Spill Prevention, Control, And Countermeasures

Spill Prevention, Control, And Countermeasures

Professional Development

20 Qs

quiz-placeholder

Similar activities

BPMU

BPMU

Professional Development

15 Qs

Cooking Methods, Allergies, Appetizers and Soups

Cooking Methods, Allergies, Appetizers and Soups

Professional Development

20 Qs

Good Manufacturing Practices: Quiz (NY)

Good Manufacturing Practices: Quiz (NY)

Professional Development

15 Qs

FRONT OFFICE MIX QUIZ

FRONT OFFICE MIX QUIZ

Professional Development

20 Qs

Forms and Applications

Forms and Applications

Professional Development

22 Qs

Soal SJH Post Test Crew

Soal SJH Post Test Crew

Professional Development

15 Qs

Instrument Panel -  for General (All Versatility) #1

Instrument Panel - for General (All Versatility) #1

Professional Development

20 Qs

CEM Refresher

CEM Refresher

Professional Development

20 Qs

Spill Prevention, Control, And Countermeasures

Spill Prevention, Control, And Countermeasures

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Mohammad Riad Hossain

Used 11+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 5 pts

Which of the following are the three response planning levels a facility must prepare for? (Select three.)

A.  Discharge greater than 2,100 gallons and

     less than or equal to 36,000 gallons

B. Best case discharge

C.  Discharge of 2,100 gallons or less

D.  Worst case discharge

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Which of the following is NOT a form of secondary containment?

A.  Booms

B.  Inspections

C.  Curbs

D.  Barriers

3.

MULTIPLE SELECT QUESTION

45 sec • 5 pts

Which of the following items would lead a facility to be subject to the SPCC Rule (Select all that apply.)

A.  A reasonable expectation of oil discharge into or upon navigable waters or adjoining shorelines

B.  An aboveground aggregate oil storage capacity exceeding 1,320 gallons.  An aboveground aggregate oil storage capacity exceeding 1,320 gallons

C.  An underground aggregate oil storage capacity exceeding 42,000 gallons

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Some farms are required to develop an SPCC plan.

A.  True

B.  False

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The SPCC rule does not require facilities to regulate the drainage from secondary containment areas in order to prevent contamination into the natural drainage system.

A.  True

B.  False

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

If a facility is located at a distance where a discharge from the facility could cause injury to fish, wildlife, and sensitive environments, they must submit a ________ to the EPA.

A.  facility response coordinator

B.  facility-specific response plan

7.

MULTIPLE SELECT QUESTION

45 sec • 5 pts

Which of the following items should be covered in the training given to the employees involved in handling oil? (Select all that apply.)

A.  Relevant pollution control laws, rules, and regulations

B.  The contents of the SPCC plan

C.  Operating and maintenance procedures

D.  Discharge procedure protocols

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?