Font size
Worksheetse_hana_up_con
Total questions: 105
Worksheet time: 1hrs 5mins
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this? (Choose two.)
Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
Import a transport request from the development system that contains the recording of the activation.
Activate the required business functions manually in the production system.
During conversion, SUM delivers some business functions already activated.
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
To optimize the main import
To optimize the activation
To optimize the conversion
To optimize the migration
You want to use the Custom Code Migration Worklist via remote code analysis using the ABAP Test Cockpit (ATC).
How can you get the latest content of the simplification database?
Apply the corresponding SAP Note via the Note Assistant.
Configure it within transaction ATC.
Download it from the SAP Support Portal.
Generate it by analyzing the specific custom code via RFC.
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAU. There you find programs that are shown in status “automatic adjustment” (green traffic light).
What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.
SUM continues with the next phase and your modifications are kept as in the start release.
Before continuing with the next phase, SUM asks for a modification adjustment transport.
SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? (Choose two.)
Assign the transport request as a modification adjustment transport.
Create new versions of the objects you need to adjust.
Manually activate the adjusted dictionary objects.
Release the transport request containing the modification adjustment.
What is the benefit of using the UPGANA.XML file from a previous SUM run?
To skip selected phases during the SUM run
To repeat specific phases during the SUM run
To make the progress information within SUM UI more accurate
To auto-fill specific fields on selected screens on the SUM UI
During a SUM run, you want to check if the PARCONV_UPG phase is still running properly.
Where can you find information about this? (Choose two.)
Check the running batch job via Job Overview (SM37).
Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp.
Check for running R3trans processes on the host where SUM is running.
Check for running R3load processes on the host where SUM is running.
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
Table count verification
DMO with system move
Migration repetition option
Table contents compare
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? (Choose two.)
Standalone AS ABAP with SAP_BASIS 752
SAP Solution Manager 7.2
SAP ECC system from SAP ERP 6.0 EHP 8
SAP S/4HANA Server 2022
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? (Choose two.)
Main import
Migration
Conversion
Software update
What are the benefits of using the benchmarking option of the DMO for SUM? (Choose two.)
You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
You can verify that the content of the download directory matches the stack XML file.
You can record the modification adjustment during migration and use the transports in the next runs.
You can find the optimal number of parallel R3load processes by monitoring host performance.
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMO as an inplace migration.
How does SUM transfer the data from the source database to the target database during the migration?
Using R3load and file transfer
Using R3load and memory pipes
Using R3load and network socket connection
Using work processes and network socket connection
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB.
Which of the following are possible paths to perform an SAP S/4HANA conversion? (Choose three.)
1 - SAP S/4HANA conversion including database migration and Unicode conversion
1 - Unicode conversion
2 - Upgrade to SAP ECC with SAP_BASIS 750 including database migration
3 - SAP S/4HANA conversion without database migration
1 - Unicode conversion
2 - Database migration
3 - SAP S/4HANA conversion without database migration
1 - Unicode conversion
2 - SAP S/4HANA conversion including database migration
1 - Unicode conversion
2 - SAP S/4HANA conversion without database migration
3 - Database migration
You are performing an SAP S/4HANA conversion with scenario strategy Standard.
Which phases are executed during SUM technical downtime? (Choose two.)
PARDIST_SHD
TABIM_UPG
TABIM_SHADOW_INC
PARMVNT_APPL_VIEWS
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.
What could be the reason?
The SAP S/4HANA Conversion is without DMO.
The SAP S/4HANA Conversion includes a DMO.
The source database is not supported for DoC.
The start release is too old for DoC.
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?
The path is taken from the URL entered in the browser to start SUM.
The path was stored to the environment of user <sid>adm during registration.
The path was stored in file sumabap.conf during registration.
The path was stored in file host_profile during registration.
You want to perform an SAP S/4HANA conversion using SUM with inplace DMO.
Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? (Choose three.)
Import of dictionary objects from the download directory in phase DDIC_UPG
Import of upgrade and language data from the download directory in phase TABIM_UPG
Activation of dictionary objects in phase ACT_UPG
Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
Generation of the new ABAP loads in phase RUN_SGEN_GENER8
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server 2022?
740
700
750
731
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
Near-Zero Downtime Technology (NZDT)
Near-Zero Downtime Maintenance (nZDM)
Downtime Optimized DMO (DoDMO)
Downtime Optimized Data Conversion (DoC)
How does SUM recognize modification adjustment transports from predecessor systems?
