wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

TSAC-F Organization and Administration

Total questions: 80

Worksheet time: 40mins

Name
Class
Date
1.

What item is not generally included in the emergency response procedures for a fitness facility? P580-581

a)


Blueprint of strength and conditioning facility

b)

Location of emergency supplies

c)

Location of key personnel within the facility

2.

Which of the following features is more likely to be found in a large-footprint special operations training facility than in a small-footprint facility? P569

a)


Cardio and energy system development

b)

Performance laboratory

c)

Classroom

3.

How much total space is needed for an 8' x 8' Olympic lifting platform? P574

a)

64 sq ft

b)

144 sq ft

c)

120 sq ft

4.

You are a new strength and conditioning business owner who is considering building a new facility versus purchasing and renovating an existing facility. Which of the following is a difference between starting a new strength and conditioning facility and renovating an existing facility? P564-566

a)


There is only a design phase when building a new facility

b)

There may be no construction phase

c)

There is no arranging of equipment when renovating

5.

Which of the following is not one of the four critical tasks in the predesign phase of building a new fitness facility? P564

a)


Feasibility study

b)

Selection of architectural firm

c)

Needs analysis

d)

Training facility secondary plan

6.

What is the minimum recommended distance that should be maintained between bar ends or dumbbells in a free weight area to ensure safety and movement clearance? P574

a)

Two feet

b)

Four feet

c)

Five feet

d)

Three feet

7.

Standards for military physical fitness centers are established by which of the following? P

a)


U.S. Department of Defense

b)

U.S. Department of Health and Human Services

c)

National Strength and Conditioning Association

8.

Which of the following is not a part of the architectural blueprint developed during the design phase of a training facility? P565

a)


Life safety plan

b)

Equipment maintenance schedule

c)

Fire suppression layout

9.

For emergency procedures, what is the first step in a non-life-threatening situation? P580

a)


Contact the athletic medicine department

b)

Call 911

c)

Start CPR

10.

Which of the following is not typically addressed in a needs analysis during the predesign phase of training facility planning? P564

a)


Who will be responsible for life-cycle replacement and maintenance?

b)

What is the square footage of each training zone?

c)

What is the mission of the training facility?

11.

Which of the following equipment maintenance tasks is typically recommended to be performed once per year? P584

a)

Tighten floor bolts

b)

Replace worn upholstery

c)


Calibrate digital monitors

12.

All the following are facility emergency response policies and procedures except: P580

a)

Clearly marked locations of first aid kits and AEDs

b)

SOPs that provide detailed instructions for each type of emergency

c)


Routine equipment maintenance schedule

d)

Key facility personnel directory

13.

Which type of flooring would not be ideal for a strength training facility at a fire station? P573

a)

Carpet

b)

Concrete flooring

c)

Rubberized flooring

14.

In which phase of building a new strength and conditioning facility would a needs analysis be required? P564-566

a)

Preoperation phase

b)

Design phase

c)

Predesign phase

15.

Which of the following is not one of the common topics covered in facility SOPs? P579

a)

Front desk staff phone numbers

b)

Facility floor plan

c)

Facility hours

d)

Visitor procedures

16.

According to the NSCA Safety Checklist for Exercise Facility and Equipment Maintenance, how often should you clean and lubricate aerobic machines and the guide rods on selectorized resistance training machines? 586

a)

Once per week

b)

2-3 times per week

c)

Twice per month

d)

Once per month

17.

What is the correct sequence of phases for constructing, remodeling, or adapting a training facility? P564

a)


Predesign, design, construction, preoperation 

b)

Design, construction, preoperation, predesign

c)

Preoperation, predesign, construction, design

d)

Construction, preoperation, predesign, design

18.

What is the minimum recommended space between the ends of racks to provide room for spotters? P574

a)

2 feet

b)

4 feet

c)

3 feet

d)

5 feet

19.

Which of the following is not a primary consideration when selecting an architectural firm during the predesign phase of a training facility? P565

a)


Experience designing similar training facilities

b)

Projected cost and timeline estimates

c)

Familiarity with local zoning and tax codes

20.

According to Department of Defense (DoD) guidelines, what is the minimum number of hours per week that a military fitness center should be open to serve its members? P567

a)


90 hours per week

b)

70 hours per week

c)

80 hours per week

21.

