Week 3 IMC projects.

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Choose two aspect's of a project

a)

Temporary

b)

Unique

c)

permanent

d)

None of these

2.

What is a component of business operations

a)

ongoing

b)

finite

c)

temporary

d)

None of these

3.

Which of the following is not part of operations management

a)

Repetitive

b)

stable teams

c)

Novel teams

d)

all of these

4.

What is the purpose of a project ?

a)
The purpose of a project is to achieve specific goals or objectives.
b)
To create a detailed report on past projects.
c)
To gather feedback from team members only.
d)
To increase the number of meetings held.
5.

Choose two characteristics of a project?

a)

Start

b)

continuum

c)

Finish

d)

maintenance

6.

Choose the item that is not part of the project triangle.

a)

Cost

b)

Time

c)

Quality

d)

Variation

7.

Who can declare if a project is a success

a)

Client

b)

End user

c)

Project manager

d)

All of these

8.

What is typically the priority for Clients in project completion.

a)

Cost control

b)

Time control

c)

Quality control

d)

Stakeholder management

9.

What does "fit for purpose" mean?

a)

Does the job it was intended to do.

b)

Acceptable to all stakeholders

c)

Cost effective

d)

Aesthetically acceptable

10.

What is an aspect that can affect project cost.

a)

Variation

b)

Inflation

c)

All of these

d)

Interest rates

11.

Who is the main party responsible for construction project safety?

a)

Contractor

b)

Subcontractor

c)
Safety Inspector
d)
Architect
12.

Who should be involved in ensuring an accurate scope?

a)

Contractor

b)

Client

c)

Designer

d)

All of these

13.

Who should be checking if the scope has omissions prior to tender?

a)

Subcontractor

b)

Project manager

c)

Labourer

d)

Scope officer

14.

Which subcontractor is not typically involved in bathroom renovations

a)

Plumber

b)

Electrician

c)

Tiler

d)

Scaffolder

15.

Choose all the ways that could reduce costs in kitchen renovation ?

a)

Reduce the quality of appliances

b)

Change a marble benchtop for a laminate benchtop

c)

Decrease the fitting's quality

d)

None of these