By searching for transport requests named <sid>KO<number>
By searching for transport requests that are assigned to project SAP_ADJUST
By searching for transport requests in DIR_TRANS, subdirectory “transport”
By searching for transport requests in file umodauto.lst
Which steps can SUM perform during an SAP S/4HANA conversion? (Choose two.)
Custom code analysis
Database migration
Unicode conversion
Software update
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
Perform the migration of data to the new data structure.
Check the compatibility of custom code with SAP S/4HANA.
Run the database migration to the SAP HANA database.
Solve problems from the simplification item (SI) checks.
You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?
The end of the business downtime
The start of the business downtime
The end of the database migration
The start of the Execution roadmap step
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? (Choose three.)
Perform an SAP S/4HANA conversion without DMO.
Upgrade the SAP system.
Perform an SAP S/4HANA conversion including DMO.
Use DMO for SUM.
Apply SAP Support Packages.
You are executing as SAP S/4HANA Conversion with scenario strategy Standard.
When will the shadow instance be stopped for the last time?
Before the downtime starts
Early in the downtime
At the end of the downtime
As part of the cleanup process
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HANA. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
Kernel for target release, Windows, SAP MaxDB
Kernel for target release, Linux, SAP HANA
Kernel for target release, Windows, SAP HANA
Kernel for source release, Windows, SAP MaxDB
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Parameter file SAPup_add.par
Stack XML file calculated by the Maintenance Planner
Breakpoint configuration file SAPUPPHAS.BRK
MIGRATE MIGRATE_DT_DUR.XML file from a previous run
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Execution of SPAU modification adjustment
Execution of eCATTs for business validation tests
Creation of the table structures in the new SAP HANA database
Execution of SPDD modification adjustment
Execution of XPRAs and AIMs
You downloaded content from the SAP note 1000009 ("ASU Toolbox"). Which transaction needs to be executed to use that content in the ASU Toolbox?
/ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
/ASU/SSM (ASU Simple Schedule Manager)
/ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
/ASU/AMT (Start ASU Toolbox)
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
SYCM (Simplification Database Content)
SAT (Runtime Analysis
ATC (ABAP Test Cockpit)
SE80 (Object Navigator)
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
It performs a comparison on selected tables using check sum.
It performs a comparison on all tables using row counts.
It performs a comparison of all tables using check sum.
It does NOT perform any table comparison.
During a SUM run you want to check if the phase TABIM_SHADOW_INC is still running properly. Where can you find information about this?
Check for running batch jobs in the shadow system via Job Overview (SM37)
Check for running R3trans processes on the host of the primary application server
Check for running R31oad processes on the host of the primary application server
Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
An upgrade of the software components is performed, without changing the database type.
A change of the database type is performed, without changing the software components.
An SAP S/4HANA conversion is performed, without adapting the customer data.
- A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
The SAP S/HANA Conversion Guide
The Application Guide
The major SUM Guide
The DMO Guide
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
- Uptime migration EU_CLONE_MIG_SOT_PRP
ParaUel distribution (PARDIST_SHD)
Downtime migration (EU_CLONE_MIG_DT_RUN)
Shadow repository creation (EU_IMPORT*)
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
Check the 'Charts Control Center' in the SUM UI
- Check logs for jobs starting with 'RSUPG_SGEN' in the system
Check the log files written under 'SUM\abap\log'
Check the dump size of the database export on disk
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
Keep archiving on during the whole procedure.
Use the Near Zero Downtime Maintenance Technology (NZDM).
Reuse a profile for the shadow instance from a previous run.
Choose the instance number of the shadow instance.
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
- Conversion of application tables (PARCONV_UPG)
Activation of dictionary objects (ACT_UPG)
Switch to new repository (EU_SWITCH)
Modification adjustment (SPDD)
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel. Why are 40 Process Buckets executed in parallel?
There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
These are 40 pairs of R3load processes, so there are 80 R3load processes running.
Which preparational steps must be performed for an SAP S/4HANA conversion?
Uninstall industry extensions not supported by SAP S/4HANA
Install add-on SAP Gateway 7.50
Uninstall SAP Fiori apps
Delete client 066 (Early Watch Client)
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
Apply the corresponding SAP note via SAP Note Assistant
Generate it by analyzing the specific custom code via RFC
Configure it within transaction ATC
Download it from SAP Support Portal
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
Standalone AS ABAP with SAP_BASIS 752 and above
SAP ECC system from SAP ERP 6.0 EHP 8
SAP Solution Manager 7.2
SAP S/4HANA Server 1809 and above
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA What do you need to consider?