According to the U.S. Department of Defense (DoD) core standards, which of the following combinations of certifications are required for all military training facility staff? P567

a)


CPR, AED, and First Aid

b)

CPR, AED, and Basic Life Support

c)

AED, First Aid, and Bloodborne Pathogen

22.

Which is not a responsibility of the facility supervisor? P575-582

a)


Maintain, check, and clean the facility and its equipment

b)

Monitor equipment checkout

c)

Prepare workout sheets for assigned sports

23.

A trainer is evaluating a newly admitted athlete on a specialized training program. The athlete tells the coach that they recently suffered a significant shoulder injury. Which of the following options would not be an appropriate next step?  P451-452

a)

Evaluate his shoulder's condition

b)


Provide resistance training programs for injury prevention

c)

Evaluate performance tests

24.

Which statement is true of a strength and conditioning facility's layout? P574-575

a)


Walkways within the facility should be a minimum of 36 inches wide

b)

There should be a minimum perimeter of 24 inches between resistance training machines

c)

Walkways within the facility should be a minimum of 45 inches wide

25.

Which of the following is the minimum recommended space to be maintained around self-contained power areas in a training facility? P574

a)

Four feet

b)

Two feet

c)

five feet

d)

Three feet

26.

Which of the following best describes a key responsibility during the construction phase of a training facility project? P566

a)

Reviewing and revising the facility's operating budget

b)

Selecting new strength and conditioning equipment vendors

c)

Holding regular meetings with the architectural and construction teams to ensure alignment with the master plan

27.

Which of the following would most likely not be included in a facility’s Standard Operating Procedures (SOPs)? P579

a)


Periodized program templates for tactical athlete training

b)

Procedures for equipment storage and maintenance

c)

Protocols for user check-in and log-in procedures

28.

For which of the following is it important to ensure that all facility staff members are covered? P579

a)


Accident reimbursement and risk indemnity

b)

Liability and indemnification

c)

General liability and legal training

29.

Which of the following does not need to be included when submitting an injury report for a training facility incident? P581

a)

Name and contact information of any witnesses

b)

Time and date of the incident

c)

Name and contact of emergency medical responders

30.

Which of the following is not one of the four critical tasks in the predesign phase of facility development? P564

a)

Needs analysis

b)

Equipment purchasing

c)

Feasibility study

31.

What is the minimum recommended clearance around self-contained power areas?

a)

Five feet

b)

Two feet

c)

One foot

d)

Three feet

32.

Which of the following phases focuses on staff recruitment and staff training? P566

a)


Construction phase

b)

Preoperation phase

c)

Design phase

d)

Predesign phase

33.

Which of the following lists the correct order of the phases involved in building, renovating, or repurposing a training facility? P565

a)

Construction, Preoperation, Predesign, Design

b)

Preoperation, Predesign, Construction, Design

c)

Predesign, Design, Construction, Preoperation

34.

What is the minimum recommended space for a designated warm-up, cool-down, or stretching area in a training facility? P575

a)

25 sq ft

b)

49 sq ft

c)

144 sq ft

d)

100 sq ft

35.

It is recommended for all tactical athlete trainers to purchase personal liability and indemnification insurance to protect against injury and wrongful death lawsuits. What does the aggregate limit refer to? P580

a)


The maximum amount paid for a single claim

b)

The total number of claims allowed within a policy period

c)

Maximum dollar amount the insurer will pay to settle a claim within a given time period

d)

The deductible amount the policyholder must pay before coverage starts

36.

During which phase of training facility development are standard operating procedures (SOPs) reviewed and revised? P566

a)


Predesign Phase

b)

Preoperation Phase

c)

Design Phase

37.

Which of the following is not typically necessary before being allowed to train at a strength and conditioning facility? P582-583

a)


Have at least one year of training experience

b)

Go through a pre-activity screening with a qualified medical professional

c)

Attend an orientation on common risks involved in training activities

38.

Which of the following is not a question that should be answered during the needs analysis? P564

a)


What category of tactical athlete will use the training facility?

b)

What is the number of tactical athletes that the facility can accommodate per training session?

c)

What is the annual revenue target for the training facility?

d)

What is the mission of the training facility?

39.

