cen heat ppt 3

cen heat ppt 3

Professional Development

23 Qs

quiz-placeholder

Similar activities

Processes revision

Processes revision

Professional Development

23 Qs

Electrical Chapter 50

Electrical Chapter 50

Professional Development

20 Qs

DC Circuits 1 MA 1 25 23

DC Circuits 1 MA 1 25 23

Professional Development

20 Qs

Soldering Fundamentals

Soldering Fundamentals

Professional Development

20 Qs

Environmental L3 8202

Environmental L3 8202

Professional Development

25 Qs

Size Consumer Gas Piping Systems

Size Consumer Gas Piping Systems

Professional Development

22 Qs

Current voltage and resistance

Current voltage and resistance

Professional Development

22 Qs

CRDe TREM IV Training

CRDe TREM IV Training

Professional Development

20 Qs

cen heat ppt 3

cen heat ppt 3

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

mike coldman

Used 2+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is pipe sizing for central heating systems calculated?

Based on the amount of heat required by a room in kW

Based on the amount of water containing heat in kg/s

Based on the size of the room

Based on the temperature of the water

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens to the pipe size as more heat is needed?

The pipe size decreases

The pipe size remains the same

The pipe size increases

The pipe size becomes irrelevant

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is used to counteract the resistance to flow in a central heating system?

A central heating circulating pump

A water heater

A pressure valve

A thermostat

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is resistance greater in a central heating circuit?

At the beginning of the circuit

In the middle of the circuit

At the end of the circuit

It is the same throughout

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is the first section of the pipework in a central heating system the largest in diameter?

It carries the least amount of water

It has the least resistance

It has to carry the most water to feed all heat emitters

It is the shortest section

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the term used for the longest circuit in a central heating system?

Main circuit

Index circuit

Primary circuit

Secondary circuit

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Column 1 represent in the central heating pipe sizing process table?

Total heat required for the section

Section of pipe being sized

Flow rate through the pipe

Pressure loss per meter

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?