wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

NCCER Electrical 1 Module 26101 Worksheet

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Phases of residential electrical wiring include ________.

a)

Planning, rough-in, finish, and testing

b)

Only installation

c)

Only testing

d)

Only planning

2.

True or False? A major difference between residential and commercial wiring is that commercial wiring is usually installed in metal conduit.

a)

True

b)

False

3.

Industrial electricians are usually split into two groups: __________ and __________.

a)

Maintenance and Construction

b)

Residential and Commercial

c)

Planning and Testing

d)

Supervisors and Apprentices

4.

Your apprenticeship program requires _________ hours of OJL per year.

a)

500

b)

1,000

c)

2,000

d)

4,000

5.

True or False? Competency-based training means that you must demonstrate the skills necessary to perform hands-on tasks before advancing to the next stage of the curriculum.

a)

True

b)

False

6.

A _________ allows you to complete as much as two years of your apprenticeship before you have finished high school.

a)

Pre-apprenticeship program

b)

Internship

c)

Job shadowing

d)

Summer camp

7.

True or False? It’s okay to take scrap pieces home as long as you don’t think they’ll be needed on the job.

a)

True

b)

False

8.

Many employees feel that sick days can be treated as floating holidays to be taken whenever they would like a day off. How is this unfair to an employer or co-workers?

a)

It can leave the team short-staffed unexpectedly

b)

It increases productivity

c)

It helps with scheduling

d)

It is always allowed

9.

True or False? OSHA requires that employers provide a safe and hazard-free job site.

a)

True

b)

False

10.

In addition to the OSHA safety standards, name two other standards that relate to electrical systems and devices.

a)

NEC and NFPA

b)

FDA and EPA

c)

DOT and FAA

d)

CDC and WHO

11.

Which phase of residential electrical wiring involves installing outlets, switches, and fixtures?

a)

Planning

b)

Rough-in

c)

Finish

d)

Testing

12.

What is the main purpose of the rough-in phase in residential wiring?

a)

Installing wires and boxes before walls are finished

b)

Painting the walls

c)

Testing the system

d)

Installing appliances

13.

Which group of electricians is responsible for keeping equipment running and fixing breakdowns?

a)

Maintenance electricians

b)

Construction electricians

c)

Supervisors

d)

Apprentices

14.

Which of the following is NOT a phase of residential electrical wiring?

a)

Planning

b)

Rough-in

c)

Finish

d)

Painting

15.

Which standard is commonly used for electrical installations in the United States?

a)

NEC

b)

FDA

c)

EPA

d)

DOT

16.

What does OJL stand for in apprenticeship programs?

a)

On-the-Job Learning

b)

Offsite Job Location

c)

Occupational Job License

d)

Official Job List

17.

Which organization sets safety standards for workplaces in the United States?

a)

OSHA

b)

FDA

c)

EPA

d)

CDC

18.

True or False? The National Electrical Code (NEC) is a standard for safe electrical installation.

a)

True

b)

False

19.

Which of the following is a benefit of competency-based training?

a)

Students advance after demonstrating skills

b)

Students advance only by passing written tests

c)

Students never advance

d)

Students advance by seniority

20.

Which phase of residential electrical wiring is performed last?

a)

Planning

b)

Rough-in

c)

Finish

d)

Testing