Oversee & Design Mock Paper 1

Oversee & Design Mock Paper 1

Professional Development

44 Qs

quiz-placeholder

Similar activities

TUTORIAL 1

TUTORIAL 1

University - Professional Development

40 Qs

DAR South Cotabato Examination for New Entrants

DAR South Cotabato Examination for New Entrants

Professional Development

40 Qs

ECITLA

ECITLA

Professional Development

48 Qs

Diagnostic test part II.

Diagnostic test part II.

KG - Professional Development

48 Qs

IS Security

IS Security

Professional Development

44 Qs

Phase 3 - Electrical checkpoint test 2

Phase 3 - Electrical checkpoint test 2

Professional Development

49 Qs

MTI/OFC/Mod4/16.11.2020

MTI/OFC/Mod4/16.11.2020

Professional Development

41 Qs

A2 high Final Exam (Units 9-16)

A2 high Final Exam (Units 9-16)

Professional Development

42 Qs

Oversee & Design Mock Paper 1

Oversee & Design Mock Paper 1

Assessment

Quiz

Other

Professional Development

Medium

Created by

Amir Karbassi

Used 6+ times

FREE Resource

44 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When explaining installation details to colleagues it is important to make sure that

Colleagues are tested about their understanding

Technical terms are used constantly

Instructions are clear and thorough

Colleagues are given a copy of the installation specification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An ECS (Electrotechnical certification scheme) card is valid for how many years?

10

1

5

3

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Due to bad weather conditions, your company has not been able to complete the outside work by the agreed date. This could lead to

The outside work being completed after the client has moved in

The job completion being delayed

Your company requesting a variation order so that the work can be completed

Cancellation of all outside works

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A variation order to install additional outlets will be issued by the

Client

Sub - contractor

Site manager

Contractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document details the number and types of components that are needed for a project?

Gantt chart

Material schedule

Quotation

Site report

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A project is scheduled to take 160 person hours for completion. If the working day is 8 hours, what is the minimum number of staff required to complete the project within 10 days?

4

2

3

1

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Media Image

Identify the two correct pieces of equipment for carrying out the tests shown in the table.

Tong tester

Earth fault loop impedance tester

Continuity tester

Insulation resistance tester

Voltage inductor

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?