WorksheetsConstruction Site Safety and Environmental Practices Worksheet
Total questions: 25
Worksheet time: 13mins
Why must fuel-powered tools never be used in an enclosed space?
They are too noisy
They produce carbon monoxide fumes
They damage equipment
They overheat quickly
What should workers do after fuel comes into contact with their skin?
Wipe it off with a cloth
Wait for it to dry
Wash hands thoroughly with soap
Cover the area with gloves
What is the main risk from reversing vehicles on site?
Noise pollution
Reduced fuel efficiency
Collisions due to limited visibility
Increased dust
What must be clearly displayed on all lifting equipment?
Manufacturer’s address
Colour code
Safe Working Load (SWL)
Maximum worker height
What often causes accidents when using lifting equipment?
Poor weather
Untrained workers
Short lunch breaks
Faulty ladders
What creates “blind spots” when excavators are used for lifting?
Wet weather
Noise from the engine
The design of the machine and load
The speed of operation
What should workers do before operating fixed machinery?
Remove guards
Report faults and check guards are in place
Increase the machine speed
Disconnect the power
Why are confined spaces dangerous?
They are always dark
They trap dust only
They may contain toxic or low-oxygen atmospheres
They are hard to access
What must workers inside a confined space wear?
Ear defenders
Rescue harnesses with lifelines
High-visibility jackets
Welding masks
What is the first action if you discover asbestos?
Sweep the area
Continue working carefully
Spray it with water
Stop work and inform a supervisor
What should be done before excavating near underground services?
Use mechanical diggers to work quickly
Assume the area is safe
Use hand-dug trial holes
Ignore unknown pipes
What should overhead services be marked with?
Red flags only
High-visibility barriers
Warning triangles
Wooden planks
What is the purpose of a trench box?
Provide storage
Support trench sides without workers entering
Carry excavated soil
Measure soil depth
Who must inspect excavations before workers enter?
Any worker
A competent person
A visitor
The delivery driver
Why is working in unsafe buildings high-risk?
Floors and walls may collapse
Too much lighting is used
They have no heating
They contain too many tools
What must happen before demolition begins?
Remove all tools
Assess the structure and isolate services
Build temporary scaffolding first
Allow public access
What do COSHH regulations require?
The banning of all chemicals
Identification and control of hazardous substances
All workers to wear full PPE at all times
Only liquids to be controlled
What is the main risk from asbestos?
It causes skin blisters
It reacts with water
It releases fine fibres that damage lungs
It is slippery
What is the purpose of segregating waste on site?
To increase work speed
To support recycling and reuse
To keep workers busy
To reduce noise
What type of pollution is caused by fuel-powered machinery exhausts?
Water
Soil
Air
Light
What can water pollution from construction affect?
Internet speeds
Local ecosystems
Worker uniforms
Scaffolding strength
What is a common method to reduce noise pollution?
Use louder sirens
Work only at night
Use silenced or electric tools
Avoid PPE
Why should fuel not be stored near heat or flames?
It evaporates
It attracts insects
It is combustible
It blocks pathways
Why must materials not be stored below overhead power lines?
They may get dusty
They may cause noise
They increase the risk of contact with cables
They block traffic
What is one environmental benefit of recycling construction waste?
Makes sites quieter
Reduces carbon emissions
Reduces worker training time
Increases parking space
