Production and Inventory Management Quiz

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

Which of the following decisions helps a business determine the initial costs of a project?

a)

Product design

b)

Inventory planning

c)

Capacity planning

d)

Process design

2.

Among the factors affecting effective demand, which factor relates to standards, methods, and materials creating opportunities to enhance capacity?

a)

Operating factors

b)

Product and service factors

c)

Facility factors

d)

Supply chain factors

3.

Among decision-making tools, which tool helps a business determine the quantity to produce to achieve profit?

a)

Payback analysis

b)

Decision tree

c)

Break-even analysis

d)

Inventory analysis

4.

The process of inspecting product quality and acceptability belongs to which activity in production control?

a)

Dispatching

b)

Follow-up

c)

Inspection

d)

Corrective control

5.

Which factor helps increase reliability, speed, and reduce costs in production?

a)

Longest operating time

b)

Customer prioritization

c)

Delivery date

d)

Johnson's Rule

6.

Which answer correctly describes the concept of dependent demand?

a)

Produced only when required

b)

Unpredictable due to customers

c)

Predictable due to identifiable factors

d)

Limited at specific work centers

7.

How is capacity planning defined?

a)

A fixed volume of value-adding activity

b)

Decision-making when demand fluctuates

c)

The maximum output level that can be achieved

d)

The overall size of capacity, such as factory area

8.

Which activity helps allocate work to the correct work center according to available capacity?

a)

Scheduling

b)

Job sequencing

c)

Finite loading

d)

Monitoring and control

9.

When a production manager starts work as soon as a load is available, what type of scheduling is it?

a)

Forward scheduling

b)

Gantt chart

c)

Cyclic scheduling

d)

Backward scheduling

10.

In production control, which activity initiates production jobs according to the plan?

a)

Inspection

b)

Dispatching

c)

Sequencing

d)

Scheduling

11.

Johnson's Rule is applied for:

a)

Job prioritization

b)

Workload allocation

c)

Sequencing jobs through two work centers

d)

Load limiting costs are too high

12.

Among inventory types, which one helps cope with uncertainty in supply?

a)

Anticipation inventory

b)

Pipeline inventory

c)

Buffer inventory

d)

Cycle inventory

13.

Among the factors affecting effective demand, which factor relates to decisions on adjusting schedules?

a)

Operating factors

b)

Facility factors

c)

Policy factors

d)

Human factors

14.

Dependent demand is characterized by what?

a)

Unpredictable due to customers

b)

Raw materials purchased only when needed

c)

Predictable

d)

Limited by work center

15.

Which type of inventory is maintained to cope with large and predictable demand fluctuations?

a)

De-coupling inventory

b)

Pipeline inventory

c)

Anticipation inventory

d)

Cycle inventory

16.

In production management, which activity is implemented to restore resources in case of a breakdown?

a)

Corrective control

b)

Inspection

c)

Follow-up

d)

Dispatching

17.

When it is necessary to determine the number of employees required to complete a job at a specific time, which type of scheduling is used?

a)

Cyclic scheduling

b)

Gantt chart

c)

Rostering

d)

Forward scheduling

18.

Which action correctly describes 'Infinite loading'?

a)

Prioritizing

b)

Sequencing through two work centers

c)

Workload allocation

d)

Unlimited load volume

19.

What is the actual capacity after deducting losses called?

a)

Design capacity

b)

Excess capacity

c)

Effective capacity

d)

Actual capacity

20.

Which factor affects effective demand due to changes in suppliers, warehousing, and transportation?

a)

Operating factors

b)

Policy factors

c)

Supply chain factors

d)

External factors

21.

Which factor improves responsiveness to customer demand by increasing inventory?

a)

Flexibility

b)

Speed

c)

Reliability

d)

Quality

22.

Which statement is true about the role of production control?

a)

Determine market demand

b)

Only control processes at the factory

c)

Implement production plans according to schedule and coordinate with departments

d)

Purchase raw materials only when needed

23.

In scheduling activities, which type of inventory helps to separate stages in the production process?

a)

De-coupling inventory

b)

Cycle inventory

c)

Safety stock

d)

Linear inventory

24.

When does a manager need to plan for medium-term capacity?

a)

When setting long-term goals

b)

When needing to adjust workload for a few months

c)

When resources are not fully utilized

d)

When there are only daily changes

25.

