Introduction to Roads and Earthwork

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which statement best defines a road in civil architecture?

a)

A publicly accessible way for vehicles, people, animals

b)

A private driveway serving a single household

c)

A fenced corridor for pipeline maintenance crews

d)

A pedestrian-only path within urban parks

2.

During sub-grade preparation, which sequence reflects the initial earthwork steps?

a)

Soil filling, spreading and leveling, compaction

b)

Compaction, soil filling, spreading and leveling

c)

Spreading and leveling, compaction, soil filling

d)

Compaction, grading, asphalt surfacing

3.

Why is compaction applied to the prepared sub-grade soil?

a)

To increase density and reduce settlement under loads

b)

To make excavation easier for service trenches

c)

To enhance color uniformity before paving

d)

To allow more air voids for drainage pathways

4.

A rural connector must carry mixed traffic—vehicles, pedestrians, and livestock. Which facility type is most appropriate?

a)

An open public road serving multi-user passage

b)

A controlled-access motorway with barriers

c)

A dedicated bicycle track with soft shoulders

d)

A livestock-only trail through fenced fields

5.

Which statement best defines pavement in road construction?

a)

Hard smooth surface resisting traffic and environment

b)

Loose granular layer absorbing rainfall and sunlight

c)

Permeable turf system promoting vegetation and drainage

d)

Decorative surface primarily improving visual appearance

6.

What is the typical lifespan range stated for pavements under normal conditions?

a)

About 20 to 30 years

b)

Around 5 to 8 years

c)

Roughly 35 to 50 years

d)

Nearly 12 to 15 years

7.

Flexible pavements are surfaced with which materials and why are they termed flexible?

a)

Bituminous or asphalt; structure bends under traffic loads

b)

Cement concrete; slab remains fully rigid under loads

c)

Interlocking blocks; movement restrained by edge restraints

d)

Stabilized soil; layers behave elastically without deflection

8.

Which maintenance expectation best matches flexible pavements?

a)

Require restoration roughly every 10 to 15 years

b)

Need extensive repairs each two to three years

c)

Are maintenance‑free throughout entire design life

d)

Only require cleaning without structural interventions

9.

Which layer arrangement correctly lists the typical order of flexible pavement components from top to bottom?

a)

Surface course, base course, subbase, subgrade

b)

Subgrade, subbase, base course, surface course

c)

Base course, surface course, subgrade, subbase

d)

Surface course, subgrade, base course, subbase

10.

Which statement about rigid pavements accurately captures their structural behavior and composition?

a)

Hydraulic cement concrete surface provides most strength

b)

Bituminous surface relies on granular layers for stiffness

c)

Composite asphalt-concrete layers flex uniformly with loads

d)

Interlocked pavers transfer loads mainly through soil

11.

Which option best defines a carriageway within a roadway cross-section?

a)

The portion for vehicle movement only

b)

The raised edging for channelizing water

c)

The strip for pedestrian circulation only

d)

The compacted shoulder outside traffic lanes

12.

Water bound macadam (WBM) construction primarily relies on which binding mechanism between aggregates?

a)

Water-assisted fines creating mechanical interlock

b)

Hot bitumen coating producing adhesive bonds

c)

Hydraulic cement paste forming rigid slab

d)

Polymer emulsion stabilizing graded soil

13.

Which road type is generally the most economical for low traffic rural areas but most susceptible to weather?

a)

Earth road with gravel surfacing

b)

Bituminous macadam surface course

c)

Cement concrete rigid pavement

d)

WBM with screenings and bindings

14.

A sidewalk (footpath) is primarily provided to accomplish which design goal in urban streets?

a)

Segregate pedestrians from vehicle traffic

b)

Increase lane capacity for heavy trucks

c)

Provide structural support for pavements

d)

Collect and store stormwater runoff

15.

Which pairing correctly matches component to function in a roadway?

a)

Kerb – provides edge restraint and drainage channel

b)

Shoulder – emergency stopping and lateral support

c)

Carriageway – landscaping strip and utility corridor

d)

Pavement – pedestrian waiting and bus bay area

16.

