1.

Which of the following is not a function of a groin?

a)

Decreases the flow velocity

b)

Regulates the flow direction

c)

Decreases the scouring effect

d)

Increases the flow velocity

2.

What do you call the depth of water above the culvert inlet bottom?

a)

Headwater

b)

Inflow

c)

Outflow

d)

Scoured

3.

What do you call the depth refers to the to tal depth of water from surface to a purge bed level?

a)

Headwater

b)

Inflow

c)

Outflow

d)

Scoured

4.

What is the formula used in computing price escalation?

a)

Algebraic

b)

Volumetric

c)

Parametric

d)

Economic

5.

What is the range of Spur Dike's top width?

a)

1-2m

b)

2-3m

c)

3-4m

d)

1-3m

6.

For concave sections, what is the distance between spur dikes times the length of spur (LS)?

a)

1.4 to 1.8 x LS

b)

1.7 to 2.3 x LS

c)

2.8 to 3.6 x LS

d)

All of the above

7.

For convex sections, what is the

distance between spur dikes times the

length of spur (LS)?

a)

1.4 to 1.8 x LS

b)

1.7 to 2.3 x LS

c)

2.8 to 3.6 x LS

d)

All of the above

8.

What term is used to indicate the maximum length of a designated upgrade on which a loaded truck can operate without an unreasonable reduction in speed?

a)

Critical Length of Grade

b)

Normal Length of Grade

c)

Reduction of Grade

d)

Truck Length of Grade

9.

What is the minimum Radius of Curve for a design speed of 30kph?

a)

20m

b)

15m

c)

30m

d)

25m

10.

What is the minimum bandwidth of the reflective tapes for traffic cones?

a)

200 mm

b)

150 mm

c)

300 mm

d)

250 mm

11.

What is the standard maximum height for traffic bollards?

a)

2.0m

b)

1.0m

c)

1.5m

d)

2.5m

12.

What is the minimum bandwidth of the reflective tapes for traffic bollards?

a)

200 mm

b)

150 mm

c)

300 mm

d)

250 mm

13.

Concrete Barriers need to be continuous or secured together, generally using steel pins and eyelets, with a maximum _____ gap to ensure they perform satisfactorily.

a)

200 mm

b)

100 mm

c)

150 mm

d)

250 mm

14.

What is minimum dimension of square flags for STOP and GO?

a)

600 mm

b)

400 mm

c)

500 mm

d)

750 mm

15.

What is the standard distance range of Road Warning Signs in advance of the construction site for urban areas?

a)

30m-100m

b)

25-50 m

c)

75-225 m

d)

100 - 200 m

16.

What is the standard distance range of Road Warning Signs in advance of the construction site for rural areas?

a)

30m-100m

b)

25-50m

c)

75-225m

d)

100-200m

17.

Barrier boards shall NOT be used for delineation purposes or installed parallel to vehicular traffic unless there is an offset of at least from the travelled path.

a)

1 m

b)

2 m

c)

3 m

d)

4 m

18.

Traffic cones shall be spaced __ apart on tapers and around small work sites.

a)

5-10 m

b)

4-8 m

c)

6-10 m

d)

5-8 m

19.

What kind of reports are used to document events that occur at a plant or operation, such as concrete batch plant or bituminous plant?

a)

A. Contract performance reports

b)

B. General project status reports

c)

C. Field correction reports

d)

Plant inspector's reports

20.

These are monthly or quarterly statements of time and cost for the project. The report documents all changes that have accrued since the beginning of the project regarding time and cost.

a)

A. Contract performance reports

b)

B. General project status reports

c)

C. Field correction reports

d)

D. Plant inspector's reports

21.

What kind of report are used to summarize the work progress for the immediate preceding month or quarter Usually contains a narrative section describing status of project, S-Curve diagram, summary of contract time and change orders?

a)

A. Contract performance reports

b)

B. General project status reports

c)

C. Field correction reports

d)

D. Plant inspector's reports

22.

What kind of report are used to document any corrective changes which occur in the field that would require departure from the plans and specifications and then provide the necessary information to understand the problem, decide of how to resolve it and issue instructions to the field and serve as a source of document for variation order approvals?

a)

A. Contract performance reports

b)

B. General project status reports

c)

C. Field correction reports

d)

D. Plant inspector's reports

23.

After the issuance of the "Punch List" during the pre-final inspection, _ months-time durations imposed to complete the project without penalties.

a)

1

b)

2

c)

3

d)

4

24.

What should be conducted after the final inspection of a reported 100% accomplished project, before a certificate of final inspection is to be issued?

a)

Post Construction Meeting

b)

Final Construction Meeting

c)

Exit Conference

d)

Final Conference

25.

