What does decommissioning mean?

a)

Installing new pipework

b)

Cleaning taps

c)

Taking a system out of use

d)

Adding more pressure

2.

Why might a system be temporarily decommissioned?

a)

To save energy

b)

For maintenance or repair

c)

For decoration

d)

To add new pipework only

3.

Before any decommissioning, you must first:

a)

Paint the area

b)

Inform the customer or other people on site

c)

Remove tools

d)

Take photos

4.

What must be done to electrical components before work starts?

a)

Turn them on

b)

Test voltage

c)

Isolate the electrical supply

d)

Cover them in water

5.

What is a good way to reduce isolation time for the customer?

a)

Work slower

b)

Prepare all materials before shutting off water

c)

Keep valves open

d)

Turn off all systems early

6.

Why should customers store some water before isolation?

a)

To water plants

b)

So they have drinking and washing water available

c)

To fill the cistern

d)

To test flow rate

7.

What should be placed on the stop tap or valve when isolating?

a)

Price tag

b)

Tape

c)

Warning notice – 'Do not turn on'

d)

String

8.

During temporary decommissioning, what happens to the water?

a)

It’s heated

b)

It’s drained from the part being worked on

c)

It’s coloured

d)

It’s reused

9.

What’s the first step in permanent decommissioning?

a)

Refill the system

b)

Isolate the main water supply

c)

Install a pump

d)

Turn on immersion heater

10.

When permanently removing pipework, you should:

a)

Leave pipes open

b)

Reconnect to taps

c)

Cap off at the nearest live connection

d)

Bend the ends over

11.

Why should pipes be capped after removal?

a)

To hold pressure

b)

To prevent stagnation or contamination

c)

To make them look tidy

d)

To support new pipes

12.

After draining a cylinder, what should you do next?

a)

Leave it full

b)

Reconnect mains supply

c)

Disconnect electrical and control components

d)

Add anti-freeze

13.

What should be done with removed cylinders and pipework?

a)

Leave on site

b)

Dispose of safely and legally

c)

Store in roof space

d)

Return to system

14.

Why is communication with the customer important during decommissioning?

a)

To sell more parts

b)

To speed up work

c)

So they understand the duration and impact

d)

It’s not important

15.

What should be left after permanent decommissioning?

a)

An open valve

b)

A full cistern

c)

A notice stating the system has been decommissioned

d)

A spare thermostat