Cost Estimation Quiz

Cost Estimation Quiz

University

10 Qs

quiz-placeholder

Similar activities

TUTORIAL 4-BEARING_Part A

TUTORIAL 4-BEARING_Part A

University

10 Qs

Quiz on Non-traditional Machining

Quiz on Non-traditional Machining

University

10 Qs

Geology Engineering

Geology Engineering

University

10 Qs

GCSE Design and Technology: Production Techniques Quiz

GCSE Design and Technology: Production Techniques Quiz

10th Grade - University

15 Qs

Section 4.2.5. Separation of Dissolved Liquids PART 2

Section 4.2.5. Separation of Dissolved Liquids PART 2

University

10 Qs

Electrical Lab Safety

Electrical Lab Safety

9th Grade - University

14 Qs

SOFTWARE ENGINEERING QUIZ

SOFTWARE ENGINEERING QUIZ

University

15 Qs

Lesson 2 PLC Systems

Lesson 2 PLC Systems

University

15 Qs

Cost Estimation Quiz

Cost Estimation Quiz

Assessment

Quiz

Engineering

University

Hard

Created by

SYED CHIK

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is another term for Capital Cost?

Depreciation Cost

Capital Expenditure (CapEx)

Revenue Expenditure

Operating Cost

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which factor is NOT considered in estimating purchased equipment costs?

Equipment capacity

Material of construction

Operator skill level

Time

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the typical cost exponent (n) for the six-tenths rule?

0.5

0.6

1.0

0.8

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of diagram is used in a Class 4 'Study Estimate'?

Process and Instrumentation Diagram (P&ID)

Block Flow Diagram (BFD)

Isometric Diagram

Elevation Diagram

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary use of a Plant Cost Index?

Adjusting historical costs for inflation

Calculating revenue

Estimating equipment capacity

Standardizing material quality

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of expenses includes freight, insurance, and taxes?

Direct expenses

Installation expenses

Indirect project expenses

Maintenance expense

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Lang Factor Method, what does FLang represent?

Fixed costs

Lang factor for total plant costs

Labor costs

Freight charges

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?