Search Header Logo

Week10 Average Method with Beginning

Authored by Pimsiri Chiwamit

Business

University

Used 2+ times

Week10 Average Method with Beginning
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

1) Which is the conversion cost per unit required to complete a unit for the Trimming and Painting Department in Jan 20x1?

A. 6.00

B. 8.80

C. 10.00

D. 14.50

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2) Which one is the total cost per unit of production within From the Trimming and Painting Department for this period?

A. 6.00

B. 10.00

C. 14.50

D. 24.50

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3) For Drilling and Packaging Department in January 20x1,

Calculate the equivalent units of Tran-in, material, labor and MOH.

A. 0 (Tran-in), 2,715 (Material), 2,715 (Labor), and 2,715 (MOH)

B. 2,715 (Tran-in), 2,715 (Material), 2,715 (Labor), and 2,715 (MOH)

C. 2,715 (Tran-in), 2,715 (Material), 2,987 (Labor), and 2,919 (MOH)

D. 4,075 (Tran-in), 2,715 (Material), 2,987 (Labor), and 2,919 (MOH)

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4) According to the Drilling and Packaging Department information, What is the transferred-in cost per unit for this period?

A. 10.00

B. 14.50


C. 24.50

D. 28.00

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5) For Drilling and Packaging Department in worksheet2,     

Calculate the equivalent units of Tran-in, material, labor and MOH.

A. 6112 (Tran-in),

3202 (Material),

3784 (Labor), and

3639 (MOH)

B. 6112 (Tran-in),

3202 (Material),

3789 (Labor), and

3640 (MOH)

C. 6112 (Tran-in),

3250 (Material),

3789 (Labor), and

3639 (MOH)

D. 6112 (Tran-in),

3250 (Material),

3784 (Labor), and

3640 (MOH)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6) For Drilling and Packaging Department in worksheet2,     

Calculate Cost per equivalent units of Tran-in, material, labor and MOH.

A) 23.26 (Tran-in),

0.2 (Material),

1.5 (Labor), and

1.23 (MOH)

B) 23.26 (Tran-in),

0.2 (Material),

1.8 (Labor), and

1.20 (MOH)

C) 24.26 (Tran-in),

0.2 (Material),

1.1 (Labor), and

1.23 (MOH)

D) 24.26 (Tran-in),

0.2 (Material),

1.1 (Labor), and

1.20 (MOH)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7) For Drilling and Packaging Department in worksheet2,     

Calculate Cost assigned to Ending WIP (classified into Tran-in, material, labor and MOH).

A) 67687 (Tran-in),

0 (Material),

890 (Labor), and

520 (MOH)

B) 67687 (Tran-in),

0 (Material),

890 (Labor), and

510 (MOH)

C) 67687 (Tran-in),

0 (Material),

873 (Labor), and

538 (MOH)

D) 67687 (Tran-in),

0 (Material),

873 (Labor), and

528 (MOH)

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?