If, after fifty percent (50%) completion, the Works are satisfactorily done and on schedule, the amount of retention money will be limited to ____ of the contract amount.

a)

10%

b)

7%

c)

6%

d)

0%

26.

This represents the payment of the remaining balance of the contract including the total retention after the completion of the project.

a)

Final Billing

b)

Interim Billing

c)

Retention Billing

d)

Pre-Final Billing

27.

The contractor will be allowed to file for the release of first partial billing if he had satisfactorily completed at least_ of the contract.

a)

10%

b)

20%

c)

25%

d)

30%

28.

When the spread footing located on a slope, the minimum distance from the lower edge of the footing to the sloping ground surface should be ______.

a)

500 mm

b)

750 mm

c)

900 mm

d)

1000 mm

29.

What is the maximum spacing center to center of adjacent rings of circumferential reinforcement in a cage of a standard two-meter RCPC?

a)

100 mm

b)

50mm

c)

75mm

d)

90mm

30.

For school building, footing shall rest at least _ below natural grade line.

a)

1.5m

b)

1.0m

c)

2.5m

d)

2.0m

31.

For buildings, the minimum concrete protection for reinforcement shall be clear for concrete deposited the ground.

a)

100mm

b)

75mm

c)

50mm

d)

90mm

32.

For buildings, the minimum concrete protection for reinforcement shall be clear for concrete deposited against a formwork.

a)

100mm

b)

75mm

c)

50mm

d)

90mm

33.

What is the minimum days of stripping of Forms and Shores for suspended slabs in school building?

a)

1 day

b)

8 days

c)

14 days

d)

21 days

34.

What is the minimum days of stripping of Forms and Shores for walls and columns in school building?

a)

1 day

b)

8 days

c)

14 days

d)

21 days

35.

What is the minimum days of stripping of Forms and Shores for beams in school building?

a)

1 day

b)

8 days

c)

14 days

d)

21 days

36.

This is the Guidelines on the Accreditation of the Contractors' and Consultants' Project Engineers.

a)

D.O No. 10 Series of 2019

b)

D.O No. 15 Series of 2019

c)

D.O No. 30 Series of 2019

d)

D.O No. 20 Series of 2019

37.

What is the minimum girder required for a one-lane bridge?(August 2019)

a)

6

b)

4

c)

3

d)

5

38.

What is the minimum girder required for a more than 2-lane bridge? (August 2019)

a)

6

b)

4

c)

3

d)

5

39.

Construction joints in floors shall be located within the _ of spans of slabs, beams, and girders. Joints in girders shall be offset a minimum distance of two times the width of intersecting beam. (August 2019)

a)

L/3

b)

L/4

c)

Middle Third

d)

L/2

40.

All embedded pipes for utilities etc. that pass thru beams shall not exceed 100mm in diameter or _____ beam depth whichever is less, and no pipes shall be allowed to pass thru beams vertically.

a)

1/3

b)

3/4

c)

1/4

d)

1/2

41.

The ACI code gave a provision on structural integrity to perimeter beams is to splice continuous top bars at _ and splice continuous bottom bars at or near supports

a)

Middle Third

b)

Midspan

c)

Top Slab

d)

L/4 from Support

42.

All doors for people with Disability (PWD) shall have a minimum clear width of meter. (August 2019)

a)

0.8m

b)

0.9m

c)

1.0m

d)

1.20m

43.

All Sidewalks / walkways for people with Disability (PWD) shall have a minimum clear width of ___ meter.

a)

0.8m

b)

0.9m

c)

1.0m

d)

1.20m

44.

As per IRR BP 344, Handrails attached to walls should have a clearance no less than ____ from the wall.

a)

80mm

b)

90mm

c)

50mm

d)

75mm

45.

All Sidewalks / walkways for people with Disability (PWD) shall have a maximum gradient of __ ?

a)

4%

b)

6%

c)

5%

d)

3%

46.

No vertical curve is required when algebraic difference between grades is less than _____.

a)

0.4%

b)

0.5%

c)

0.6%

d)

0.3%

47.

What do you call the discharge used to size the capacity of the bridge?

a)

Design Flood

b)

Flood Level

c)

MEFL

d)

OWL

48.

What is the maximum spacing of bridge drains?

a)

3.0m

b)

6.0m

c)

4.0m

d)

5.0m

49.

What is the minimum diameter of Bridge drains?

a)

150mm

b)

100mm

c)

75mm

d)

200mm

50.

What is the maximum design span range for box girders on PSCG?

a)

15m

b)

20m

c)

25m

d)

30m