What is the minimum design thickness for asphalt overlay projects?

a)

25mm

b)

50mm

c)

75mm

d)

100mm

2.

What is the minimum STE individual years of experience for Class A Category AA Contractor?

a)

5

b)

10

c)

15

d)

12

3.

What is the maximum allowable single project cost for Small B Category C Contractor?

a)

15 Million

b)

25 Million

c)

10 Million

d)

20 Million

4.

What is the maximum allowable Contract Cost for Medium A Category B Contractors?

a)

150 M

b)

100 M

c)

250 M

d)

200M

5.

5. What is the minimum width of turnouts, loading and unloading bay, to accommodate all types of vehicle?

a)

3.2m

b)

3.6m

c)

3.5m

d)

3.75m

6.

What is the standard color for all DPWH steel bridges? International_

a)

Blue

b)

Black

c)

Gray

d)

Orange

7.

National Route Numbering (NRS)

should remain over the medium term and

reviews shall be undertaken on a periodic __ cycle.

a)

5 years

b)

7 years

c)

6 years

d)

8 years

8.

8. What is the minimum width of Zebra (Longitudinal Bars) for Pedestrian crossing markings?

a)

3 m

b)

4 m

c)

3.5 m

d)

5 m

9.

9. Pedestrian crossing markings at road intersections without channelized islands shall be placed outside the intersection area at least __ set back from the edge of road.

a)

2m

b)

3m

c)

2.5m

d)

4m

10.

Who is the approving official if the Work Suspension Order (WSO) is beyond 120 Calendar Days?

a)

DE

b)

RD

c)

ASEC for Operations

d)

USEC

11.

What is the standard dimension for Project Billboard?

a)

l .22mx.2.44m

b)

2.12mx2.14m

c)

1.5mx2.5m

d)

1.3mx2.44m

12.

12. For road projects with length of 10 kilometers or more, additional billboard shall also be installed at every __ interval.

a)

3. 0kM

b)

5. 0kM

c)

4.5kM

d)

7.5 kM

13.

13. No other billboards shall be allowed to be installed ____ before and after all DPWH projects and in-between the project limits or within the road right-of­way.

a)

100m

b)

30m

c)

50m

d)

150m

14.

It is acceptable for "As-Built Plans" as a reason for Final variation order if the cumulative increase in value of work does not exceed ___ of the adjusted original contract price.

a)

10%

b)

5.0%

c)

12.0%

d)

15%

15.

15. What is the maximum amount for Regional Directors to procure, implement, and approved plans, POW, and ABC?

a)

200M

b)

300M

c)

150M

d)

100M

16.

What is the maximum amount for District Engineers to procure, implement, and approved plans, POW, and ABC?

a)

300 million

b)

200 million

c)

150 million

d)

100 million

17.

What is the maximum amount for "ALL" District Engineer to approved Program of Work, ABC and plans like as-built and as-staked?

a)

50M

b)

100M

c)

200M

d)

300M

18.

What is the minimum pavement thickness for Farm to Market Roads?

a)

200mm

b)

230 mm

c)

250 mm

d)

280 mm

19.

What is the minimum Radius of Horizontal Curve for Farm to Market Roads?

a)

20m

b)

30m

c)

50m

d)

40m

20.

19. What is the minimum Radius of Horizontal Curve for Tourism Roads?

a)

20m

b)

30m

c)

50m

d)

40m

21.

The RROW boundary marker posts shall be installed along the RROW limit line on each side of the road at _____ kilometer interval.

a)

1 km

b)

3 km

c)

4 km

d)

5 km

22.

On highly urbanized area, RROW marker shall be concrete block embedded on the surface along the edge of concrete sidewalk on each side of the road at interval.

a)

100 m

b)

500 m

c)

200 m

d)

250 m

23.

All permanent bridges along national roads shall be provided with the Informative signs to be posted on conspicuous place within ___ before the abutment at both approaches.

a)

1 m

b)

4 m

c)

5 m

d)

3 m

24.

What is the negative slippage for "ICU Stage"?

a)

5%

b)

10%

c)

15%

d)

20%

25.

What is the negative slippage for "Terminal Stage"?

a)

5%

b)

10%

c)

15%

d)

20%

26.

What is the maximum distance outside the shoulder for Kilometer Post from the edge of the road pavement?

a)

1.5m

b)

1.0m

c)

2.5m

d)

2.0 m

27.

If the shoulder is less than 2.0m, what is the setback distance of the Kilometer Post from the edge of the shoulder?

a)

0.75m

b)

1.0m

c)

0.50m

d)

0.25m

28.

