Unvented Hot Water System Quiz

Unvented Hot Water System Quiz

Professional Development

51 Qs

quiz-placeholder

Similar activities

Type 2 quiz September 5 - September 11

Type 2 quiz September 5 - September 11

Professional Development

50 Qs

PRODUCT KNOWLEDGE SCANIA

PRODUCT KNOWLEDGE SCANIA

Professional Development

50 Qs

D245s Technical Assessment

D245s Technical Assessment

Professional Development

50 Qs

BASIC FIRE BRIGADE

BASIC FIRE BRIGADE

Professional Development

50 Qs

CIDESCO Practice 1

CIDESCO Practice 1

Professional Development

50 Qs

Type 3 Quiz

Type 3 Quiz

Professional Development

46 Qs

PKPM WA

PKPM WA

Professional Development

49 Qs

UTS Motor Diesel

UTS Motor Diesel

University - Professional Development

50 Qs

Unvented Hot Water System Quiz

Unvented Hot Water System Quiz

Assessment

Quiz

Other

Professional Development

Easy

Created by

Brendan Cocks

Used 10+ times

FREE Resource

51 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is an unvented hot water system?

A system that uses a cold water storage cistern.

A sealed hot water system of pipework and components supplied with water above atmospheric pressure.

A system that has an open vent pipe.

A system that does not require mechanical safety devices.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

How is an unvented hot water system fed?

By an open vent pipe.

By a cold water storage cistern.

Directly from the mains supply, by booster pump or accumulator.

By a manual pump.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is used to accommodate the expansion of heated water in an unvented hot water system?

An open vent pipe.

A cold water storage cistern.

An external expansion vessel or an internal expansion bubble.

A manual pump.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What additional components are required for the safe control of expansion and temperature in an unvented hot water system?

Cold water storage cisterns.

Open vent pipes.

Mechanical safety devices.

Manual pumps.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Before installing an unvented hot water system, what should be considered regarding the available pressure and flow?

It should be ignored as it does not affect the system.

It should be checked after installation.

Readings should be taken prior to installation at peak demand periods.

It should be considered only if there is a problem.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Why is it important to consider the route of the discharge pipework, termination, and pipe size before installing an unvented hot water system?

To ensure the system is aesthetically pleasing.

To ensure the system performs efficiently.

To reduce the cost of installation.

To avoid the need for terminal fittings.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What should be considered about the type of terminal fittings used in an unvented hot water system?

All taps and fittings are suitable.

Only the cheapest fittings should be used.

Not all taps and fittings will be suitable.

The fittings should be installed after the system is operational.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?