1.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
What are the time splits used in the calculation of Overall Equipment Effectiveness.
Utilization, Availability, Performance & Quality
Availability, Performance & Quality
Availability & Performance
2.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Rates used in calculating the Performance element of Overall Equipment Effectiveness are based on:
The best rate determined using past data or process studies
MAC (75th Percentile)
Always the design rate
3.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Production loss related to breaks and preventive maintenance impacts what part of OEE
Performance
Availability
Neither, both are excluded from the calculation.
4.
MULTIPLE SELECT QUESTION
20 sec • 1 pt
The Performance component of OEE includes:
Microstops
Breakdowns
Slow cycle times
5.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Overall Equipment Effectiveness focuses on:
Each piece of equipment in the plant
The constraint/bottleneck
Those pieces of equipment where we have digital OEE solutions.
6.
MULTIPLE SELECT QUESTION
20 sec • 1 pt
Select which of the following contribute to Unplanned Downtime:
Breakdowns
Changeovers
Microstops
Waiting for Product or Pack
Breaks
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?