Plumbing Processes PPT 3 - Site Preparation Techniques

Total questions: 42

Worksheet time: 21mins

Name
Class
Date
1.

Which of the following is a method for planning work in the installation of domestic heating systems?

a)

Job schedules

b)

Random inspections

c)

Customer feedback

d)

Marketing strategies

2.

What is included in the planning process for installing a domestic hot/cold water system?

a)

Material lists and delivery

b)

Customer surveys

c)

Financial audits

d)

Advertising campaigns

3.

What should be done with tools and materials on a large site when not in use?

a)

Leave them in the open

b)

Lock them away in a secure lock-up

c)

Store them in a temporary shed

d)

Keep them in a vehicle

4.

What should be done to materials like sanitaryware, boilers, and radiators to prevent damage?

a)

Leave them uncovered

b)

Stack them to a safe height and cover them

c)

Store them in a damp area

d)

Place them on the ground

5.

What is one of the purposes of using a works program or job schedule in project planning?

a)

To increase project costs

b)

To show a start and finish date

c)

To reduce the number of staff

d)

To eliminate the need for equipment

6.

Which of the following is NOT a purpose of a works program or job schedule?

a)

Shows the required staff and equipment

b)

Allows monitoring of the project

c)

Shows the order of sequence

d)

Increases project complexity

7.

How does a works program or job schedule help in project management?

a)

By hiding the project timeline

b)

By showing the order of sequence

c)

By removing project deadlines

d)

By reducing staff requirements

8.

What does refurbishment in plumbing design typically involve?

a)

Building a new house

b)

Installing a new roof

c)

Adding a new boiler or bathroom

d)

Painting the exterior

9.

What should be used to protect a customer's personal belongings from dust and damage during installation?

a)

Plastic sheets

b)

Clean dust sheets

c)

Old newspapers

d)

Tarpaulins

10.

When should the position of radiators, boilers, and visible pipework be agreed upon with the customer?

a)

During the installation

b)

After the installation

c)

At the planning stage

d)

After the first inspection

11.

How should a customer's garden be protected when working outside the building?

a)

By digging ladders into lawns

b)

By using walk boards and protective sheeting

c)

By covering with plastic tarps

d)

By using sandbags

12.

What should be inspected for prior to starting work in an area?

a)

Color of the walls

b)

Pre-installation damage like chips, dents, scraps, and burns

c)

The type of flooring

d)

The size of the room

13.

What should be done with breakable or large items in the working area?

a)

Leave them as they are

b)

Cover them with dust sheets

c)

Remove them or ask the customer to remove them

d)

Ignore them

14.

What is a recommended practice to prevent flame damage when working on site?

a)

Use water sprays

b)

Use heat mats

c)

Use fire extinguishers

d)

Use sandbags

15.

Why should protective tape or plastic coverings on sanitaryware be removed before installation?

a)

To reduce installation time

b)

To check for damage from manufacture and transit

c)

To improve aesthetic appearance

d)

To prevent water damage

16.

What should be done to check for existing damage before starting work?

a)

Conduct a safety drill

b)

Walk around the house with the customer

c)

Take photographs of the site

d)

Review the building plans

17.

What should you always check for before drilling to avoid damage?

a)

The weather forecast

b)

Buried pipes or cables

c)

The time of day

d)

The type of drill bit

18.

What tool is useful for detecting buried pipes or cables?

a)

Hammer

b)

Screwdriver

c)

Cable or pipe detector

d)

Tape measure

19.

Where should you look for switches and sockets to determine if pipes are buried?

a)

In the ceiling

b)

In the wall or under the floorboards

c)

Outside the building

d)

In the attic

20.

What is the purpose of chasing in plumbing?

a)

To paint walls

b)

To conceal pipework or cables

c)

To install windows

d)

To clean surfaces

21.

Which tools are mentioned for chasing?

a)

Screwdriver and wrench

b)

Lump hammer and chisel, or angle grinder then chisel

c)

Saw and drill

d)

Pliers and tape measure

22.

What are floorboards commonly known as?

a)

Tongue and groove

b)

Nail and screw

c)

Carpet and laminate

d)

Noggins and cleats

23.

How are floorboards typically secured in place?

a)

Glued

b)

Nailed or screwed

c)

Taped

d)

Clipped

24.

What might be needed if a floorboard cut is off the joist?

a)

A noggin or cleat

b)

A hammer

c)

A screwdriver

d)

A level

25.

What should you ensure when making a cross-cut on a floorboard?

a)

The cut is over the joist, where possible.

b)

The cut is in the middle of the board.

c)

The cut is at a 45-degree angle.

d)

The cut is parallel to the joist.

26.

What tool is recommended for cutting through the tongue of a floorboard?

a)

Floorboard saw or circular saw

b)

Hammer and chisel

c)

Jigsaw

d)

Hacksaw

27.

What should be done after removing floorboards?

a)

Leave nails and screws in the joists

b)

Leave waste in the ceiling cavity

c)

Secure firmly afterwards

d)

Paint the joists

28.

What is the maximum depth of a notch in a timber joist relative to its depth 'D'?

a)

1/4 D

b)

1/8 D

c)

1/2 D

d)

1/16 D

29.

What is the formula for the maximum length of a notch in a timber joist relative to the span 'S'?

a)

0.1 × S

b)

0.07 × S

c)

0.2 × S

d)

0.05 × S

30.

What is the maximum depth of notch that can be made in a joist that is 200mm deep?

a)

25mm

b)

20mm

c)

30mm

d)

15mm

31.

What is the minimum distance from the wall that a notch can be placed if the joist has a span of 2.5m?

a)

175mm

b)

150mm

c)

200mm

d)

125mm

32.

What is the maximum permissible drilled hole size in a joist?

a)

0.5 times the joist depth

b)

0.25 times the joist depth

c)

0.75 times the joist depth

d)

1.0 times the joist depth

33.

Where must the drilled holes be located in a joist?

a)

At the top of the joist

b)

At the bottom of the joist

c)

On the center line

d)

On the edge of the joist

34.

How close can holes be drilled together in a joist?

a)

No closer than two times their diameter

b)

No closer than three times their diameter

c)

No closer than four times their diameter

d)

No closer than five times their diameter

35.

Where in the joist can the hole be drilled?

a)

On the centre line of the joist only

b)

Anywhere along the joist

c)

Near the edge of the joist

d)

At the top of the joist

36.

How close together can drilled holes be placed in a joist?

a)

No closer than three times their diameter

b)

No closer than twice their diameter

c)

No closer than four times their diameter

d)

No closer than their diameter

37.

What is the purpose of covering pipework laid in floors and across joists with lagging?

a)

To prevent water leakage

b)

To allow for expansion and contraction without noise

c)

To increase water pressure

d)

To improve water quality

38.

What can be used to protect pipework against nails and screws?

a)

Rubber seal

b)

Pipe guard (cover plate)

c)

Plastic wrap

d)

Insulation foam

39.

What is the first step in job preparation according to the document?

a)

Install

b)

Walk the job

c)

Mark out

d)

Inform customer

40.

Which of the following is NOT mentioned as part of preparing the job?

a)

Clear access

b)

Lift boards

c)

Install equipment

d)

Protect area and property

41.

What does "Mark out" involve according to the document?

a)

Planning and visual assessment

b)

Clip positions, levels, chases, drilling

c)

Carrying out necessary tasks

d)

Informing the customer

42.

Why is it important to inform the customer during job preparation?

a)

To plan and visually assess

b)

To clear access and lift boards

c)

To notify about work location, utility shutdowns, and hazards

d)

To carry out necessary tasks