1.

Refers to the range of professional services that cover Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post-Construction Services.

a)

Allied Services

b)

Design-Build Services

c)

Comprehensive Architectural Services

d)

Construction Management Services

2.

Who is the Prime Professional in CAS?

a)

Architect

b)

Engineer

c)

Client

d)

Project Manager

3.

Duly notarized written contract or equivalent public instrument stipulating the scope of services and guaranteeing compensation of such services?

a)

Service Agreement

b)

General Conditions

c)

Surety

d)

Project Manua;

4.

What part of Architect’s services is architectural programming?

a)

Schematic Design

b)

Pre-Design

c)

Regular Design

d)

Contract Documents

5.

A method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor

a)

Construction Management Services

b)

Full-time Supervision Services

c)

Design-Build Services

d)

Post-Construction Services

6.

One of the methods of compensation for architectural service is based on technical hours and expenses & made by adding all costs of technical services (man-hours time rate). A multiplier is used to take care of overhead & profit. This method, however, is applicable only to non-creative work & aspects of pre-design services & supervision work. What is this method called?

a)

Per diem plus reimbursable expenses

b)

Mixed methods of compensation

c)

Multiple of direct personal expenses

d)

Professional Fee

7.

Under what phase of design services does the architect prepare complete construction drawings and specifications on materials/construction methods?

a)

Schematic Design

b)

Contract Documents

c)

Design Development

d)

Bidding Phase

8.

This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement?

a)

Contract Sum Breakdown

b)

Contract time

c)

Schedule of Completion

d)

Notice to Proceed

9.

What pre-design service involves investigating, identifying and documenting the needs of the client for use in the design of the project?

a)

Economic Feasibility Studies

b)

Space Management Studies

c)

Architectural Programming

d)

Site Selection and Analysis

10.

Which of the following is a responsibility of the Architect in the Construction Phase of the Regular Design Services?

a)

Makes periodic visits to the site

b)

Makes exhaustive on-site supervision

c)

Be held responsible for failure of contractor to carry out work

d)

Prepares shop drawings

11.

Most expensive and time-consuming method of selecting the Architect?

a)

Comparative selection

b)

Design competition

c)

Mixed method

d)

Direct selection

12.

A method of selection for an Architect most often used by an individual person undertaking a relatively small project?

a)

Comparative Selection

b)

Direct Selection

c)

Design Competition

d)

Bidding

13.

SPP DOC 201

a)

Regular Design Services

b)

Pre-Design Services

c)

Design-Build Services

d)

Full-time Supervision Services

14.

SPP DOC 205

a)

CONSTRUCTION MANAGEMENT SERVICES

b)

POST-CONSTRUCTION SERVICES

c)

COMPREHENSIVE ARCHITECTURAL SERVICES

d)

DESIGN-BUILD SERVICES

15.

SPP DOC 208

a)

COMPREHENSIVE ARCHITECTURAL SERVICES

b)

DESIGN-BUILD SERVICES

c)

ARCHITECTURAL DESIGN COMPETITION

d)

PROFESSIONAL ARCHITECTURAL CONSULTING SERVICES

16.

_______ involves management activities over and above the normal architectural and engineering (A&E) services carried out during the pre-design, design and construction phase.

a)

Project Management

b)

Construction Management

c)

Building Management

d)

Comprehensive Architectural Services

17.

The following are scope of services for Regular Design Services

EXCEPT:

a)

Project Development Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Documents Phase

18.

The following are scope of services for Pre-Design Services

EXCEPT:

a)

Site Selection and Analysis

b)

Space Management Studies

c)

Architectural Planning

d)

Value Management

19.

If the Project Manager (PM) also serves as the Construction Manager (CM) to oversee _________ during the construction of the project, he shall provide the services detailed under SPP Documents 204-A and/or 204-B.

a)

time, cost and quality control

b)

plan, program and monitor various activities

c)

quality and performance

d)

elements of time, quality and performance

20.

If a Project Manager (PM) is hired by the Owner, it may be the responsibility of the PM to either hire the ________ to be paid either by him or directly by the Owner on salary.

a)

Construction Manager

b)

Contractor

c)

Construction Supervision Group

d)

Consultant

21.

If the Architect as _____ performs regular design services for the same project, he shall be compensated separately for these services as stipulated in SPP Document 202.

a)

Project Manager

b)

Construction Manager

c)

Specialist Consultant

d)

Prime Professional

22.

The following area scope of services for Specialized Architectural Services

EXCEPT:

a)

Building Appraisal

b)

Facilities Maintenance Support

c)

Building Environmental Certification

d)

Comprehensive Architectural Planning

23.

Systematic process of ensuring that a building / structure’s array of systems is planned, designed, installed and tested to perform according to the design intent and the building’s operational needs.

a)

Building Testing and Commission

b)

Building Testing and Commisioning

c)

Building Test and Commissioning

d)

Building Testing and Commissioning

24.

Minimum number of juries for Architectural Design Competition.

a)

10 members

b)

5 members

c)

20 members

d)

15 members

25.

How many sets of construction drawings and technical specifications are required for the architect to submit to the owner for the purpose of obtaining a building permit?

a)

7 sets

b)

4 sets

c)

5 sets

d)

8 sets

26.

