Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Civil Engineering Laws, Ethics, and Contracts Quiz

Total questions: 130

Worksheet time: 1hrs 19mins

Name
Class
Date
1.

What is the primary focus of the course on Civil Engineering Law, Ethics, and Contracts?

a)

To explore historical engineering practices

b)

To learn about construction techniques

c)

To understand laws on obligations and contracts

d)

To study environmental science

2.

Which of the following is NOT a fundamental principle of the Civil Engineering Code of Ethics?

a)

Knowledge and skill

b)

Honest and impartial

c)

Maximizing profits

d)

Supporting professional societies

3.

What does the term 'ethics' refer to in the context of civil engineering?

a)

A financial management strategy

b)

A set of construction guidelines

c)

A collection of moral ideals

d)

A collection of legal statutes

4.

Which canon emphasizes the safety, health, and welfare of the public?

a)

Canon 7

b)

Canon 5

c)

Canon 3

d)

Canon 1

5.

What is one of the obligations of a civil engineer towards their client?

a)

To ignore client requests

b)

To perform scope of services

c)

To charge any fee they desire

d)

To work without a contract

6.

Which of the following is a responsibility of the client in the client-civil engineer relationship?

a)

To provide unlimited time for project completion

b)

To pay the civil engineer as per agreement

c)

To dictate all engineering decisions

d)

To avoid communication with the civil engineer

7.

What is the purpose of the Civil Engineering Code of Ethics?

a)

To provide financial advice

b)

To establish guidelines for professional conduct

c)

To promote competition among engineers

d)

To outline construction methods

8.

Which of the following is NOT a specialization of a civil engineer?

a)

Transportation engineering

b)

Structural engineering

c)

Geotechnical engineering

d)

Software engineering

9.

What is the significance of understanding engineering ethics?

a)

It helps in increasing profits

b)

It ensures responsible professional action

c)

It is essential for legal compliance

d)

It is important for personal development

10.

Which law allows foreign engineers to practice civil engineering in the Philippines?

a)

RA 544

b)

RA 8981

c)

E-Procurement Law

d)

National Building Code

11.

What is one of the roles of a professional code of ethics?

a)

To limit client interactions

b)

To increase competition

c)

To guide professional behavior

d)

To reduce project costs

12.

Which of the following is a type of civil engineering service?

a)

Human resources management

b)

Financial auditing

c)

Feasibility studies

d)

Marketing strategies

13.

What is the importance of the Manual of Professional Practice for Civil Engineers?

a)

It provides guidelines for ethical behavior

b)

It outlines construction techniques

c)

It serves as a marketing tool

d)

It is a financial management guide

14.

What is a key element of professional responsibility for civil engineers?

a)

Limiting project scope

b)

Maximizing personal gain

c)

Ensuring public health and safety

d)

Avoiding client communication

15.

it is a collection of moral ideals which human actions and propositions may be regarded as either good or bad.

a)

Ethics

b)

Moral

c)

Values

d)

Canons

16.

a person's behavioral norms or views about what is and is not acceptable to do.

a)

Ethics

b)

Moral

c)

Values

d)

Canons

17.

underlying ideas, principles, and aspirations that shape an individual's or group's attitudes and behaviour.

a)

Ethics

b)

Moral

c)

Values

d)

Canons

18.

a rule or set of rules, principles, or guidelines generally established as valid and essential in a field of art and philosophy

a)

Ethics

b)

Moral

c)

Values

d)

Canons

19.

What are the Professional Rights?

a)

Right of professional conscience and moral autonomy

b)

Right of conscientious refusal

c)

Right to recognition and fair pay

d)

Right to Left

20.

What are the fundamental principles of Civil Engineering Code of Ethics

a)

Knowledge and skill

b)

Honest and impartial

c)

Increasing the competence and prestige

d)

Supporting professional and technical societies

21.

Professional Development

a)

Canon 1

b)

Canon 6

c)

Canon 5

d)

Canon 7

22.

Enhance Honor, Integrity and Dignity

a)

Canon 1

b)

Canon 6

c)

Canon 5

d)

Canon 7

23.

