In environmental engineering, WACS stands for ___________.
Waste Assessment and Characterization Study
Waste Analysis and Characterization Study
Waste Assessment and Classification Study
Waste Analysis and Classification Study
WACS is conducted to ________ and ________ the amount of municipal solid waste generated.
characterize, quantify
collect, analyze
review, quantify
sort, qualify
In environmental engineering, ESA stands for ________.
Evaluation Site Assessment
Environment and Safety Assessment
Environmental Site Assessment
Environment and Safety Analysis
The four general waste categories based on WACS Manual of the National Solid Waste Management Commission (NSWMC) are:
Biodegradable, Plastics, Residuals, Special
Biodegradable, Non-Biodegradable, Special, Hazardous
Biodegradable, Recyclables, Non-Biodegradable, Hazardous
Biodegradable, Recyclables, Residuals, Special
In Philippine laws, Republic Act No. 9003 is also known as ________.
Ecological Solid Waste Management Act of 2000
Municipal Solid Waste Management Act of 2000
Environmental Solid Waste Management Act of 2000
Environmental Municipal Solid Waste Management Act of 2000
Which of the following tool is used to estimate the amount of solid waste that leaks into the nature and oceans from various sources across the solid waste management system?
Material Flow Analysis
Waste Analysis Tool
Waste Flow Diagram
Life Cycle Assessment
Eggshells are categorized under which waste classification?
Special Waste
Residual Waste
Recyclables
Biodegradable Waste
Which of the following is not typically classified as disaster waste generated immediately after a major disaster (e.g., earthquakes, typhoons)?
Debris from collapsed structures
Waste from relief operations
Human corpses from collapsed structures
Uprooted trees, branches, and other green waste
A river sample shows the following partial results:
Dissolved Oxygen = 6 mg/L (AA to C)
Biochemical Oxygen Demand = 4 mg/L (B)
pH = 7.2 (AA to D)
Based on DENR DAO water quality standards, which classification is the most likely for the river?
Class AA
Class B
Class C
Class D
True or False: An Environmental Impact Statement (EIS) is always required for any project, regardless of its size, location, or potential impact.
True - because all projects must undergo a full EIS under Philippine law
True - because EIS is the first step before any project feasibility study
False - because an EIS is required only for Environmental Critical Projects (ECPs) or projects in Environmentally Critical Areas (ECAs).
False - because only government projects require an EIS