FMEA

FMEA

Professional Development

15 Qs

quiz-placeholder

Similar activities

FMEA & Control Plan

FMEA & Control Plan

Professional Development

15 Qs

ISQPC

ISQPC

Professional Development

10 Qs

QUALITY CLINIC #04_PFMEA & QUALITY CLINIC #05_8-Disciplines

QUALITY CLINIC #04_PFMEA & QUALITY CLINIC #05_8-Disciplines

Professional Development

10 Qs

reliability

reliability

Professional Development

10 Qs

QRM Quizz

QRM Quizz

Professional Development

15 Qs

OEE

OEE

Professional Development

10 Qs

Manajemen Risiko

Manajemen Risiko

Professional Development

10 Qs

APQP Training - VP Event - Part 1

APQP Training - VP Event - Part 1

Professional Development

11 Qs

FMEA

FMEA

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

FARHANA ABD RAZAK

Used 8+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The probability of a failure mode occurring due to its related cause is ________

Severity

Detection

Occurrence

Action priority

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Failure mode and effect analysis (FMEA) provide a checklist procedure. Which of the following questions is NOT likely to feature on the checklist?

What would be the cost of avoiding failure?

What would the consequences of the failure?

What is the likelihood that failure will occur?

How likely is such a failure to be detected before it affects the customer?

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Failure modes is defined as

any physical process, chemical process, design or any factor that is the basic reason for failure or deterioration that leads to failure

consequences of the product failure on the function, operation or process on the overall system and on the customers

the manner in which the process could cause the product not to deliver or   provide intended function

none of the answer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

State occasions that require FMEA to be updated.

When the product or process is modified or redesigned/ When any operating condition of the process is changes

When the previous FMEA is considered outdated (it exceeds the time interval)

When complaints from customers are received/ When any error or discrepancy in the FMEA table is identified

All the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Find the odd one out related to the FMEA team

Assembly engineer

Quality engineer

Manufacturing engineer

Process variability data

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A particular product has been given the following rankings for

calculating AP while preparing FMEA chart, S=10, O=2, D=6. What is

the value of AP?

L

M

H

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a process has a '10' scale rating, what is the likelihood of detection?

Almost Certain

Almost Impossible

Very Low

Very High

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?