Civil Engineers shall not knowingly act in a manner which will be derogatory to the honor, integrity, or dignity of civil engineering profession

a)

Canon 1

b)

Canon 6

c)

Canon 5

d)

Canon 7

24.

Professional Reputation

a)

Canon 1

b)

Canon 6

c)

Canon 5

d)

Canon 7

25.

Civil Engineers shall not use equipment, supplies, laboratory or office facilities of their employers to carry on outside private practice without the consent of their employers.

a)

Canon 1

b)

Canon 6

c)

Canon 5

d)

Canon 7

26.

Safety, Health and Welfare

a)

Canon 1

b)

Canon 6

c)

Canon 5

d)

Canon 7

27.

Area of Competence

a)

Canon 2

b)

Canon 3

c)

Canon 4

d)

Canon 5

28.

Objective and Truthful Public Statements

a)

Canon 2

b)

Canon 3

c)

Canon 4

d)

Canon 5

29.

Professional Matters

a)

Canon 2

b)

Canon 3

c)

Canon 4

d)

Canon 5

30.

Civil Engineers shall advise their employers or clients when, as a result of their studies, they believe a project will not be successful

a)

Canon 2

b)

Canon 3

c)

Canon 4

d)

Canon 5

31.

The Practice of Civil Engineering.

  • -Studying, conceiving, designing, observing construction, and assisting in programming for operating and maintaining engineering works.

  • - Health, safety, well-being, and comfort of the public.



(a)  

32.

vClient shall cooperate with the CE and shall not interfere with or obstruct the proper performance of the services…

a)

True

b)

False

33.

Client shall arrange for the provision of services from other professionals…

a)

True

b)

False

34.

Client shall notify the CE in writing within 14 days of the changes of scope of his service

a)

True

b)

False

35.

Selection of a Civil Engineer

a)

Qualifications

b)

Experience

c)

Reputation

d)

Quality

36.

The cost of the full range of engineering services typically amounts to not less than 1 to 2% of the life-cycle cost of the most construction projects.

a)

True

b)

False

37.

is a process through which a Civil Engineer is selected above other competitors based on proposal or an innovative approach to solving a client's needs.

a)

Employment

b)

Design Competition

c)

Prime Professional Practice

d)

Contingency basis of Employment

38.

Engineers may request, propose or accept professional commissions on a contingency basis only under circumstances in which their professional judgments would not be compromised.

a)

True

b)

False

39.

These services deal primarily with collecting, interpreting, and reporting information, together with formulating conclusions and making recommendations.

a)

Consultations, Research Investigations and Reports

b)

Design Services for Construction Projects

c)

Construction Services

d)

Special Services for Construction Projects

40.

Involve full or part time teaching or training of

prospective professionals and also the upgrading of

knowledge and skills of fellow professionals.

a)

Academic Services

b)

Design Services for Construction Projects

c)

Construction Services

d)

Special Services for Construction Projects

41.

A condition when a Civil Engineer engages to

perform work or fill duties regularly for wages or

salary being paid by an employer.

a)

Academic Services

b)

Services as Employee

c)

Construction Services

d)

Special Services for Construction Projects

42.

These services usually precede the authorization of a capital project and may involve extensive investigations, analyses of conditions, and comparison of several possible plans.

a)

Preliminary and feasibility investigations and reports

b)

Planning studies

c)

Appraisals, Valuations and Rate Studies

d)

Assistance in financial matter

43.

These studies may include considerations such

as environmental impact, sustainable

development, operating costs, life cycle costs,

financing, and expected revenues, which form

the basis for conclusions and

recommendations on whether to proceed with

the project.

a)

Preliminary and feasibility investigations and reports

b)

Planning studies

c)

Appraisals, Valuations and Rate Studies

d)

Assistance in financial matter

44.

These services may include the broad areas of developing the engineering requirements of master plans

a)

Preliminary and feasibility investigations and reports

b)

Planning studies

c)

Appraisals, Valuations and Rate Studies

d)

Assistance in financial matter

45.

