What are the time splits used in the calculation of Overall Equipment Effectiveness.

Utilization, Availability, Performance & Quality

Availability, Performance & Quality

Availability & Performance

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Rates used in calculating the Performance element of Overall Equipment Effectiveness are based on:

The best rate determined using past data or process studies

MAC (75th Percentile)

Always the design rate

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Production loss related to breaks and preventive maintenance impacts what part of OEE

Performance

Availability

Neither, both are excluded from the calculation.

4.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

The Performance component of OEE includes:

Microstops

Breakdowns

Slow cycle times

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Overall Equipment Effectiveness focuses on:

Each piece of equipment in the plant

The constraint/bottleneck

Those pieces of equipment where we have digital OEE solutions.

6.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Select which of the following contribute to Unplanned Downtime:

Breakdowns

Changeovers

Microstops

Waiting for Product or Pack

Breaks

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?