NABCEP PVA Practice Exam Mash Up #1

Total questions: 70

Worksheet time: 35mins

Name
Class
Date
1.

An ammeter in combination with which other kind of meter could measure power?

a)

Ohmmeter

b)

Voltmeter

c)

Energy meter

d)

Pyranometer

2.

What is the first action to take when a ground fault is indicated by an inverter?

a)

Diagnose and fix the ground fault

b)

Close the dc disconnect

c)

Open the dc disconnect

d)

Disconnect the strings

3.

What is the most cost effective, yet sufficient method for marking for a PV label?

a)

Handwriting with permanent marker

b)

Engraving on a NEMA rated disconnect

c)

Permanent sticker

d)

Handwriting on permanent sticker indoors only

4.

What limits the maximum power rating of the largest load of an off-grid system?

a)

the size of the battery

b)

the size of the array

c)

the size of the inverter plus any other power source

d)

the size of the charge controller

5.

Where would you find information about SRECs and other solar incentives on a state-by-state basis?

a)

Solarabcs.org website

b)

IREC website

c)

NREL website

d)

DSIRE website

6.

What is the power of the array at STC?

There are 4 PV source circuits of 10 PV modules each.

Given: Module information: Power = 250W, Open Circuit Voltage = 40V,

Maximum Power Voltage = 35V, Short Circuit Current = 8A,

Maximum Power Current = 7.14A, Temp Coefficient for Voltage −0.33%/°C, CEC Power 220W,

NOCT 48°C Inverter information: Low MPPT voltage 230V, Inverter maximum input voltage 550V.

a)

10kW

b)

110kW

c)

1000W

d)

40kW

7.

Where do PV source circuits and PV output circuits meet?

a)

AC combiner

b)

PV array

c)

DC combiner

d)

Inverter MPP inputs

8.

If you are sizing a PV system on a building for a location with net-metering, what is the best way of the following to size the system?

a)

a. Multiply load factor by power factor by energy usage

b)

b. Size the system based on energy usage, budget and available space

c)

c. Size the system based on offsetting the entire electric bill always

d)

d. Size the system based on how much will fit on the roof

9.

Which device is used to determine that series wiring has been done correctly?

a)

Clamp on ammeter

b)

Digital multimeter

c)

Megger

d)

Pyranometer

10.

MPPT is for

a)

Optimizing energy from the utility

b)

Getting the most energy from a battery with a MPPT inverter

c)

Optimizing power from a PV array

d)

Tracking the sun with a 2-axis tracker

11.

Current carrying ability of a conductor (wire) is called

a)

Ampacity

b)

Amps

c)

Inductance

d)

Insolation

12.

Which addresses environmental hazards on a safety plan?

a)

SDS

b)

Fall protection

c)

Ladder safety

d)

Nearest hospital address

13.

What are the typical voltages in North American homes?

a)

110/208 Vac

b)

277/480 Vac

c)

100 Vac

d)

120/240 Vac

14.

What is the solar window?

a)

A place where the sun can be throughout the year, often defined as between 9am and 3pm.

b)

A transparent device used to determine sun paths

c)

The location in the sky where the sun will never be, such as north

d)

A window that faces south in the northern hemisphere or a window that faces north in the southern hemisphere.

15.

A PV system that would produce 7kWac under STC conditions, which is not clipping power, is installed in a location with an average of 6PSH (peak sun hours, aka kWh/square meter per day average) would produce how much energy in one year?

a)

14,008 kWh

b)

1,503 kWh

c)

3,307 kWh

d)

15,330 kWh

16.

Which of the following is the simplest type of PV system? 

a)

Utility interactive

b)

Stand-alone

c)

Self-regulating

d)

Direct-coupled

17.

What is specified on a charge controller?

a)

Irradiance limit

b)

Insolation limit

c)

Maximum voltage

d)

Minimum current

18.

 Direction on a compass is

a)

Latitude

b)

Longitude

c)

Meridian

d)

Azimuth

19.

Transformers convert

a)

High voltage low current to low voltage low current

b)

Low voltage low current to high voltage high current

c)

High voltage low current to low voltage high current

d)

Low current low current to high voltage low current

20.

You are rebuilding an old battery system for a PV museum and everything is in amps and amp hours. You are told that the system needs to have 33% more PV
production on average than what the loads require. The loads will require 20Ah per day and the insolation will be 5PSH. If the module current at STC is 8A at Imp
and 9A at Isc, how many PV source circuits would be needed to meet the minimum requirements stated here?

a)

1

b)

2

c)

3

d)

4

21.

 The longest shadow at 2PM would be on

a)

June 1st

b)

November 12th

c)

February 14th

d)

March 29th

22.

