Font size
WorksheetsEngineering Final Review
Total questions: 33
Worksheet time: 21mins
Piers are
Vertical Columns
Horizontal Columns
Underway Columns
Diagonal Columns
The roadway is the horizontal structure that
Enables transport across a bridge
Enables a barrier across a bridge
Enables stability across a bridge
Enables mechanics across a bridge
Mechanics is the study of ____ and ____ ____
Forces
Physical Objects
Strength
Object Stability
Shear forces are forces that act
In opposite direction
In same direction
True or False: Stable load is the weight of itself (Dead Load)
True
False
A skeleton is/was attached to ____ and ____
Footlings
Piers
Truss
Horizontal Stabalizers
A structure is an arrangement of
Parts made to withstand landing/given forces
Parts made to withstand the harsh weather
Parts made to withstand human violence
Parts made to withstand a wrecking ball
The goal of structural analysis is to (Pick 2)
Make sure a structure is as strong as possible
Make sure a structure is efficient at staying the same color
Make sure a structure is as efficient as possible
Make sure a structure is as elegant as possible
Braces that resist compression are known as
Struts
Pillar stabilizers
Footlings
Skeletal Holders
Tension is
A pushing force (Compress)
A pulling force (Stretch)
A lifting force (Float)
A exploding force (Combust)
Torsion is
A Pulling force
A Pushing force
A turning force
A Exploding force
Truss is used by
A number of biomedical engineers from boats to bridges to buildings
A number of electrical engineers from boats to bridges to buildings
A number of civil engineers from boats to bridges to buildings
A number of Structural engineers from boats to bridges to buildings
Truss allows for
The stress of an object to be in one spot
The stress of an object to be in a joint
The stress of an object to be spread out
The stress of an object to be in half of the structure
Civil engineers work
Alone
With random people
Together
A drawing made with only pencil and paper is called a
(a)
Civil engineers rarely work
Alone
Together
The strongest shape for a bridge is a
Cube
Square
Triangle
Dodecahedron
Civil engineers work on public works, such as (Select 3)
Roadways
Bridges
Boats
Tunnerd
When making a drawing in CAD and you want to duplicate an object several times, you would use the (a) command
An environmental engineer works on (Select 2)
Solar panels
Auto-planters
Sprinklers
Wind Turbines
True or False: Adding load to stable load (Dead Load) does NOT change what it is called or its properties
True
False
A biomedical engineer could be working on a
Wind turbine
Chair
X-Ray
AntiCardiac machine
The three views of an isometric design are
Top, Side, and Front view
Top, Side and Bottom view
Bottom, Back, and Top view
Not Here
The first step in the engineering process is to
Define Solution
Problem definition
Solution Creation
Design Impliment
When creating a drawing, the top view should be above the ____ View(s)
Bottom view
Side view
Front view
All views
The offset command in CAD is used to
Duplicate an object
Delete an object while replacing it with a new object at a specific distance from the original
Copy and paste an object on top of the original
Duplicate an object a specific distance from the original
A (a) line is used to show an edge of feature that is not visible from the side of view
Mock-up is when
A full sized model is made (That does nothing)
A full sized model is made (That does something)
A full sized model is made (That does the same as the mocked object)
The ____ is a portable power source
Car
Battery
Phone
Wire
Select the order that an engineer should use for design improvement and creating a prototype
Idea generation, Solution creation, find solution or output, Testing/analysis. design improvement.
Problem Definition, Idea generation, Solution creation, Testing/analysis, find solution or output, design improvement.
Problem Definition, Idea generation, Testing/analysis, Solution creation, find solution or output, design improvement.
Problem Definition, Idea generation, Solution creation, find solution or output, Testing/analysis. design improvement.
Engineers are expected to communicate solutions through (Select 3)
Verbal communication
Written communication
Signed Communication
CAD- Produced designs
Engineers are expected to stay up to date with current (a) practices
(a) line is a type of line that shows an edge that can be seen from the current angle
