Why does the Commercial Team that you recommend looking at the roof plans before the specifications?
The specifications tend to be copied and pasted with contradictions
The roof plan is a more accurate version of the specific project
You can quickly determine the project size, slope, roof decking, assembly, and more
All of the above
What is the slope of this roof? (Click the magnifying glass to enlarge the photo.)
8/12
4/12
2/12
1/12
According to the wall section, what is the decking for this assembly? (Click the magnifying glass to enlarge the photo.)
Plywood
B-deck
B-deck with ISO
Open Framing
Which of the following statements about the pictured specifications is true? (Click the magnifying glass to enlarge the photo.)
There is no basis of design on this project
Englert Inc. is the basis of design; however, equal substitutions are considered
Englert Inc. is the basis of design and no substitutions are allowed
None of the above
What information can you find on the SMI Tech Stick? Select all that apply.
NTM rollforming machine manuals
Roof seamer rental agreement and information
Clip drawings and dimensions
Weathertight warranty samples, application, and quote request form
Engineering reports for profiles
Who submits the Weathertight Warranty Quote Request Form to the Technical Department?
The contractor installing the roof
The manufacturer supplying the panels
The SMI Account Manager
The architect who designed the building
When you're quoting a commercial job, where should you prepare/create a Quote in NetSuite?
From the Opportunity
From the Lead
From the Customer
None of the above
How many days past the Bid Date should you put the Expected Close Date on a NetSuite Opportunity?
4 days
7 days
10 days
14 days
To begin quoting a commercial project, what is the first thing you'll need to do?
Determine the basis of design on the project
Submit the roof plans and elevations for a take-off
Have the contractor submit a Weathertight Warranty Quote Request form
Review the Division 7 metal roofing specs
Once you receive the completed take-off, what information do you need to verify with your contractor before you can start a quote?
The architect information
The weathertight warranty length
Where the project is located
Their waste factor (%)
Using the Trim Calculator, what is the correct number of flat sheets needed for trim? (Click the magnifying glass to enlarge the photo.)
35
40
46
52
If a project has a total surface area of 14,750 square feet, how many rolls of underlayment will the contractor need?
25
30
38
43
Using the Engineering Cheat Sheet, what is the total number of clips and fasteners needed for a 9,000-square-foot roof using the 1.75" SnapLock over plywood and a panel width of 18"?
(Hint: Square feet does NOT equal linear feet.)
1,000 clips and 2,000 fasteners
3,000 clips and 6,000 fasteners
6,000 clips and 12,000 fasteners
7,500 clips and 15,000 fasteners
When in doubt regarding a commercial project, who should you contact?
Doug and/or Julianne
Someone else