Which factor relates to decisions about purchasing, warehousing, and late delivery?

a)

Process factors

b)

Operating factors

c)

Supply chain factors

d)

Service factors

26.

Which scheduling uses visual charts for job progress?

a)

Rostering

b)

Gantt chart

c)

Forward scheduling

d)

Backward scheduling

27.

Which statement is true for 'Capacity Planning and Control'?

a)

Factory area size

b)

Decisions in response to fluctuations

c)

Maximum achievable capacity

d)

Fixed volume per cycle

28.

When production activities begin as soon as resources are available, what action is this?

a)

Follow-up

b)

Dispatching

c)

Inspection

d)

Scheduling

29.

In an infinite loading system, why is the load volume not limited?

a)

For easy dispatching

b)

Because load limiting costs are too high

c)

Due to system limitations

d)

To ensure flexibility

30.

In scheduling, which physical factor hinders progress while waiting for the previous stage to complete?

a)

Customer prioritization

b)

Shortest time

c)

Physical constraint

d)

Longest time

31.

What term describes the maximum output a system can produce under ideal conditions?

a)

Effective capacity

b)

Design capacity

c)

Actual output

d)

Output rate

32.

The time from start to finish of a process, including waiting time, is called what?

a)

Lead time

b)

Processing time

c)

Completion time

d)

Idle time

33.

What is the main purpose of break-even analysis?

a)

Determine the point where revenue equals total costs

b)

Forecast customer demand

c)

Evaluate supplier performance

d)

Calculate reorder point

34.

What is the formula for calculating efficiency?

a)

Actual Output / Design Capacity

b)

Actual Output / Effective Capacity

c)

Effective Capacity / Design Capacity

d)

Design Capacity / Actual Output

35.

Which of the following is NOT a function of inventory?

a)

Meet customer demand

b)

Smooth production

c)

Increase processing time

d)

Reduce dependence between stages

36.

Which type of inventory is held to deal with uncertainty in supply and demand?

a)

Forecast inventory

b)

Cycle inventory

c)

Buffer inventory

d)

Safety stock

37.

Which scheduling rule prioritizes jobs with the shortest processing time first?

a)

FCFS

b)

EDD

c)

SPT

d)

LPT

38.

Which type of cost represents the cost of storing products?

a)

Ordering cost

b)

Setup cost

c)

Holding cost

d)

Stockout cost

39.

What is the consequence of increasing the order quantity in EOQ?

a)

Increase in number of orders

b)

Decrease in holding cost

c)

Decrease in order frequency

d)

Increase in stockout risk

40.

Which of the following is a qualitative forecasting method?

a)

Moving average

b)

Exponential smoothing

c)

Linear regression

d)

Delphi method

41.

What is work that has been completed but not yet moved to the next stage called?

a)

Queue

b)

Buffer

c)

Work-in-process

d)

Output

42.

Johnson's Rule is applied to how many machines?

a)

One machine

b)

Two machines

c)

Three machines

d)

Any number of machines

43.

What is the determination of start and end times for jobs called?

a)

Sequencing

b)

Loading

c)

Scheduling

d)

Routing

44.

What does a Gantt chart show?

a)

Statistical limits

b)

Progress of activities over time

c)

Financial profit

d)

Delivery time

45.

Which type of cost belongs to holding costs?

a)

Ordering cost

b)

Transportation cost

c)

Capital tied up cost

d)

Warehouse rental cost

46.

What is the main objective of capacity planning?

a)

Reduce maintenance costs

b)

Reduce turnover rate

c)

Effectively meet future demand

d)

Eliminate defective products

47.

Which production system is suitable for high-volume, standardized products?

a)

Job shop

b)

Batch production

c)

Intermittent production

d)

Continuous production

48.

Which method assumes that a work center has unlimited capacity?

a)

Finite loading

b)

Infinite loading

c)

Routing

d)

Dispatching

49.

What are the consequences of ineffective scheduling?

a)

Increased inventory

b)

Delayed progress

c)

Decreased productivity

d)

All of the above

50.

Which of the following helps reduce EOQ?

a)

Increase demand

b)

Increase setup cost

c)

Increase holding cost

d)

Decrease setup cost