These services may include investigations and analyses of existing conditions; capital and operating costs; overhead costs and costs of financing; and revenues as needed to evaluate a property or to recommend establishment of prospective rates

a)

Preliminary and feasibility investigations and reports

b)

Planning studies

c)

Appraisals, Valuations and Rate Studies

d)

Assistance in financial matter

46.

The Civil Engineer may be engaged by a client who is planning to issue bonds, particularly revenue bonds, to finance a capital project

a)

Preliminary and feasibility investigations and reports

b)

Planning studies

c)

Appraisals, Valuations and Rate Studies

d)

Assistance in financial matter

47.

These services include tests of materials and equipment under establish codes and standards

a)

Materials Engineering and Equipment Tests

b)

Direct Personal Services

c)

Research and Development

d)

Special Services

48.

This includes services such as assistance in preparation for legal proceedings.

a)

Materials Engineering and Equipment Tests

b)

Direct Personal Services

c)

Research and Development

d)

Special Services

49.

(a) Development of new construction materials and methods from concept to commercialization

a)

Materials Engineering and Equipment Tests

b)

Direct Personal Services

c)

Research and Development

d)

Special Services

50.
  • - Value Engineering

  • - Appraisal and Valuation

  • - Load Testing

  • - Environmental Evaluations ...

a)

Materials Engineering and Equipment Tests

b)

Direct Personal Services

c)

Research and Development

d)

Special Services

51.
  • is a specialized investigation and gathering of data from existing resources or through laboratory works and processes

a)

Materials Engineering and Equipment Tests

b)

Research

c)

Consultations

d)

Special Services

52.

Analysis of the clients needs, conceptual design conceptual opinions of probable construction cost

a)

Study and Report Phase

b)

Preliminary Design Phase

c)

Final Design Phase

d)

Bidding or Negotiating Phase

53.

Preparation of final design criteria, preliminary drawings, outline specifications, and preliminary opinions of probable construction cost

a)

Study and Report Phase

b)

Preliminary Design Phase

c)

Final Design Phase

d)

Bidding or Negotiating Phase

54.

Preparation of design calculations, construction drawings, specifications, estimated construction cost, and other contract documents

a)

Study and Report Phase

b)

Preliminary Design Phase

c)

Final Design Phase

d)

Bidding or Negotiating Phase

55.

Assistance to the client with the bidding or negotiating process for construction of the project

a)

Construction Phase

b)

Operation Phase

c)

Final Design Phase

d)

Bidding or Negotiating Phase

56.

Advice and Consultation on matters related to his services

a)

Construction Phase

b)

Operation Phase

c)

Final Design Phase

d)

Bidding or Negotiating Phase

57.

Assistance to the client in start-up and operation of the project, including periodic inspections

a)

Construction Phase

b)

Operation Phase

c)

Final Design Phase

d)

Bidding or Negotiating Phase

58.

A licensed Civil Engineer is allowed to work as a construction contractor,

but only after getting the necessary license from the

a)

PRC

b)

Contractors Accreditation Board

c)

Contractors Accreditor Board

d)

Workshop

59.

As per RA (a)   , all subjects for licensure examinations

shall be taught by persons who are holders of valid

certificates of registration or professional licenses.

60.

CPD means

(a)  

61.

A Civil Engineer in part time employment with a firm

is not considered to be an employee and at the same

time a consultant of the firm.

a)

True

b)

False

62.

A licensed Civil Engineer may allow his licensed

to be used by the company that employs him

without the proper agreement for his professional

services.

a)

True

b)

False

63.

Appointing a selection committee of three or more members, including at least

one professional engineer with relevant expertise.

a)

True

b)

False

64.

are normally used to ascertain the general qualifications in a selected area of expertise

a)

Request for qualifications

b)

Request for Proposals

65.

are used to seek Civil Engineers for creating "short lists" for selecting a Civil Engineer for a specific project

a)

Request for qualifications

b)

Request for Proposals

66.

type of contract for engineering services is a

contract procedure used to supplement a client staff, either by providing

an extension to existing disciplines and capabilities already on board or

by adding special disciplines not available on the client'

s staff.

(a)  

67.

the process of submitting a tender by the contractor to the client as a proposal to

conduct or manage a particular construction project.

(a)  

68.