What is the primary purpose of conducting a SWOT analysis during the planning phase of a tactical training facility? P565

a)


To estimate the construction timeline and assign staff responsibilities

b)

To calculate projected equipment usage and maintenance costs

c)

To identify internal strengths and weaknesses, as well as external opportunities and threats

40.

According to the NSCA Safety Checklist for Exercise Facility and Equipment Maintenance, what is the optimal distance between aerobic machines? P585

a)

2 feet

b)

1 foot

c)

3 feet

d)

4 feet

41.

Which of the following factors will not influence what is included in the equipment priority list for a tactical training facility? P570

a)

Needs analysis

b)

Preferred equipment brand

c)

Expansion plan

42.

Which of the following best describes the purpose of a training facility’s master plan? P565

a)


To outline the safety procedures and emergency response protocols for the facility

b)

To capture the project goals and identify the processes used to achieve them

c)

To estimate the total cost of construction and annual operational expenses

43.

Which of the following should be offered to all new members to help determine their level of risk before beginning a training program? P582

a)

Preactivity screening

b)

Orientation session

c)

Equipment demonstration

44.

How long does the design phase typically last when developing a new training facility? P565`

a)

1 to 3 months

b)

6 to 12 months

c)

3 to 6 months

45.

How many facility rule offenses does it take for an athlete to be dismissed from the facility for the remainder of the year? P587-592

a)

Fice

b)

Four

c)

Three

d)

Two

46.

Which of the following factors is typically evaluated during the feasibility study phase of a new training facility? P565

a)


Equipment brand preferences

b)

Interior design themes

c)

Projected usage and operating hours

47.

Which is not a responsibility of the facility supervisor? 564

a)


Maintain, check, and clean the facility and its equipment

b)

Teach proper resistance training exercise technique and assist in spotting when necessary

c)

Check whether first aid kit is stocked with necessary supplies

48.

A trainer is building a new strength and conditioning facility and begins hiring staff to run the business. In which phase of planning would this most likely occur? P564-566

a)


Construction phase

b)

Preoperation phase

c)

Predesign phase

49.

Which governing body establishes the standards for military physical fitness centers? P577

a)


U.S. Department of Defense

b)

U.S. Air Force services facilities design guide

c)

U.S. Air Force Special Operations Command

d)

ACSM standards for facility design

50.

During the predesign phase, when is a SWOT analysis performed? P565

a)


When creating the training facility master plan

b)

When performing a needs analysis

c)

When completing a feasibility study

d)

When selecting an architectural plan

51.

Designing a plan that details project goals and the procedures for meeting those goals is structured within which phase of planning a new strength and conditioning facility? P564-565

a)


Preoperation phase

b)

Design phase

c)

Predesign phase

52.

What is the minimum distance that resistance training machines should be set apart from each other? P574

a)

48 inches

b)

26 inches

c)

24 inches

d)

12 inches

53.

According to NSCA guidelines, what is the recommended service area in square feet that should be dedicated to squatting? P574

a)


150 to 170 square feet

b)

90 to 110 square feet

c)

130 to 150 square feet

d)

110 to 130 square feet

54.

Which item is a responsibility of the head strength and conditioning professional? P575-582

a)


Develop and submit annual budget 

b)

Prepare workout sheets for assigned sports

c)

Assist in training student assistants 

55.

When building or renovating a strength and conditioning facility, which phase is the longest? P564-566

a)


Construction phase

b)

Design phase

c)

Pre-operation phase

56.

After how many rule offenses does an athlete receive dismissal from the facility for one week? P575-582

a)

Four

b)

Five

c)

Three

d)

Two

57.

Which of the following is the outcome of a detailed architectural blueprint of the fitness facility?  P567

a)


Construction phase

b)

Preoperation phase

c)

Design phase

d)

Predesign phase

58.

Who is responsible for developing, presenting, and enforcing the written policies and procedures of the staff and participants in a strength and conditioning program? P575-578

a)


Head strength and conditioning professional

b)

Facility supervisor 

c)

Assistant strength and conditioning professional

59.

What is a legal responsibility, duty, or obligation called? P579-583

a)

Liability

b)

Standard of care

c)

Negligence

60.

The development of the master plan during the predesign phase of building a new fitness facility is based on all the following except: P565

a)


Feasibility study

b)

Needs analysis

c)

SWOT analysis

d)

Selection of an architectural firm

61.

