wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

MTL2 Hot Water Learner Outcome 2

Total questions: 14

Worksheet time: 7mins

Name
Class
Date
1.

Building Regulations Approved Document G mainly covers:

a)

Gas pipe sizing

b)

Hot water safety and water efficiency

c)

Electrical installations

d)

Roof drainage

2.

The Gas (Installation and Use) Regulations apply to:

a)

Plastic pipework

b)

Gas-fired hot water appliances

c)

Cold water systems

d)

Roof venting

3.

What do the IET Wiring Regulations (BS7671) cover?

a)

Boiler flue locations

b)

Electrical safety for hot water and heating systems

c)

Water pressure control

d)

Pipe insulation

4.

What does BS EN 806 Part 1 relate to?

a)

Gas use

b)

Plumbing exams

c)

General requirements for water installations

d)

Cylinder storage

5.

What does BS EN 806 Part 3 describe?

a)

Pipe support types

b)

Pipe sizing methods

c)

Boiler maintenance

d)

Gas safety checks

6.

What is the purpose of BS 8558:2015?

a)

To design bathrooms

b)

To guide water system design, installation and testing

c)

To inspect roofs

d)

To replace gas regulations

7.

What document gives guidance on flushing and disinfection?

a)

BS EN 806 Part 4

b)

BS 8558

c)

PD 855468:2015

d)

Building Reg Part L

8.

Why should manufacturer’s instructions always be followed?

a)

They save time

b)

To avoid reading regulations

c)

They ensure safe, compliant installation

d)

They are optional advice

9.

If manufacturer’s instructions are ignored, what might happen?

a)

Water pressure increases

b)

Warranty may be void

c)

Flow rate improves

d)

Temperature rises

10.

Before work begins, what should be done to protect customer property?

a)

Ignore it

b)

Use bare floors

c)

Use dust sheets and covers

d)

Paint surfaces

11.

What type of valve should be used to isolate cold water before a cistern?

a)

Drain valve

b)

Stopcock only

c)

Service valve

d)

Check valve

12.

What size pipework is typical for small domestic hot water systems?

a)

10 mm

b)

15–28 mm

c)

32 mm only

d)

50 mm only

13.

What tools are commonly used when working on hot water systems?

a)

Wood saw

b)

Pipe cutter and adjustable spanner

c)

Hammer and nails

d)

Paint brush

14.

Why is it important to protect floors and furniture before work?

a)

To make cleanup easier

b)

To prevent property damage and maintain professionalism

c)

To hide dirt

d)

It’s not important