Bidding does not recognize professional judgment.

a)

True

b)

False

69.

this process involves the submission of a technical proposal in one envelope and a

price proposal in a second envelope

(a)  

70.

Problems of Two-envelope system

a)

accidental bidding process

b)

discourages participation

c)

increased cost for clients

71.

The ________ method provides more flexibility to accommodate both scope and fee changes than do either the fixed price or percentage or construction cost methods

a)

Reimbursable

b)

Hourly billing rates plus reimbursables

c)

Per diem

d)

Cost plus fixed fee (CPFF)

72.

is a frequently used method of determining charges for engineering services

a)

Salary cost times multiplier plus direct non-salary expense

b)

Per diem

c)

Cost Plus Fixed Fee

d)

Hourly billing rates plus reimbursable

73.

The salary cost times multiplier method may be utilized as either a multiplier times direct salary cost (single multiplier version) or a multiplier times salary cost (two multiplier version)

a)

True

b)

False

74.

is defined as "direct salaries plus employee benefits" and includes salaries for partners or principals and for technical, professional, administrative and clerical staff directly"

(a)  

75.

(a)   which is applied to salary cost is a factor that compensates the Civil Engineer for overhead plus a reasonable margin for contingencies, interest or invested capital readiness to serve and profit.

76.

usually incurred in engineering engagements and may include (1) living and travelling expenses (2) Identifiable communications expenses

(a)  

77.

The Civil Engineers (a)   which comprises a major portion of the compensation generated by the multiplier on salary cost includes indirect costs

78.

similar to the salary cost times multiplier method and includes all direct personnel expense, overhead and profit

(a)  

79.

the term (a)   normally refers to an eight-hour day

80.

Direct personal services are frequently charged on a

per diem basis.

a)

True

b)

False

81.

Under a (a)   agreement,

the civil engineer is reimbursed for actual

costs related to the project. These costs

are categorized as follows:

Salary cost

Overhead cost

Direct non-salary expense

Fixed fee

82.

The (a)   method can also be used when the Civil engineer is required to start providing service before the detailed scope of services can be determined.

83.

• Frequently used in

investigations, studies,

and design projects.

• Applied when scope and

complexity are clearly

defined.

(a)  

84.

Methods of calculating fixed price

a)

Summation of total

estimated costs

(direct method).

b)

Percentage of estimated

construction costs

(percentage method)

c)

Salary cost times multiplier plus direct non-salary expense

85.

The (a)   method is seldom used raw. Because of increasing complexity and large variation in tasks for projects

86.

may be used to determine the compensation of the engineer for services where the principal responsibility is the detailed design or construction supervision of facilities to be constructed

(a)  

87.

defined as the estimated total cost of constructing the facility to be covered by the proposed detailed design

(a)  

88.

3%

a)

Feasibility studies

b)

Detailed engineering design

c)

Detailed architectural and engineering design

d)

Construction supervision

89.

6%

a)

Feasibility studies

b)

Detailed engineering design

c)

Detailed architectural and engineering design

d)

Construction supervision

90.

8%

a)

Feasibility studies

b)

Detailed engineering design

c)

Detailed architectural and engineering design

d)

Construction supervision

91.

10%

a)

Feasibility studies

b)

Detailed engineering design

c)

Detailed architectural and engineering design

d)

Construction supervision

92.

The costs, which include audits, the cost of issuing bonds,

land costs, and interest for borrowed money during

construction, are part of the probable total project cost

and can best be estimated in cooperation with the client

because they are usually outside the knowledge and

control of the Civil Engineer.

a)

Legal, Land, Administration, Staffing, and Financial Costs

b)

Contingency Allowance

c)

Construction Cost

d)

Professional Engineering Cost

93.

It is commonly practice to add 20% or more to the estimated probable total project cost at the completion of the study end report phase, reducing this to perhaps 10% at the completion of final design and perhaps to 5% when the construction bids become known.

a)

Legal, Land, Administration, Staffing, and Financial Costs

b)

Contingency Allowance

c)

Construction Cost

d)

Professional Engineering Cost

94.

