COSH Set 2

COSH Set 2

University

65 Qs

quiz-placeholder

Similar activities

Final Examination: NSTP 2

Final Examination: NSTP 2

University

60 Qs

Sejarah Bahasa Indonesia

Sejarah Bahasa Indonesia

University

60 Qs

UAS SIM AGB

UAS SIM AGB

University

60 Qs

Ujian Akhir Semeter Genap MK FT Neuromuskuler

Ujian Akhir Semeter Genap MK FT Neuromuskuler

University

60 Qs

UTS Reg A MK KMB III Smstr V

UTS Reg A MK KMB III Smstr V

University

60 Qs

SKU Bantara

SKU Bantara

University

65 Qs

Randomness

Randomness

4th Grade - University

69 Qs

Muscle - Physiology 1

Muscle - Physiology 1

University

60 Qs

COSH Set 2

COSH Set 2

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

Melrick Acidre

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

65 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Primary cause of accident that is characterized by the human action that departs from a standard or written job procedure or common practice, safety rules, regulations, or instructions.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The physical or chemical property of a material, machine or the environment which could result in injury to a person, damage or destruction to property or other forms of losses.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A risk associated with poorly guarded or dangerous equipment and machinery that may cause injury.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A risk associated with exposure to dangerous substance or conditions that may cause illness/disease.

Safety hazard

Health hazard

Unsafe act

Unsafe condition

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In demolition safety, this control is characterized by ensuring separation between the public and the demolition activities.

Elimination

Substitution

Isolation

Engineering control

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which control is demonstrated by the use of power shears, in place of grinding or oxy-acetylene cutting, where there is a risk of fire?

Elimination

Substitution

Isolation

Engineering control

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installation of scaffolds, platforms, guardrails, shoring and bracing to support loads are examples of this type of risk control

Elimination

Substitution

Administrative control

Engineering control

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?