?
John’s firm is not registered with the DTI/SEC
Arch. John is not allowed to practice
Architecture in the Philippines
his office is not registered
no license to proctice
What can be done to remedy the problem?
Hire a local Architect to sign and seal for him
Determine if a reciprocity agreement exist
between the Philippines and New York
Pass the local Licensure Examination for
Architects
no comments
Situation: A lot has a depth of 30m and a frontage of 15m
facing northeast. It has a 20m RROW with 1.5m sidewalk at
both sides. The left side of the lot is a school building while at
the right is an office mid-rise building. Located in the middle
part of the intended façade of your project is a post. The site is
still vacant and there is no water connection yet, Where do
you apply for a temporary/permanent water connection?
Brgy. Chairman
MWSS
DPWH
OBO
Who do you approach to have the “post” removed?
Meralco
DPWH
OBO
Napocor
Where did you go to apply for a building permit
OBO
MWSS
city hall
DPWH
What is the AMBF percentage of the site?
60%
50%
75%
90%
Plans and designs of all public buildings must fully comply with all of the planning and design requirements under the Code and this IRR including the Fire Code of the Philippines
______ and the Accessibility Law ______.
PD 1096 & PD 1154
PD 1185 & BP 344
BP 344 & PD 1185
The center portion of all basement levels shall be reserved for the satisfaction of the basement level may extend by a minimum clear distance of ___ in meters from the outermost face of the building (OFB) at grade level.
1.24
1.40
2.4
3.4
____ shall face a street or public alley or a private street which has been duly approved.
All Structure
All Buildings
Residential Buildings
Commercial Buildings
Maximum Run Of ___ CUL DE SAC in Meters
30
40
50
60
With absolutely no firewalls/abutments allowed for R-1 use. what page/pages you can find under Rule 7?
150
160
159
169
What is the Multiplier to convert the GFA to TGFA, when the type of the structure / building base on Use/ Occupancy falls Under (Agricultural and Agro-Industrial)
1.03 - 1.06
1.05 - 1.06
1.50
1.33
For the Corner Lot Abutting 3 or more streets, How many Percentage of the Open Space Allowed
5% for all group Occupancy
50% for all group Occupancy
6% for all group Occupancy
10% for all group Occupancy
Identify the Image
Tansi
Tansan
String
Pitik
Identify the Image
Mechanical Gauge Instrument
Veneer Calipher
Spirit Level
Ruler
Identify the Image
Finishing saw
Hack Saw
Coping Saw
Needle Saw
Identify The Image
Carpenter tile
Paet/wood Chisel
Silsil /Cold chisel
Makeshift Chisel
Identify the Image
Diamond Roller
Carboranuim Stone
Knfe Sharfener
Kikil
Identify the Image
Sand Paper
Vynil tiles
Clay Tiles
Sushi Wrapper
Identify the Image
Door Knob Saw
Hole Saw
Power tool Saw
Circular Saw
Identify the Image
Dump Truck
Agitator Truck
Sand Steer loader
Hydraulid Elf Truck
Identify the Image
Truck loader
Bulldozzer
Sand Steer Loader
Ripper
Identify the Image
Lift to Lift
Heavy Equipment Lift
Gantry
Crane Lift
Any wastewater containing animal or vegetable matter in suspension or solution and may include liquids containing chemical in solutions
Sewage
Sewer
Sewer Pipe
Soil Pipe
The extended portion of a pipe that is closed one end to which no connections are made on the extended portion, thus permitting stagnation of wastewater or air therein
Cap
Clean Out
Dead end
Plug
device installed in piping to prevent the reverse flow of storm or sewage into the drainage system or their branches
Check Valve
Backflow
Back water valve
Catch Basin
The quantity that tends to accelerate or change the movement of a body
Loads
Friction
Force
Density
Allow concrete to dry slowly by keeping it moist (hydration) to attain maximum strength.
Accelerator
Curing
Admixture
Plasticizer
TOSL
TLA x ISA
TLA / AMBF
ISA + USA
PSO x ISA + USA
MACA MAX
AMBF + ISA
PSO +ISA
TLA x PSO
GFA + NGFA
TGFA MAX
GFA + NGFA
AMBF + ALL SET BACK
GFA + ALL FLOORS
AMBF x NO OF FLOORS
PSO GIVEN
TLA x BY THE BOOK
TLA x AMBF OF THE PROJECT
BF / TLA
AMBF / TLA
For ground interments, there shall be a minimum depth of excavation of ___ in meters from ground level to base of excavation. However, if concrete vaults are used, the minimum depth of excavation from base of vault to ground level shall be 1.00 meter, depending on the depth of ground water table.
1.0
1.5
2.0
2.5