The source system is non-Unicode and the target database is a scale-out system.
The target database size increases temporarily because of the Shadow Repository.
SAP HANA Landscape Reorganization required a manual step to edit a file.
Network capacity between exporting and importing R3load processes must be.
Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or lower
What do you need to know about the SAP S/4HANA Conversion Guide?
It explains the database migration option (DMO) of SUM.
It contains a manual preparational for the SAP S/ 4HANA conversion.
It contains follow-on steps for the SAP S/ 4HANA conversion.
It is a database-specific document.
Which of the following are valid options to check the progress of an inplace SUM DMO run?
- Check the dump size of the database export on disk.
Check the Charts Control Center in the SUM Ul
Check logs for jobs starting with RSUPG_SGEN in the SAP system.
Check the log files written in the SUM directory subdirectory abap. subdirectory log
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion?
Depending on the SAP S/4HANA version, there are different SI check frameworks.
The SI checks are executed in the development system and the results are transported into the subsequent systems.
You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
You need to build up a SI check framework by applying SAP notes.
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime?
PARCONV_UPG
TABIM_UPG
PARDIST_SHD
TABIM_SHADOW_*
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?
After SUM has ended
During the Execution roadmap step
Before the start of the SUM technical downtime
During the SUM technical downtime
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
After the SUM roadmap step 'Execution' is finished and before 'Postprocessing'
During the SUM roadmap step 'Postprocessing', after the post procedure steps are complete
During the SUM roadmap step 'Postprocessing', in parallel with post procedure steps
After the SUM roadmap step 'Postprocessing' and post procedure steps are finished
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
Shadow on target creation
Downtime conversion
Silent data migration (SDM)
Downtime migration
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column. What does the "Calculated level" indicate for those software components?
The SAP Support Packages that will be bound to the upgrade
The SAP Support Packages contained in the upgrade media and calculated by maintenance planner
The SAP Support Packages found in the download directory
The SAP Support packages of the download directory, calculated by the Maintenance Planner
Which circumstances will allow SUM to run without the creation of a shadow system?
Using the main configuration option 'Single System' when installing an Add-On
Using the main configuration option 'Single System' in case of an upgrade.
Using the database migration option (DMO) for SUM
Using the main configuration option 'Standard' when applying SAP Support Packages
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
Check the most recent entries shown in file sapevt.trc
Check the system log (transaction SM21) of the SAP system
Check the messages shown by the SUM UI
Check the most recent entries in SAPup.log
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Credentials of a named user in client 000 of the shadow system
Credentials of a named user in the development client of the development system
Credentials of user DDIC in client 000 of the shadow system
Credentials of user DDIC in the development client of the development system
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance?
Modification adjustment (SPAU)
Modification adjustment (SPDD)
Activation of dictionary objects (ACT_UPG)
Conversion of application tables (PARCONV_UPG)
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction". Where can you change this during the migration via the Utilities option of the SUM UI?
In SUM Phaselist
In Process Control Center
In SUM Parameters
In DMO Migration Preparation
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?
Credentials of a named user in client 000 of the shadow system
Credentials of a named user in the development client of the development system
Credentials of user DDIC in client 000 of the shadow system
Credentials of user DDIC in the development client of the development system
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?
The benchmaking option allows you to migration a specified set of tables
The benchmaking option allows you to repeat the uptime migration
The repetition option allows you to run the migration without a shadow system
The repetition option allows you to repeat the complete migration
Which of the following SUM activities require a stack XML file calculated by the maintenance planner?
SAP S/4HANA conversion including DMO
Prerequisite check
DMO without system update
SAP S/4HANA conversion without DMO
Benchmark tool
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
Upgrading to SAP ECC 6.08 without using DMO
Using DMO when applying Support Packages to SAP ECC 6.07
SAP S/4HANA conversion to SAP S/4HANA 1709
Updating to SAP ECC 6.07 using DMO
Which of these tools are transactions in the SAP system to be converted?
Choose the correct answers.
ASU Toolbox Application Conversion Assistant (ATACA)
Custom Code Analysis
SAP Readiness Check
SUM Toolbox
Which of the following are reasons to change from SAP ECC on SAP HDB to SAP S/ 4HANA Server on SAP HDB?
To take advantage of the column based data storage.
To use database procedures.
To use column based data storage.
To use in-memory technology.
To need less aggregate and history tables.
SAP S/4HANA Server systems run with the SAP HANA database, only.
Determine whether this statement is true or false.
True
False
For which of the following can you perform an SAP S/4HANA Conversion?