Two Classifications of Architectural Design Competition.

a)

Bidding and Negotiation

b)

Open Competition and Civic worthy bidding

c)

Community negotiation and Conducting ADCs

d)

Project ADCs, Ideas Competition

27.

This method of compensation is frequently used where there is continuing relationship

involving a series of projects

a)

Professional Fee Plus Expenses

b)

Lump Sum or Fixed Fee

c)

Multiple of Direct Personnel Expenses

d)

Other Method of Compensation

28.

Needed to evaluate the environmental performance of a building and to encourage market migration towards sustainable design. What kind of Specialized Architectural Service?

a)

Facilities Maintenance Support

b)

Building Environment Certification

c)

Security Evaluation and Planning

d)

Structural Conceptualization

29.

The body formed by the owner and approved by the Professional Advisor to assist the professional advisor and the jury in the administrative conduct of the ADC.


a)

Competition Secretariat

b)

Consulting Architect

c)

Architect

d)

Architect

30.

Exhibition and entries shall be open to public free of charge for atleast ___________weeks.

a)

1

b)

2

c)

3

d)

4

31.

Can an Architect be the Architect-of-Record and Architect-in-Charge of construction at the same time?

a)

YES

b)

NO

c)

MAYBE

32.

The _________ will issue a Certificate of Registration bearing registration number- which signifies that the bearer have passed the Architecture Licensure Exam, and formally registered to practice their profession as an architect.

a)

UAP

b)

PRC

c)

SEC

d)

IAPOA

33.

What stage of the architect services are site utilization and feasibility studies?

a)

REGULAR DESIGN SERVICES

b)

PRE-DESIGN SERVICES

c)

SPECIALIZED

d)

POST CONSTRUCTION

34.

The architect who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications, and contract documents he/she has signed and sealed.

a)

ARCHITECT OF RECORD

b)

ARCHITECT IN CHARGE OF CONSTRUCTION

c)

CONSULTING ARCHITECT

d)

CIVIL ENGINEER

35.

Per SPP 202, "A per diem plus travelling and living expenses shall be chargeable to the Owner whenever the Architect is required at a locality beyond ________ (radial distance) from his established office."

a)

10km

b)

50km

c)

100km

d)

150km

36.

The art and science of systematizing the use of land, space and resources through development control, enhancement, conservation and rehabilitation to yield man the greatest satisfaction

a)

Environment

b)

Environmental Planning

c)

Physical Planning

d)

Site Planning

37.

Based on SPP 202, publishing plants are classified under which group?

a)

GROUP 1

b)

GROUP 2

c)

GROUP 3

d)

GROUP 5

38.

Is a required document under Sec. 41 of R.A. No. 9266 (The Architecture Act of 2004)

and its Implementing Rules and Regulations (IRR)?

a)

Professional Practice

b)

Standard of Professional Practice

c)

Code of Ethical Conduct

d)

Board

39.

The Architecture Act of 2004

a)

RA 926

b)

RA 9926

c)

RA 9266

d)

RA 9626

40.

The PRC Modernization Act of 2000

a)

RA 9266

b)


RA 8981

c)

RA 9626

d)

RA 8941

41.

FPCA stands for?

a)

Filipino Professional Consulting Architects

b)

Filipino Profession Consulting Architects

c)

Filipino Practicing Consulting Architects

d)

Filipino Professional Consulting Architecture

42.

PRC stands for?

a)

Profession Regulated Commission

b)

Professional Regulation Commission

c)

Professional Rules Commission

d)

Professional Regulation Committed

43.

TSP stands for?

a)


Temporary/ Structural Permit

b)


Typical/ Special Permit

c)


Temporary/ Special Permition

d)

Temporary/ Special Permit

44.

IAPOA stands for?

a)

Integration and Accredited Profession Organization of Architects

b)

Integrated and Accredited Professional Organization of Architects

c)

Integrated and Accreditation Professional Organization of Architecture

d)

Integrate and Accredit Profession Organization of Architects

45.

As a result of the pandemic, a developer's office building has lost nearly 50% of its tenants. The management hired an architect to come up with schemes to appeal to a different tenant demographic and increase building occupancy. What service is the architect rendering?

a)

A specialized allied service

b)

A specialized architectural service

c)

A post-construction service

d)

Both C and D

46.

SPP Document 203 contains the standards for:

a)

Specialized allied services

b)

Regular design services

c)

Post-design services

d)

Specialized architectural services

47.

The construction management service is covered by which SPP Document?

a)

SPP 202

b)

SPP 204a

c)

SPP 204b

d)

Both B and C

48.

Who normally recommends the construction supervision group (CSG)?

a)

Architect

b)

Contractor

c)

Owner

d)

Project Manager

49.

Which of the following is not part of the scope of services for construction management?

a)

Quality control

b)

Evaluation of construction work

c)

Building and Facilities administration

d)

Filing of Documents

50.

Construction in a building involving changes in the materials used, partitioning, locations/sizes of openings, structural parts, existing utilities and equipment without increasing the overall area.

a)

Alteration

b)

Renovation

c)

Slum Upgrading

d)

Redecoration