How much room should be allotted for an individual stretching/warm-up/cool-down area? P575

a)

80 sq ft

b)

36 sq ft

c)

49 sq ft

d)

100 sq ft

62.

How far off the ground should mirrors be in a weight room? P573

a)

20 inches

b)

12 inches

c)

18 inches

d)

36 inches

63.

All the following are part of the design phase of a new fitness facility except: P565

a)

Site map

b)

Life safety plan

c)

Plumbing

d)

Operating hours

64.

Which of the following is not an element of negligence? P575-582

a)

Standard of care

b)

Duty

c)

Proximate cause

65.

What is the ideal temperature range in a strength and conditioning facility? P582-587

a)

72-78 degrees Fahrenheit

b)

66-72 degrees Fahrenheit

c)

60-65 degrees Fahrenheit 

66.

A strength and conditioning coach is constructing a new facility and must abide by specific rules and regulations. What is the minimum width for walkways in a strength and conditioning facility? P575

a)

40 inches

b)

55 inches

c)

36 inches

d)

24 inches

67.

How many strength and conditioning staff members should be present during a resistance training session for a college team that has 12 players on the team? P149-150

a)

Three

b)

One

c)

Two

d)

Four

68.

What does SWOT stand for in relation to a SWOT analysis? P565

a)


Strengths, Weaknesses, Opportunities, Tactics

b)

Systems, Workflows, Objectives, Techniques

c)

Strengths, Weaknesses, Opportunities, Threats

d)

Strategies, Wins, Obstacles, Threats

69.

Which of the following is not one of the four principles of composite risk management? P588

a)


Make decisions at the appropriate management level

b)

Accept no unnecessary risk

c)

Accept risk when benefits outweigh costs

d)

Integrate risk management into planning and training at the managerial level

70.

Which of the following is not a facility rule or guideline? P587-592

a)


All athletes must go through an orientation meeting to understand risks involved

b)

If back squats are performed outside the power rack, two spotters are necessary

c)

Staff offices and phones are off-limits to athletes unless given permission to use them

71.

When creating the mission statement for your strength and conditioning organization, what should be avoided? P573-577

a)


Making it short and sharply focused

b)

Defining why we do what we do and why the organization even exists

c)

Making it as detailed as possible about the means of getting to specific goals

72.

Which of the following options would be the least likely concern for a strength and conditioning professional when assessing the athletic program needs of a male basketball team? P575-582

a)


What type of training are the athletes going to perform?

b)

Will there be female and male athletes training at the same time?

c)

How many athletes will use the facility?

73.

All the following are standard guidelines for placing equipment in a fitness facility except: P574

a)


Dumbbell racks can be used to divide activity areas

b)

Place racks near the entrance

c)

Tall strength training machines should be placed along the wall

d)

Bench press requires an area of 90 to 110 square feet

74.

Which of the following is a responsibility of the assistant strength and conditioning coach? P149-150

a)


Develop staff work and supervision schedules, assign duties, and evaluate performance

b)

Teach proper resistance training exercise technique and assist in spotting when necessary

c)

Assist with on-campus recruiting activities for prospective student athletes

75.

Jason is ordering equipment for his new training gym. He is in the process of organizing the layout. Where should squat racks be placed in a strength and conditioning facility? P574

a)


Middle of the floor space

b)

Next to the pulley machines

c)

Along the walls

76.

What is the minimum recommended distance between resistance training equipment and facility mirrors? P74

a)

12 inches

b)

18 inches

c)

9 inches

d)

6 inches

77.

What is known as the participation with the knowledge of the inherent risks of a strength and conditioning program? P583

a)

Assumption of risk

b)

Liability

c)

Negligence

78.

According to NSCA guidelines, what is the minimum distance between mirrors and equipment? P574

a)

12 inches

b)

3 inches

c)

6 inches

d)

9 inches

79.

How many strength and conditioning staff members are needed to watch over the training of 20 high school basketball players? P149-150

a)

i coach

b)

4 coaches

c)

2 coaches

d)

3 coaches

80.

Which of the following questions is not relevant during the needs analysis phase? P564

a)


How will the training facility minimize its environmental impact?

b)

Who is responsible for operational control, life-cycle replacement, and maintenance of the facility?

c)

What is the proximity of the training facility to the user?

d)

What programs will be conducted in the training facility?