What is the main use of PV wire?

a)

Intermodule connections

b)

Inverter ac connections

c)

Must be used on grounded systems

d)

PV output circuits

23.

What instrument can best test the insulation resistance of a conductor?

a)

Insulometer

b)

Megohmmeter

c)

Digital multimeter

d)

Caloric wire tester

24.

How do you get a reading with a low current source and a clamp on ammeter?

a)

Turn the clamp in the other direction

b)

Press the probes harder against the terminals

c)

Turn the backlight off on your meter

d)

Loop the wire around and divide by the number of loops

25.

An arc is caused by higher

a)

Voltage

b)

Current

c)

Resistance

d)

Energy

26.

Who approves the interconnection of a PV system?

a)

Local contractor board

b)

State Public Utility Commission (PUC)

c)

Utility

d)

Authority Having Jurisprudence

27.

Which tilt angle from horizontal would get the best annual production from a location in Toronto at 43 degrees north?

a)

42 degrees

b)

58 degrees

c)

15 degrees

d)

20 degrees

28.

If an inverter indicates that there has been a ground fault, what is the first thing that a O&M technician should do?

a)

Close all the disconnects

b)

Open all the disconnects

c)

Turn on the system

d)

Replace the GFDI (ground fault detection and interruption) fuse

29.

Which room cannot have a PV dc disconnect?

a)

Kitchen

b)

Attic

c)

Bathroom

d)

Bedroom

30.

What is a primary factor(s) in performing wire sizing calculations?

a)

Strands and length

b)

UL listing

c)

Temperature and ampacity

d)

Color and code

31.

What would be the most practical way to add battery backup to an existing grid-tied system?

a)

Grid defection system

b)

Reinstalling the system

c)

Ac-coupled

d)

Dc-coupled

32.

Specification found in PV module installation manual

a)

Torque for mounting

b)

PTC

c)

Cleaning

d)

Max wind speed

33.

A PV array produces 10kWh in a day in a location with 5 peak sun hours and a nominal battery voltage of 24V. What is the minimum required wire ampacity of the following for the PV output circuit?

a)

15A

b)

150A

c)

300A

d)

400A

34.

How long do PV module manufacturers generally warranty their modules for?

a)

10 years for materials and 10 years for performance

b)

25 years for materials and 25 years for performance

c)

25 years for materials and 10 years for performance

d)

10 years for material and 25 years for performance

35.

How do you ensure module manufacturer warranty is not voided?

a)

Install according to UL listing test

b)

Follow manufacturer installation instructions

c)

Use local jurisdiction guidance

d)

Follow NEC recommendations

36.

What is the most likely maintenance to have to be done within the first 5 years of a PV installation?

a)

Replacing broken bypass diodes

b)

Washing the dust and pollen

c)

Replacing cracked glass on broken modules

d)

Removing pigeon and squirrel carcasses from under the array

37.

What is the most common maintenance of an array on a business's existing roof over the life of the system of the following

a)

Replacing MC connectors of PV modules

b)

Replacing bypass diodes

c)

Removal of system for re-roof of building

d)

Washing snail trails off of PV modules

38.

There is a system with 4 concrete pavers (weights) securing it on a rooftop. What kind of system is this?

a)

Ballast rack mount

b)

Ballast standoff

c)

East-west tilt mount

d)

Single axis-tracker

39.

In the image below of an IV curve, which point mostly represents the MPP on a hot day?

a)

A

b)

B

c)

C

d)

D

40.

What is the function of a current transformer?

a)

Measure current

b)

Measure volts

c)

Change current

d)

Change voltage

41.

Which of the following types of safety equipment will prevent a fall from a roof?

a)

Fall arrest

b)

Fall restraint

c)

Fall system

d)

Fall resistor

42.

Which of these are required parts of a personal fall arrest system?

a)

Lifeline, connector, eyewash, body harness

b)

Positioning device, rope, warning line

c)

Anchorage, lifeline, connector, body harness

d)

Deceleration device, connector, body belt

43.

Where should you direct a pyranometer to get the most accurate irradiance reading for your array?

a)

At the horizon

b)

Directly south

c)

In the plane of the array

d)

Away from shading

44.

An agreement in which a third party developer installs, owns, and operates a PV system on a customer’s property and the customer purchases the energy produced by the system at an agreed upon rate which is generally lower than the rate of the utility.

a)

Solar Lease

b)

Power Purchase Agreement

c)

Power Production Agreement

d)

Estimated Power Agreement

45.

Which of the following will show system components and connections?

a)

Electrical diagram

b)

Sunpath chart

c)

Module spec sheet

d)

IV curve chart

46.

Best sealant for residential rooftop?

a)

Bitumen

b)

Paraffin

c)

Polyurethane

d)

Silicone

47.

