COSH Set 2

COSH Set 2

University

65 Qs

quiz-placeholder

Similar activities

Actg Elec 2 - Final Exam

Actg Elec 2 - Final Exam

University

65 Qs

MARENV Pre Review 1

MARENV Pre Review 1

University

69 Qs

Air Law

Air Law

University

69 Qs

ÔN TẬP KHẢO SÁT TA 9

ÔN TẬP KHẢO SÁT TA 9

9th Grade - University

60 Qs

Final Exam in Legal Aspects

Final Exam in Legal Aspects

University

60 Qs

S6-1: Mock CBT Week 12 (9/4/2018)

S6-1: Mock CBT Week 12 (9/4/2018)

University

60 Qs

Constitution and Amendment Quiz-Made by Antony

Constitution and Amendment Quiz-Made by Antony

4th Grade - University

70 Qs

UNIT 1

UNIT 1

University

65 Qs

COSH Set 2

COSH Set 2

Assessment

Quiz

Other

University

Hard

Created by

Melrick Acidre

FREE Resource

65 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Primary cause of accident that is characterized by the human action that departs from a standard or written job procedure or common practice, safety rules, regulations, or instructions.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The physical or chemical property of a material, machine or the environment which could result in injury to a person, damage or destruction to property or other forms of losses.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A risk associated with poorly guarded or dangerous equipment and machinery that may cause injury.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A risk associated with exposure to dangerous substance or conditions that may cause illness/disease.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In demolition safety, this control is characterized by ensuring separation between the public and the demolition activities.

Elimination

Substitution

Isolation

Engineering control

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which control is demonstrated by the use of power shears, in place of grinding or oxy-acetylene cutting, where there is a risk of fire?

Elimination

Substitution

Isolation

Engineering control

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installation of scaffolds, platforms, guardrails, shoring and bracing to support loads are examples of this type of risk control

Elimination

Substitution

Administrative control

Engineering control

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?