Choose the correct answer.
SAP ECC
SAP ERP
SAP Solution Manager
SAP BW
Which of the following changes is considered to be an SAP S/4HANA Conversion?
Choose the correct answers.
From SAP S/4HANA Server 2020 on SAP HANA DB to SAP S/4HANA Server 2022 on SAP HANA DB.
From SAP ECC 6.00 on Oracle DB to SAP S/4HANA Server 2022 on SAP HANA DB.
From SAP ECC 6.08 on Oracle DB to SAP ECC 6.08 on SAP HANA DB.
From SAP ECC 6.08 on SAP HANA DB to SAP S/4HANA Server 2022 on SAP HANA DB.
When will the extended maintenance of SAP ECC 6.08 end?
Choose the correct answer.
End of 2030
End of 2027
End of 2025
End of 2023
Which activities have to be performed before running the SUM for an SAP S/4HANA Conversion?
Choose the correct answers.
Custom Code Analysis
Calculation of the stack.XML file via Maintenance Planner
SI Checks
SAP Readiness Check
You need a stack.XML file to run the SUM for an SAP S/4HANA Conversion.
Determine whether this statement is true or false.
True
False
Which software packages can be calculated by Maintenance Planner for an SAP S/4HANA Conversion to SAP S/4HANA Server 2020?
Choose the correct answers.
SAP FIORI FES FOR S/4HANA
SAP GUI installation software
SAP Kernel 64-BIT UNICODE
TCIs for required SAP Notes
SOFTWARE UPDATE MANAGER 2.0
In which client should you run the SI Check program /SDF/RC_START_CHECK?
Choose the correct answer.
000
066
100
101
What SAP system can you use as a central check system for the custom code analysis?
Choose the correct answers.
AS ABAP 7.52
SAP S/4HANA Server 2022
SAP ECC 6.08
SAP Solution Manager 7.2
Which client, if exists, must be deleted before running an SAP S/4HANA Conversion?
Choose the correct answer.
066
001
000
200
Which information is contained in the central SUM SAP Note for SAP S/4HANA Conversion 'Additional information on converting to SAP S/4HANA using SUM 2.0 SP<nn>'?
Choose the correct answers.
Possible conversion paths
Performing manual activities
Performing modification adjustment
Important application specific SAP Notes
Starting the SUM
Which information is contained in the guide 'Conversion to SAP S/4HANA using SUM: ABAP System on Windows'?
Choose the correct answers.
Preparation activities
SI Checks
Running the Software Update Manager
Custom Code Analysis
Follow-up Activities
Which SUM version should you use when starting your SAP S/4HANA Conversion project?
Choose the correct answer.
SUM 2.0, highest SP version
SUM 2.0, patch on request version
SUM 1.1, highest SP version
SUM 1.1, version for SAP HDB
How does the SUM UI connect to the SAPup tool?
Choose the correct answer.
Via the SAP Host Agent
Via the SUM controller
Via the SAP HANA Client
Via R3trans
How can you receive the SUM Toolbox?
Choose the correct answer.
By downloading and installing it from Software Download Center
By implementing the corresponding SAP TCI Note
By uploading the corresponding content zip-file
When performing an SAP S/4HANA Conversion, which SUM strategy can you use in any case?
Choose the correct answer.
Standard
Single System
Near-Zero Downtime Maintenance (nZDM)
Downtime optimized DMO (DoDMO)
When performing an SAP S/4HANA Conversion, which steps are done by SUM in any case?
Choose the correct answers
Software update to SAP S/4HANA Server
Major part of data conversion
Installation of SAP HANA database client software
Database migration to SAP HANA database
How is the Silent Data Migration (SDM) started?
Choose the correct answer.
By calling transaction SDM_USER.
By executing program BTCTRNS2.
By executing tp unlocksys SID.
The central SUM SAP Note for SAP S/4HANA Conversion, Additional information on converting to SAP S/4HANA using SUM 2.0 SP <nn>, contains information about problems after the conversion.
Determine whether this statement is true or false.
True
False
The guide, Conversion to SAP S/4HANA using SUM: ABAP Systems on Windows, contains information about follow-up activities.
Determine whether this statement is true or false.
True
False
When performing an SAP S/4HANA conversion of the development system, when is the conversion of accounting data performed?
Choose the correct answer.
Before the beginning of downtime
Before starting the SUM
In the SUM roadmap step preprocessing
As part of the follow-on activities
Which of the following are candidates for modification adjustment?
Choose the correct answers.