Larger or more complex projects may require higher contingencies

a)

True

b)

False

95.

means a sum of money that is included in the

contract price to cover the cost of materials,

parts, or equipment rentals related to the

Services in addition to those specified in the

Contract, if any.

(a)  

96.

For GROUP I. If the Project Construction Cost is P10 million and less, what is the minimum basic fee?

a)

6%

b)

P600,000 plus 5.5%

c)

P1,150,000 plus 4.5% of excess of P20 million

d)

P1,600,000 plus 3.5% of excess of P30 million

97.

For GROUP I. If the Project Construction Cost is over 10m-20m, what is the minimum basic fee?

a)

6%

b)

P600,000 plus 5.5%

c)

P1,150,000 plus 4.5% of excess of P20 million

d)

P1,600,000 plus 3.5% of excess of P30 million

98.

For GROUP I. If the Project Construction Cost is over 20m-30m, what is the minimum basic fee?

a)

6%

b)

P600,000 plus 5.5%

c)

P1,150,000 plus 4.5% of excess of P20 million

d)

P1,600,000 plus 3.5% of excess of P30 million

99.

For GROUP I. If the Project Construction Cost is over 30m, what is the minimum basic fee?

a)

6%

b)

P600,000 plus 5.5%

c)

P1,150,000 plus 4.5% of excess of P20 million

d)

P1,600,000 plus 3.5% of excess of P30 million

100.

For GROUP II. If the Project Construction Cost is over 30m, what is the minimum basic fee?

a)

7%

b)

P700,000 plus 6.5% of excess of P10m

c)

P1,350,000 plus 5.5% of excess of P20 million

d)

P1,900,000 plus 4.5% in excess of P30 million

101.

For GROUP II. If the Project Construction Cost is over 20m-30m, what is the minimum basic fee?

a)

7%

b)

P700,000 plus 6.5% of excess of P10m

c)

P1,350,000 plus 5.5% of excess of P20 million

d)

P1,900,000 plus 4.5% in excess of P30 million

102.

For GROUP II. If the Project Construction Cost is over 10m-20m, what is the minimum basic fee?

a)

7%

b)

P700,000 plus 6.5% of excess of P10m

c)

P1,350,000 plus 5.5% of excess of P20 million

d)

P1,900,000 plus 4.5% in excess of P30 million

103.

For GROUP II. If the Project Construction Cost is 10m and less, what is the minimum basic fee?

a)

7%

b)

P700,000 plus 6.5% of excess of P10m

c)

P1,350,000 plus 5.5% of excess of P20 million

d)

P1,900,000 plus 4.5% in excess of P30 million

104.

For GROUP III. If the Project Construction Cost is 10m and less, what is the minimum basic fee?

a)

8%

b)

P800,000 plus 7.5% of excess of P10m

c)

P1,550,000 plus 6.5% of excess of P20 million

d)

P2,200,000 plus 5.5% in excess of P30 million

105.

For GROUP III. If the Project Construction Cost is over 10m-20m, what is the minimum basic fee?

a)

8%

b)

P800,000 plus 7.5% of excess of P10m

c)

P1,550,000 plus 6.5% of excess of P20 million

d)

P2,200,000 plus 5.5% in excess of P30 million

106.

For GROUP III. If the Project Construction Cost is over 20m-30m, what is the minimum basic fee?

a)

8%

b)

P800,000 plus 7.5% of excess of P10m

c)

P1,550,000 plus 6.5% of excess of P20 million

d)

P2,200,000 plus 5.5% in excess of P30 million

107.

For GROUP III. If the Project Construction Cost is over 30m, what is the minimum basic fee?

a)

8%

b)

P800,000 plus 7.5% of excess of P10m

c)

P1,550,000 plus 6.5% of excess of P20 million

d)

P2,200,000 plus 5.5% in excess of P30 million

108.

For GROUP IV. If the Project Construction Cost is over 30m, what is the minimum basic fee?

a)

1.05%

b)

P105,000 plus 0.975% of excess of P10m

c)

P202,500 plus 0.825% of excess of P10 million

d)

P285,000 plus 0.675% in excess of P30 million

109.

