Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Six Sigma

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

Which stage of the DMAIC process is most associated with solutions generation?

a)

Analyze

b)

Measure

c)

Control

d)

Improve

e)

Define

2.

What is NOT the purpose of implementing Six Sigma?

a)

To satisfy customer

b)

To reduce waste

c)

To increase variation

d)

To reduce defects

3.

Six Sigma processes produce less than _________ Defects per Million Opportunities (DPMO).

a)

3.4

b)

0.34

c)


34

d)

34,000

4.

A problem solving approach that unifies six sigma projects is:

a)

SIPCom

b)

DMAIC

c)

SIPOC

d)


DoE

5.

  • __________________can be measured against a benchmark in a process.

a)


Performance

b)

Outcome of the process (Y)

c)


Operational Efficiency

d)


All of the above

6.

The Graph which helps to identify and prioritize problems to be solved

a)

Control Chart

b)

Histogram Chart

c)

Fish Bone Graph

d)


Pareto Chart

7.

  • The Control Chart would help us to determine whether the process is

a)

Stable

b)

Capable

c)


Correlation

d)

Prediction

8.

A process has its CPk value less than 1. The process is __________ .

a)

Stable

b)


Capable

c)

Not Capable

d)

None of the above

9.

Six Sigma is a term used to indicate that there are 6 Standard Deviations below and above the process Mean and within upper and lower specification limits.

a)


True

b)

False

10.

The reason that most companies implement lean six sigma?

a)

Reduce variation

b)

Reduce waste

c)

Improve profit

d)


Increase customer satisfaction

e)

All Above

11.

Six sigma called data driven processes improvement, because?

a)


Are heavily based on intuition and perception

b)


Rely heavily on the experience of the process owners

c)

Are based on statistical data, measurement and metrics

d)

Rely on experience

12.

Quality control of stationary production check the product based on category: diameter, length, colour, packaging. How many defect opportunity in this case during DPMO calculation?

a)

1

b)

2

c)

3

d)

4

13.

Six Sigma means 6 standard deviation between mean and nearest spec limit.

a)

True

b)

False

14.

Which of the following Belt Levels usually require a Six Sigma Project be completed before a Six Sigma Certification is awarded?

a)

Yellow Belt

b)

White Belt

c)


Green Belt

d)

None of the Above

15.

The DMAIC approach to problem solving stands for Define, __________, Analyse, Improve and Control.

a)


Manage

b)


Measurement

c)


Measure

d)

Monitoring

16.

It does not make the product any better or more appealing

to customers and does not willing to pay more:

a)


Value Added

b)


Non Value Added

c)

Process

d)

Defect

17.

After six sigma project, the defect significantly reduced, then the company measure its sigma level?

a)


Sigma level decrease

b)

Sigma level increase

c)

Did not impact sigma level

d)


None of Above

18.

Finding the root cause of problem in six sigma project, include in stage?

a)

Define

b)

Measure

c)

Analyse

d)

Improve

19.

Waste is any effort or activity does not add value to customer

and the customer doesn't willing to pay for.

a)

True

b)

False

20.

Project Charter is a document that provides

a)

a framework & opinion for an improvement project

b)

a framework and objective for an improvement project.

c)

the constitution & values of the organization

d)

a policy for all employees to follow

21.

Which is NOT a characteristic of a well-selected project?

a)

The project is supportive of key business objectives

b)

Project is measurable

c)

The project is linked to customer CTS

d)

The project is controlled outside the company

e)

None of the above.

22.

CTS comprises of:

a)

CTD

b)

CTQ

c)

CTC

d)

All of the above.

e)

None of the above

23.

In the expression below, which is the dependent variable?

Y=f (x)

a)

Y

b)

X

c)

F

d)

All of the above

e)

None of the above.

24.

The purpose of defining Problem Statement:

a)

To quantify the problem.

b)

To define the scope of the problem

c)

To understand the impact of the problem on the customer.

d)

All of the above.

e)

None of the above.

25.

In terms of sigma value, what is the ideal process capability?

a)

2 sigma

b)

3 sigma

c)

4 sigma

d)

5 sigma

e)

6 sigma