Economic load dispatch and unit commitment (cost control)

Economic load dispatch and unit commitment (cost control)

University

10 Qs

quiz-placeholder

Similar activities

8-20 Board Review

8-20 Board Review

University

15 Qs

TOPIK 4 PENCERNAAN

TOPIK 4 PENCERNAAN

University

10 Qs

Vitaminas Hidrosolubles

Vitaminas Hidrosolubles

University

13 Qs

Sistema Digestivo

Sistema Digestivo

University

10 Qs

Wawasan MaBa TIf UM 2021

Wawasan MaBa TIf UM 2021

University

12 Qs

ANEMIAS

ANEMIAS

University

15 Qs

EXAMEN GERIATRÍA

EXAMEN GERIATRÍA

University

10 Qs

Eu aprendi

Eu aprendi

University

10 Qs

Economic load dispatch and unit commitment (cost control)

Economic load dispatch and unit commitment (cost control)

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

Mr. Chavan

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In a two plant system the load is connected to plant number two the loss coefficient.

B11,B12,B22 are nonzero

B11 is nonzero but B12 and B22 are zero

B11 and B12 nonzero but B22 is zero

B11 and B22 nonzero but B12 is zero

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

If the penalty factor of a plant is unity, its incremental transmission loss is

1.0

-1.0

Zero

None any of these

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

economic operation of power system is carried out on the basis of

Equal incremental fuel cost

Equal area criterion

Equal fuel cost criterion

All units sharing equal power

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Unit commitment is

A must before we solve economic operation problem

A short term problem of maintenance scheduling

More meaningful for thermal units

All option correct

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

For short term planning problems losses can be found out.

By using approximate loss formula

By load flow studies

By carrying out stability studies

Can be ignored

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

For long term hydrothermal problem

Head variation can be ignored

Transmission loss cannot be ignored

Unit commitment should be taken into account

All the answers

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

for economic operation The generator with highest positive incremental transmission loss will operate at

the highest positive incremental cost of production

the highest negative incremental cost of production

the lowest positive incremental cost of production

the lowest negative incremental cost of production

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?