Phase 3 - Electrical checkpoint test 2

Phase 3 - Electrical checkpoint test 2

Professional Development

49 Qs

quiz-placeholder

Similar activities

Construction Vernacular Term (6 of 8)

Construction Vernacular Term (6 of 8)

KG - Professional Development

52 Qs

PERFORMANCE CHECK AF ACO YIA 2022

PERFORMANCE CHECK AF ACO YIA 2022

KG - Professional Development

50 Qs

EPA mock Test 1

EPA mock Test 1

Professional Development

50 Qs

Electrical 101 final

Electrical 101 final

Professional Development

50 Qs

NPA 1130 - Unit 10

NPA 1130 - Unit 10

Professional Development

50 Qs

MIDTERM BEED2 - 1A

MIDTERM BEED2 - 1A

University - Professional Development

50 Qs

MineCraft

MineCraft

KG - Professional Development

49 Qs

Central Heating L2 6035 Plumbing

Central Heating L2 6035 Plumbing

Professional Development

54 Qs

Phase 3 - Electrical checkpoint test 2

Phase 3 - Electrical checkpoint test 2

Assessment

Quiz

Other

Professional Development

Medium

Created by

Ben Ashford

Used 1+ times

FREE Resource

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be carried out before any electrical work takes place?

Safe isolation.

Safe insulation.

Safe continuity.

Safe polarity.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following units should be used to check if a circuit is dead?

Multimeter.

RCD.

Proving.

OHMs.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests should be carried out on insulation?

Polarity.

Resistance.

Impedance.

Continuity.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The floor area covered by a ring final circuit must not exceed

25 m²

50 m²

75 m²

100 m²

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main protection on a domestic consumer unit is provided by which one of the following?

RCD.

RBC.

MCB.

MCD.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 9.8 kW shower should be protected by a circuit breaker rated at

35 amp

40 amp

45 amp

50 amp

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests should be carried out to ensure that phase and neutral are not cross connected?

Polarity

Resistance

Impedance

Continuity

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?