Implemented SAP Notes
Implemented add-ons
Changes of SAP standard objects
Imported <SID>K0* transport requests
When performing an SAP S/4HANA Conversion, in which SAP system and in which client is the SPDD modification adjustment performed?
Choose the correct answer.
In the shadow system, in client 000
In the shadow system, in the development client
In the real system, in client 000
In the real system, in the development client
When performing an SAP S/4HANA Conversion, in which SAP system and in which client is the SPAU modification adjustment performed?
Choose the correct answer.
In the shadow system, in client 000
In the shadow system, in the development client
In the real system, in client 000
In the real system, in the development client
All SUM phases write log files to .../SUM/abap/tmp while they are running.
Determine whether this statement is true or false.
True
False
When performing a standard SAP S/4HANA Conversion with DMO, which step is performed in downtime?
Choose the correct answer.
Migration of the repository
Creation of the application data tables
Migration of the application data
creation of the repository tables
Which of the following is the longest downtime?
Choose the correct answer.
SUM technical downtime
Business downtime
Technical downtime
When performing an SAP S/4HANA Conversion with DMO, which factors influence the length of the technical downtime?
Choose the correct answers.
Size of source application data
Number of installed languages
Number of tables to be activated
Size of the source repository
Number of clients
In which scenarios can the nZDM technique be used in principle?
Choose the correct answers.
SAP S/4HANA Conversion without DMO
SAP S/4HANA Conversion with DMO
SAP S/4HANA Server upgrade
SAP ECC upgrade
SAP ECC upgrade with DMO
In which scenarios can the downtime optimized conversion technique be used in principle?
Choose the correct answers.
SAP S/4HANA Conversion without DMO
SAP ECC upgrade with DMO
SAP S/4HANA Conversion with DMO
DMO without software change
Why should you consider a double development and quality assurance system during an SAP S/4HANA Conversion project?
Choose the correct answer.
To test the SAP S/4HANA Conversion twice
To avoid a sandbox system during the SAP S/4HANA Conversion project
To handle emergency corrections after converting the actual development system
To perform own development projects in parallel to the SAP S/4HANA Conversion project
Which of the following is a SUM scenario?
Choose the correct answer.
New Implementation
Selective Data Transition
System Conversion
Which tool provides access to SAP Activate methodology implementation roadmaps?
Choose the correct answer.
Maintenance Planner
Landscape Management Database
Software Provisioning Manager
Roadmap Viewer
In which SAP system should new business functions be activated first?
Choose the correct answer.
In a sandbox system
In the development system
In the quality assurance system
In the production system
What is the general recommendation concerning the activation and transport of business functions?
Choose the correct answer.
Activate manually in the development and quality assurance systems, transport to production system
Activate manually in all systems
Activate manually in the development system, transport to quality assurance and production systems
Activate in the sandbox system, transport to development, quality assurance, and production systems
After an SAP S/4HANA Conversion, all business functions are delivered as activated.
Determine whether this statement is true or false.
True
False
Starting from which SAP_BASIS release must an SAP system run on the Unicode code page in any case?
Choose the correct answer.
750
740
752
754
What are the main areas you have to consider when performing a Unicode conversion?
Choose the correct answers.
Customizing
Own development
SAP standard objects
Interface adaptations
Technical conversion
which maintenance events are possible with SUM for an SAP system based on SAP ABAP 7.40 and above?
Homogeneous System Copy
Dual Stack Split
Release Upgrade
Database Migration
Support package stack update
The SUM store procedure stops with an error during uptime.
how can you identify the phase in which SUM encountered an error?
Note: There are 2 correct answers to this question.
check the most recent entries shown in file sapevt.trc
check the messages shown by the SUM UI.
check the system log (SM21) of the sap system
check the most recent entries in SAPup.log
during an SAP S/4 HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure using scenario strategy Standard?
Execution of SPDD modification adjusment
Creation of the table structures in the new SAP HANA DATABASE
Execution of XPRAS and AIMs
Execution of business validation tests
You are performing an SAP S/4 HANA conversion of the development system. Which credentials do you use, and in which system to perform the adjusment of programs and other non-dictionary repository objects(SPAU)?
credentials of a named user in client 000 of the shadow system
credentiasl of user DDIC in client 000 of the shadow system
credentials of user DDIC in the development client of the development system
credentials of a named user in the development client of the development system
in which part of an upgrade does SUM allow you to generate ABAP loads(SGEN)?
NOTE: there are 2 correct answers to this question.
during of the execution roadmap step
Post-downtime
During uptime
During SPDD