For GROUP IV. If the Project Construction Cost is over 20m, what is the minimum basic fee?

a)

1.05%

b)

P105,000 plus 0.975% of excess of P10m

c)

P202,500 plus 0.825% of excess of P10 million

d)

P285,000 plus 0.675% in excess of P30 million

110.

For GROUP IV. If the Project Construction Cost is over 10m-20m, what is the minimum basic fee?

a)

1.05%

b)

P105,000 plus 0.975% of excess of P10m

c)

P202,500 plus 0.825% of excess of P10 million

d)

P285,000 plus 0.675% in excess of P30 million

111.

For GROUP IV. If the Project Construction Cost is 10m and less, what is the minimum basic fee?

a)

1.05%

b)

P105,000 plus 0.975% of excess of P10m

c)

P202,500 plus 0.825% of excess of P10 million

d)

P285,000 plus 0.675% in excess of P30 million

112.

If the civil engineer is not the prime professional for the groups I-III but renders basin civil engineering services only, his fee shall be a minimum of (a)   % of the prime professional fee.

113.

25% of Professional Fee + 25% of savings

(a)  

114.

P2000/ appearance

(a)  

115.

BS degree holder

a)

75-150 per hr

b)

150-250 per hr

c)

250-400 per hr

d)

500 per hr

116.

Master degree holder

a)

75-150 per hr

b)

150-250 per hr

c)

250-400 per hr

d)

500 per hr

117.

Doctorate degree holder

a)

75-150 per hr

b)

150-250 per hr

c)

250-400 per hr

d)

500 per hr

118.

Lecturer (PICE-CPD)

a)

75-150 per hr

b)

150-250 per hr

c)

250-400 per hr

d)

500 per hr

119.

Conducting tutorial/refresher courses

a)

75-150 per hr

b)

150-250 per hr

c)

250-400 per hr

d)

500 per hr

120.

Resource Speaker

a)

75-150 per hr

b)

150-250 per hr

c)

250-400 per hr

d)

500 per hr

121.

Writer/Author

a)

3000/article

b)

2000/article

c)

4000/article

d)

2500/article

122.

I. Ranking Firms, II. Interviews, III. Qualification Evaluation, IV. Project Announcement, V. Scope and Compensation Negotiation, VI. Compensation Evaluation, VII. Contract Formalization, VIII. Budget Preparation, IX. Detailed Proposal Request, X. Reference Checks, XI. Negotiation Process

a)

IV, VIII, III, IX, II, X, I, V, VI, XI, VII

b)

IV, VIII, III, II, IX, X, I, V, VI, XI, VII

c)

IV, VIII, III, IX, II, X, I, V, XI, VI, VII

d)

IV, VIII, III, IX, II, I, X, V, VI, XI, VII

123.

The average multiplier should be between (a)   times the average salary cost

124.

The Civil Engineer who performs services under a salary cost times multiplier agreement or other cost-based agreement must provide the accounting necessary to segregate and record the appropriate expenditures.

(a)  

125.

The ______ charge should be based on the complexity, risk, and important of the services and on the Civil Engineer's professional standing, expertise, and breadth of experience.

a)

Per Diem

b)

Hourly Billing Rates

c)

Cost plus Fixed Fee

d)

Fixed Price

126.

Simple Structures such as lofts, warehouse, garages, sheds, market buildings, and comparable projects of one but not more than two stories

a)

Group I

b)

Group II

c)

Group III

d)

Group IV

127.

Buildings of 3 stories up to 14 stories, towers, tanks, exhibition buildings, memorials, industrial buildings, simple bridges, low dams, piers, wharves, bins, and silos and comparable projects

a)

Group I

b)

Group II

c)

Group III

d)

Group IV

128.

Buildings with fifteen (15) or more floors, long span and complex bridges, high dams, major portworks power plants and other complex structures not covered in Groups I and II

a)

Group I

b)

Group II

c)

Group III

d)

Group IV

129.

Hotels, large apartment buildings, office buildings, shopping centers, store buildings, resorts, hospitals, and comparable projects

a)

Group I

b)

Group II

c)

Group III

d)

Group IV

130.

is an essential ingredient in quality engineering services

(a)