wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Planning and Material Decisions

Total questions: 21

Worksheet time: 11mins

Name
Class
Date
1.

Who grants planning permission for a construction project shown in the site image?

a)

Local authority planning department

b)

Site manager coordinating trades

c)

Architect after client meetings

d)

Main contractor overseeing budgets

2.

Which role primarily decides what materials should be used after discussions with the client?

a)

Quantity surveyor pricing options

b)

Local authority enforcing byelaws

c)

Site manager supervising labour

d)

Architect leading design choices

3.

A contractor claims the site engineer creates all construction drawings. What is the correct responsibility?

a)

Client provides full drawing packages

b)

Planning officer drafts technical schematics

c)

Site engineer produces every drawing

d)

Architect and team create drawings

4.

Which statement best describes one recognised entry route into a construction trade?

a)

Starting as self-employed immediately

b)

Taking a short unrelated online course

c)

Completing a paid apprenticeship programme

d)

Skipping training and learning on site

5.

Motorway construction is typically classed as which type of project and who is the usual client?

a)

Infrastructure project commissioned by government

b)

Residential project funded by homeowners

c)

Commercial project led by retailers

d)

Industrial project sponsored by factories

6.

Which professional designs buildings as part of a construction team?

a)

Site labourer designs building structures

b)

Architect designs building structures

c)

Land surveyor designs building structures

d)

Quantity surveyor designs building structures

7.

In the context of site supervision, which role primarily checks that workmanship meets required standards on larger projects?

a)

Site supervisor on all sites

b)

Quantity surveyor during valuations

c)

Clerk of works on larger projects

d)

Local authority inspector routinely

8.

Which responsibility best matches the quantity surveyor’s role in cost management?

a)

Directing daily trade supervision

b)

Issuing building control permits

c)

Managing costs, claims, and valuations

d)

Setting structural design criteria

9.

On smaller construction sites, who may take on the task of checking work standards?

a)

Quantity surveyor always

b)

Health and safety officer

c)

Site supervisor possibly

d)

Project architect typically

10.

Which statement best distinguishes public sector clients from private sector clients in construction?

a)

Private clients are always local councils

b)

Private firms manage national road networks

c)

Public clients are homeowners building extensions

d)

Public bodies fund public infrastructure projects

11.

A couple hiring a builder to renovate their home is classified as which client type in construction?

a)

Industrial client from heavy manufacturing

b)

Commercial client from retail sector

c)

Public client from local government

d)

Domestic client from the private sector

12.

Which set of projects most accurately fits a commercial construction site classification?

a)

Water treatment plants and power stations

b)

Council buildings and highways

c)

Houses, flats, and bungalows

d)

Shops, offices, and restaurants

13.

Which statement best describes groundworkers in a typical build sequence?

a)

They finish interiors like decorators

b)

They complete snagging and touch-ups

c)

They install final floor coverings

d)

They start early with substructure tasks

14.

Who is primarily responsible for directing crane movements and larger vehicle operations on site?

a)

Groundworker lead

b)

Finishing foreman

c)

Banksman or banksperson

d)

Site carpenter

15.

Where is the required quality of workmanship usually defined for a trade task?

a)

In the job specification document

b)

In the equipment maintenance log

c)

In the daily site diary notes

d)

In the supplier delivery docket

16.

Which term best describes the process of activating water, electricity, and gas services for a newly built property in the UK?

a)

Commissioning of utilities

b)

Service connection testing

c)

Initial site energisation

d)

Utility handover procedures

17.

Before taking a construction job in another country, which document is typically required to legally work there?

a)

Overseas tax clearance

b)

Global trade registration

c)

Work visa or permit

d)

International union certificate

18.

A developer plans to convert a vacant shop into a dwelling. Which local process must be obtained before the change of use?

a)

Neighbourhood covenant approval

b)

Planning permission from local authority

c)

Building warranty certification

d)

Community impact statement filing

19.

Which statement best describes the purpose of a Damp Proof Course (DPC) in low-rise housing?

a)

Prevents rising damp entering walls

b)

Provides ventilation to wall cavities

c)

Strengthens roof truss connections

d)

Insulates floors from heat loss

20.

On a new-build site, which trade typically constructs the timber frame above the DPC (damp-proof course)?

a)

Carpenters build timber frames

b)

Bricklayers build timber frames

c)

Plasterers build timber frames

d)

Electricians build timber frames

21.

A site engineer is marking out foundations for a house plot. Which action is most appropriate at this stage?

a)

Running electrical cables through conduits

b)

Fixing plasterboard to internal stud walls

c)

Installing roof trusses and ridge beams

d)

Setting out building lines with datum points