When choosing between a bituminous road and a cement concrete road for a warm region with frequent maintenance access, which choice is more appropriate and why?

a)

Bituminous road – flexible and easier to repair

b)

Bituminous road – rigid and joint-free panels

c)

Cement concrete road – softens under high heat

d)

Cement concrete road – requires frequent thin overlays

17.

During staged improvement of a village approach road, which logical upgrade sequence improves durability with moderate cost increase?

a)

Earth road → WBM → Bituminous road

b)

Earth road → Cement concrete road → WBM

c)

WBM → Earth road → Bituminous road

d)

Bituminous road → Earth road → Cement concrete

18.

Which equipment is primarily used to compact base layers during road construction?

a)

Dozer and scraper for rough grading

b)

Vibratory roller for soil compaction

c)

Concrete mixer for batching concrete

d)

Shovel for manual excavation

19.

Identify the equipment best suited to quickly move loosened soil over short distances on a roadwork site.

a)

Power shovel for deep trenching

b)

Dozer and scraper for earthmoving

c)

Barricading for traffic control

d)

Signage board for route guidance

20.

A contractor must pour curbs and drainage channels. Which equipment prepares a uniform concrete mix on site?

a)

Concrete mixer for batching and mixing

b)

Vibratory roller for compaction

c)

Shovel for manual backfilling

d)

Signage board for driver information

21.

On a busy highway rehabilitation, what combination best maintains safety and directs drivers through the work zone?

a)

Barricading and signage board together

b)

Dozer and scraper together

c)

Power shovel and vibratory roller

d)

Concrete mixer and shovels

22.

Which site activity is shown when earth is distributed to achieve a uniform formation before compaction?

a)

Subgrade spreading and leveling

b)

Granular subbase placement

c)

Final surfacing and sealing

d)

Drainage trench excavation

23.

During subgrade compaction, what is a reasonable sequence of compacted layer thicknesses when using a roller?

a)

First layer 200 mm, next layers 150 mm

b)

All layers 300 mm thick uniformly

c)

First layer 100 mm, next layers 400 mm

d)

Random thickness varying with moisture

24.

What primary function does a granular subbase serve between subgrade and pavement?

a)

Provide drainage and load distribution

b)

Act as final riding surface

c)

Increase soil plasticity and shrinkage

d)

Replace the need for compaction

25.

When specifying a granular subbase, which combination is most appropriate to control performance on site?

a)

Select graded material, define layer count, set depth, require compaction

b)

Use any local soil, omit layers, maximize depth, avoid compaction

c)

Choose largest stones only, one thin layer, minimal depth, light rolling

d)

Unspecified material, random layers, variable depth, visual settlement

26.

Which statement best describes wet mix macadam used in road bases?

a)

Crushed rock premixed with controlled water

b)

Dense asphalt compacted without added water

c)

Cement-treated soil mixed on the roadway

d)

Graded sand layer sealed with prime coat

27.

Bituminous macadam is typically laid using which process and equipment combination?

a)

Hot mix with mechanized paver

b)

Cold mix with manual raking

c)

Warm mix with pneumatic roller

d)

Hot spray with chip spreader

28.

A contractor must choose the base course sequence before finishing by rolling. Which plan ensures a stable base and proper surface?

a)

Place wet mix macadam, then bituminous macadam, finally roll

b)

Roll subgrade first, place bituminous macadam, then wet mix

c)

Lay bituminous macadam directly on untreated soil, then roll

d)

Roll wet mix macadam repeatedly, skip bituminous macadam layer

29.

Which statement best defines coarse aggregate in highway construction?

a)

Material retained on a 2.36 mm sieve

b)

Material passing a 2.36 mm sieve

c)

Material retained on a 75 micron sieve

d)

Material passing a 75 micron sieve

30.

Fine aggregate is correctly described as which of the following?

a)

Particles passing 2.36 mm and retained on 75 micron

b)

Particles retained on 2.36 mm and 75 micron

c)

Particles passing 75 micron and retained on 2.36 mm

d)

Particles larger than 2.36 mm retained on 10 mm