Construction Trades Quiz

Total questions: 15

Worksheet time: 25mins

Name
Class
Date
1.

Which term refers to the process of bringing a building or structure back to its original state?

a)

Renovation

b)

Rebuilding

c)

Conservation and repair

d)

Reclamation

2.

Which term describes a person or company that agrees legal terms to provide a paid service?

a)

Director

b)

Contractor

c)

Spokesperson

d)

Administrator

3.

Which skilled worker would install ‘structural carcassing’?

a)

Plasterer

b)

Electrician

c)

Carpenter

d)

Engineer

4.

To which trades do the terms ‘first and second fix’ apply?

a)

Bricklaying, block laying and stonemasonry

b)

Electrical, plumbing and carpentry

c)

Civil engineering, heating and ventilation

d)

Plastering, roofing and painting

5.

Which skilled operative would undertake ‘setting out’ on a project site?

a)

Electrical engineer

b)

Carpenter

c)

Civil engineer

d)

Roofer

6.

Which of the following trades falls under ‘building services’?

a)

Plumbing

b)

Bricklaying

c)

Carpentry

d)

Plastering

7.

What does the term ‘finishing’ mean for a bricklayer?

a)

The brickwork activity on site is now fully completed

b)

The surplus bricks and blocks have been removed

c)

The bricks allocated to the job have been used up

d)

The brickwork has been jointed or pointed properly

8.

What is an advantage of using lime plaster rather than gypsum plaster when working on historic buildings?

a)

It is known for its ability to let structures ‘breathe’, which helps to reduce damp

b)

It is not affected by humidity or air temperature at the work location

c)

It hardens quickly during application when the air temperature is low

d)

It is easier to mix large quantities to cover greater areas of wall or ceiling

9.

Explain the benefits of understanding the roles of other workers on site.

4 lines
10.

Describe the differences in the skills and activities of construction workers and building services workers.

4 lines
11.

What are ‘wet’ trades and why do they require high skill levels to produce an acceptable finish?

4 lines
12.

If you were given a work task on a historic building, why would it be better to use the same materials that were used when the building was constructed (if they are available)?

4 lines
13.

How far have the materials been transported? Materials from a nearby source will reduce the amount of carbon generated during transport. Think about the carbon footprint of slates sourced in Wales compared with slates transported from China or India.

4 lines
14.

Does the source of the materials support sustainability? For example, timber for construction should be obtained from managed forests, where trees are replanted after harvesting to maintain a sustainable source of timber for the future.

4 lines
15.

Is the manufacturing process designed to minimise waste? Many construction materials such as brick, glass, timber and concrete can be recycled or reused. Waste management is important to support reuse and recycling at the point of manufacture and on site.

4 lines