What is the spacing of dowel bars for 280 mm thick PCCP?

a)

300mm

b)

250mm

c)

274mm

d)

295mm.

29.

What is the spacing of dowel bars for 300 mm thick PCCP?

a)

300mm

b)

250mm

c)

274mm

d)

295mm.

30.

Vertical Clearance for Bridges over Navigable Waterways is the sum of Highest Water Level (HWL) and Height of Vessel (HV) and the K Factor. What is the constant value of the K-factor?

a)

1.5m

b)

1.0m

c)

2.5m

d)

2.0m

31.

Contractor shall shoulder all the expenses for the alteration and/or reconstruction of the structure and a fine of ____ of the original total contract price, if they violated the minimum Vertical Clearance for Bridges over Navigable Waterways.

a)

1.5 %

b)

1.0 %

c)

2.5 %

d)

2.0 %

32.

What is the setback distance from the RROW Limit for Welcome Arches and Overhead Boundary Markers?

a)

1.5 m

b)

1.0 m

c)

2.5 m

d)

2.0 m

33.

What is the minimum vertical clearance of the welcome Arch/Overhead Boundary Marker from the roadway surface?

a)

5.03 m

b)

4.88 m

c)

5.33 m

d)

5.50 m

34.

What is the minimum vertical clearance of the Overhead Utilities and Power Lines from the roadway surface to the calculated lowest point of cable sag?

a)

5.03 m

b)

4.88 m

c)

5.33 m

d)

5.50 m

35.

What is the minimum vertical clearance of the Overhead Utilities and Power Lines from the roadway surface to the calculated lowest point of cable sag?

a)

5.03 m

b)

4.88 m

c)

5.33 m

d)

5.50 m

36.

What is the minimum sidewalk width as per Accessibility Law BP 344 along national highways?

a)

1.0 m

b)

1.20 m

c)

1.25 m

d)

1.50 m

37.

What is the minimum and maximum height of signages on walls and doors as per Accessibility Law BP 344?

a)

1.25m -1.50m

b)

1.30m-1.50m

c)

1.40m-1.50m

d)

1.40m-1.60m

38.

38. During re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-Iane and Not More than __ in Length at any time in Non-Urban Areas.

a)

150m

b)

50m

c)

75m

d)

100m

39.

39. During re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-Iane and Not More than __ in Length at any time in Urban Areas.

a)

150m

b)

50m

c)

75m

d)

100m

40.

The cut-off date of physical accomplishments to be reflected in Progress Billings shall be reckoned on the ____ day of each month instead of the 25th day of the month.

a)

10th

b)

15th

c)

30th

d)

7th

41.

Monthly Accomplishment for any DPWH project shall constitute the works completed and accepted from the_ day of the preceding month up to the_ day of the current month.

a)

11th and 10th

b)

15th and 25th

c)

30th and 25th

d)

7th and 10th

42.

What is the minimum PCCP width on National Roads?

a)

6.10 m

b)

6.70 m

c)

5.0 m

d)

7.32 m

43.

43. What is the minimum width PCCP of Tourism Roads?

a)

6.10 m

b)

6.70 m

c)

5.0 m

d)

7.32 m

44.

What is the minimum PCCP slab thickness on National Roads?

a)

230 mm

b)

280 mm

c)

300 mm

d)

200 mm

45.

For span lengths of 21-30 meters, what bridge type shall be use as per Department Order No. 30 Series of 2011?

a)

Flat Slab

b)

PSCG

c)

RCDG

d)

Steel Bridge

46.

46. For span lengths of 6-12 meters, what bridge type shall be use as per Department Order No. 30 Series of 2011?

a)

Flat Slab

b)

PSCG

c)

RCDG

d)

Steel Bridge

47.

47. Which of the following contractor category is not required for ISO 9000 Certification?

a)

Large B

b)

Medium B

c)

Large A

d)

None OTA

48.

What is the minimum individual years of construction experience for Sustaining Technical Employee (STE)?

a)

2 years

b)

5 years

c)

3 years

d)

10 years

49.

What is the minimum individual years of construction experience for Sustaining Technical Employee (STE) for all Classes and Categories of a Contractor?

a)

2 yrs

b)

5 yrs

c)

3 yrs

d)

10 yrs

50.

50. What is the minimum Financial Capacity, Net Worth / Equity of a Class A Category A Contractor in Pesos?

a)

20M

b)

30M

c)

25M

d)

50M