wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

HSE Quiz - 2

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

ZeTo Rules No.1

a)

Verify energy isolation before starting work.

b)

Work with a valid work permit (PTW) required by the job.

c)

Obtain authorization before overriding or disabling safety critical equipment.

d)

Do not position yourself under a suspended load.

2.

How many rules are in "Process Safety Golden Rules"

a)

6

b)

7

c)

8

d)

9

3.

Meaning of P.E.A.R

a)

People, Environment, Asset, Reunion

b)

People, Electrical, Aset, Reputation

c)

People, Equipment, Asset, Risk

d)

People, Environment, Asset, Reputation

4.

Tool to submit Unsafe Act, Unsafe Condition and Safe Observation report.

a)

UACU

b)

UAUC

c)

UUAC

d)

4U2C

5.

The "________" campaign aims to promote safety and prevent accidents during the monsoon season.

a)

Monsoon Zero

b)

Monsoon Hero

c)

Monsoon Ziza

d)

Monsoon Zizo

6.

What must be done to protect yourself when working at height?

a)

Use a ladder

b)

Wear a helmet

c)

Use fall protection equipment

d)

Spider sense

7.

Where is smoking allowed according to ZeTo Rules?

a)

Anywhere

b)

Designated areas only

c)

Near process areas

d)

Inside vehicles

8.

What should you not use while driving according to ZeTo Rules?

a)

GPS

b)

Mobile phone/walkie-talkie

c)

Air conditioning

d)

Radio

9.

What is the first step in managing process safety risks?

a)

Conducting a risk assessment

b)

Implementing safety measures

c)

Training employees

d)

Monitoring equipment

10.

What must be done before starting any maintenance work on process equipment?

a)

Notify the supervisor

b)

Isolate and de-energize the equipment

c)

Conduct a safety briefing

d)

Obtain a work permit

11.

The objectives of this event are, EXCEPT

a)

Sharing experiences / lesson learnt related to HSE

b)

To raise awareness of safety related to CBM

c)

Get together to strengthen bonding among CBM team

d)

Playing games and answer quizzes

12.

System1 Findings at PMA during 2023-2024 are, EXCEPT

a)

Rotor unbalance

b)

Data loss

c)

Erratic Issue

d)

Good Communication

13.

Which is the unit on high vibration issue mentioned on Focus Storytelling segment?

a)

Bekok-A C700B

b)

Bekok-B C700B

c)

Bekok-C C700B

d)

Bekok-A C700A

14.

These were the lessons learnt mention in Firm Synergy HSE segment, EXCEPT:

a)

Effective supervision and oversight

b)

Distraction can lead to accident

c)

Strict adherence to safety standards

d)

Unclear communication and blurry signage

15.

These are the vibration finding issues on GTC in SBA sharing segment, EXCEPT:

a)

Sensor issue

b)

Coupling issue

c)

Process issue