What is the minimum design thickness for asphalt overlay projects?
25mm
50mm
75mm
100mm
What is the minimum STE individual years of experience for Class A Category AA Contractor?
5
10
15
12
What is the maximum allowable single project cost for Small B Category C Contractor?
15 Million
25 Million
10 Million
20 Million
What is the maximum allowable Contract Cost for Medium A Category B Contractors?
150 M
100 M
250 M
200M
5. What is the minimum width of turnouts, loading and unloading bay, to accommodate all types of vehicle?
3.2m
3.6m
3.5m
3.75m
What is the standard color for all DPWH steel bridges? International_
Blue
Black
Gray
Orange
National Route Numbering (NRS)
should remain over the medium term and
reviews shall be undertaken on a periodic __ cycle.
5 years
7 years
6 years
8 years
8. What is the minimum width of Zebra (Longitudinal Bars) for Pedestrian crossing markings?
3 m
4 m
3.5 m
5 m
9. Pedestrian crossing markings at road intersections without channelized islands shall be placed outside the intersection area at least __ set back from the edge of road.
2m
3m
2.5m
4m
Who is the approving official if the Work Suspension Order (WSO) is beyond 120 Calendar Days?
DE
RD
ASEC for Operations
USEC
What is the standard dimension for Project Billboard?
l .22mx.2.44m
2.12mx2.14m
1.5mx2.5m
1.3mx2.44m
12. For road projects with length of 10 kilometers or more, additional billboard shall also be installed at every __ interval.
3. 0kM
5. 0kM
4.5kM
7.5 kM
13. No other billboards shall be allowed to be installed ____ before and after all DPWH projects and in-between the project limits or within the road right-ofway.
100m
30m
50m
150m
It is acceptable for "As-Built Plans" as a reason for Final variation order if the cumulative increase in value of work does not exceed ___ of the adjusted original contract price.
10%
5.0%
12.0%
15%
15. What is the maximum amount for Regional Directors to procure, implement, and approved plans, POW, and ABC?
200M
300M
150M
100M
What is the maximum amount for District Engineers to procure, implement, and approved plans, POW, and ABC?
300 million
200 million
150 million
100 million
What is the maximum amount for "ALL" District Engineer to approved Program of Work, ABC and plans like as-built and as-staked?
50M
100M
200M
300M
What is the minimum pavement thickness for Farm to Market Roads?
200mm
230 mm
250 mm
280 mm
What is the minimum Radius of Horizontal Curve for Farm to Market Roads?
20m
30m
50m
40m
19. What is the minimum Radius of Horizontal Curve for Tourism Roads?
20m
30m
50m
40m
The RROW boundary marker posts shall be installed along the RROW limit line on each side of the road at _____ kilometer interval.
1 km
3 km
4 km
5 km
On highly urbanized area, RROW marker shall be concrete block embedded on the surface along the edge of concrete sidewalk on each side of the road at interval.
100 m
500 m
200 m
250 m
All permanent bridges along national roads shall be provided with the Informative signs to be posted on conspicuous place within ___ before the abutment at both approaches.
1 m
4 m
5 m
3 m
What is the negative slippage for "ICU Stage"?
5%
10%
15%
20%
What is the negative slippage for "Terminal Stage"?
5%
10%
15%
20%
What is the maximum distance outside the shoulder for Kilometer Post from the edge of the road pavement?
1.5m
1.0m
2.5m
2.0 m
If the shoulder is less than 2.0m, what is the setback distance of the Kilometer Post from the edge of the shoulder?
0.75m
1.0m
0.50m
0.25m
What is the spacing of dowel bars for 280 mm thick PCCP?
300mm
250mm
274mm
295mm.
What is the spacing of dowel bars for 300 mm thick PCCP?
300mm
250mm
274mm
295mm.
Vertical Clearance for Bridges over Navigable Waterways is the sum of Highest Water Level (HWL) and Height of Vessel (HV) and the K Factor. What is the constant value of the K-factor?
1.5m
1.0m
2.5m
2.0m
Contractor shall shoulder all the expenses for the alteration and/or reconstruction of the structure and a fine of ____ of the original total contract price, if they violated the minimum Vertical Clearance for Bridges over Navigable Waterways.
1.5 %
1.0 %
2.5 %
2.0 %
What is the setback distance from the RROW Limit for Welcome Arches and Overhead Boundary Markers?
1.5 m
1.0 m
2.5 m
2.0 m
What is the minimum vertical clearance of the welcome Arch/Overhead Boundary Marker from the roadway surface?
5.03 m
4.88 m
5.33 m
5.50 m
What is the minimum vertical clearance of the Overhead Utilities and Power Lines from the roadway surface to the calculated lowest point of cable sag?
5.03 m
4.88 m
5.33 m
5.50 m
What is the minimum vertical clearance of the Overhead Utilities and Power Lines from the roadway surface to the calculated lowest point of cable sag?
5.03 m
4.88 m
5.33 m
5.50 m
What is the minimum sidewalk width as per Accessibility Law BP 344 along national highways?
1.0 m
1.20 m
1.25 m
1.50 m
What is the minimum and maximum height of signages on walls and doors as per Accessibility Law BP 344?
1.25m -1.50m
1.30m-1.50m
1.40m-1.50m
1.40m-1.60m
38. During re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-Iane and Not More than __ in Length at any time in Non-Urban Areas.
150m
50m
75m
100m
39. During re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-Iane and Not More than __ in Length at any time in Urban Areas.
150m
50m
75m
100m
The cut-off date of physical accomplishments to be reflected in Progress Billings shall be reckoned on the ____ day of each month instead of the 25th day of the month.
10th
15th
30th
7th
Monthly Accomplishment for any DPWH project shall constitute the works completed and accepted from the_ day of the preceding month up to the_ day of the current month.
11th and 10th
15th and 25th
30th and 25th
7th and 10th
What is the minimum PCCP width on National Roads?
6.10 m
6.70 m
5.0 m
7.32 m
43. What is the minimum width PCCP of Tourism Roads?
6.10 m
6.70 m
5.0 m
7.32 m
What is the minimum PCCP slab thickness on National Roads?
230 mm
280 mm
300 mm
200 mm
For span lengths of 21-30 meters, what bridge type shall be use as per Department Order No. 30 Series of 2011?
Flat Slab
PSCG
RCDG
Steel Bridge
46. For span lengths of 6-12 meters, what bridge type shall be use as per Department Order No. 30 Series of 2011?
Flat Slab
PSCG
RCDG
Steel Bridge
47. Which of the following contractor category is not required for ISO 9000 Certification?
Large B
Medium B
Large A
None OTA
What is the minimum individual years of construction experience for Sustaining Technical Employee (STE)?
2 years
5 years
3 years
10 years
What is the minimum individual years of construction experience for Sustaining Technical Employee (STE) for all Classes and Categories of a Contractor?
2 yrs
5 yrs
3 yrs
10 yrs
50. What is the minimum Financial Capacity, Net Worth / Equity of a Class A Category A Contractor in Pesos?
20M
30M
25M
50M