Which is the best order of steps to complete before removing equipment during

troubleshooting and maintenance.

a)

Replace fuses, open disconnects, isolate equipment

b)

Open ac and dc disconnects, check breakers, test voltages

c)

Open ac and dc disconnects, isolate equipment, test voltages

d)

Test voltages, check breakers, replace fuses

48.

What is the voltage drop given that volts = 12V, amps = 2A and resistance = 0.2

ohms?

a)

0.4V

b)

6V

c)

12V

d)

24V

49.

After it is determined that there is adequate space on the roof, what is the next

step?

a)

Shade analysis

b)

Connecting inter-module strings

c)

Sending proposal to customer

d)

Putting together a permit

50.

Of the following, which is worst for stand-alone lead-acid batteries?

a)

Undersized PV array

b)

Temperatures between 20C and 30C

c)

Fine stranded conductors

d)

Anti-islanding

51.

Of the following, which is the best benefit of a PV system for a homeowner?

a)

VAR support

b)

Demand response

c)

Self-consumption

d)

Backup power

52.

What would be most important to measure when comparing actual vs. expected

performance as part of commissioning a typical ground mounted PV system?

a)

Imp and Isc

b)

Isc and Voc

c)

Voc and Vsc

d)

Imp and Vmp

53.

What is the power at 20 amps and 380 volts?

a)

7600 kWh

b)

7.6 kW

c)

6 kW

d)

600 kW

54.

A dam is full of water and at the bottom of the dam it is deep and there is an outlet.

If the dam is not so full during a drought, the water will have less potential and this

is an analogy to less

a)

Current

b)

Voltage

c)

Power

d)

Energy

55.

There is a dam full of water and water is released from a pipe at the bottom of the

dam. The amount of water released per second is a hydraulic analogy for

a)

Current

b)

Voltage

c)

Resistance

d)

Energy

56.

If the inverter voltage is 240V (residential US inverter voltage) and the power is

4000W, then what is the smallest size circuit breaker you could use?

a)

15A

b)

20A

c)

25A

d)

30A

57.

Which is an example of a multiconductor cable and then a single conductor cable?

a)

USE-2 / RHW-2

b)

DG cable / PV wire

c)

THWN-2 NMC (Romex)

d)

MC cable / DG cable

58.

At what rate does the sun move in relationship to Earth (from the perspective of

someone being on Earth)?

a)

10 degrees per minute

b)

15 degrees per hour

c)

12 degrees per arc second

d)

36 degrees per hour

59.

Which of the following is an environmental exposure hazard plan?

a)

Rapid Shutdown

b)

Plansets

c)

SDS

d)

Hydration

60.

How many silicon solar cells in series is best for charging a 12V lead-acid battery

if you are not using a MPPT charge controller?

a)

20

b)

36

c)

60

d)

72

61.

Where do you find the requirements for clear rooftop spaces for firefighters?

a)

NFPA 70

b)

ASCE-7

c)

NFPA 855

d)

IRC

62.

Which of these would cause an interactive inverter to turn off for safety?

a)

Grid is out

b)

Clouds

c)

Warm temperature

d)

Higher PV to inverter ratio

63.

What is the proper slope of an extension ladder?

a)

1:3

b)

1:4

c)

1:5

d)

1:6

64.

Standard Testing Conditions (STC) temperature is:

a)

20C Ambient Temperature

b)

20C Cell Temperature

c)

25C Ambient Temperature

d)

25C Cell Temperature

65.

Undersized PV array (stand-alone)

a)

Decreases voltage drop

b)

Decreases battery life

c)

Increases current drop

d)

Increases resistance

66.

What is the NEC for?

a)

Practical safeguarding of electrical equipment

b)

Workplace safety for employees

c)

Safety for testing electrical equipment

d)

Practical safeguarding of persons and property

67.

A PV system that uses an interactive PV inverter and a battery inverter is called:

a)

Dc-coupled system

b)

Ac-coupled system

c)

Hybrid system

d)

Bimodal system

68.

A remote cabin uses the loads below per day, how much total energy is used per day? • 1000W toaster for 6 minutes • 1.2kW hot water heating element for 3 hours per day • Three 17W LED lights for 3 hours per day • iPhone 100 charger at 20W for 3 hours per day

a)

0.13cWh

b)

39kWh

c)

3.9kWh

d)

3900mWh

69.

When installing a ballasted PV system on a low slope roof, which is of greater concern to the AHJ?

a)

Shading

b)

Orientation of PV modules

c)

The touching of dissimilar metals

d)

Airflow under PV modules

70.

What is the main function of the Authority Having Jurisdiction?

a)

To check Code compliance

b)

To approve utility interconnections

c)

To ensure worker safety

d)

To make sure that the employer does not discriminate