Domestic Hot Water Systems: Testing and Decommissioning

Domestic Hot Water Systems: Testing and Decommissioning

3rd Grade

30 Qs

quiz-placeholder

Similar activities

SKTNPBJ, SKNP, SEEA

SKTNPBJ, SKNP, SEEA

1st - 3rd Grade

25 Qs

CHAPTER 2 : 个十百千万

CHAPTER 2 : 个十百千万

1st Grade - Professional Development

25 Qs

AES - Pneudraulic System

AES - Pneudraulic System

KG - Professional Development

25 Qs

AU. 32 STYCZEŃ

AU. 32 STYCZEŃ

1st - 6th Grade

26 Qs

Leadership and teamwork

Leadership and teamwork

1st - 3rd Grade

25 Qs

Lead Auditor Day#3

Lead Auditor Day#3

1st Grade - University

32 Qs

CONVERSATION 4 Game

CONVERSATION 4 Game

2nd - 12th Grade

25 Qs

The Hunger Games

The Hunger Games

1st - 12th Grade

25 Qs

Domestic Hot Water Systems: Testing and Decommissioning

Domestic Hot Water Systems: Testing and Decommissioning

Assessment

Quiz

Professional Development

3rd Grade

Practice Problem

Easy

Created by

Richard Walters

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus of Unit 206 in the learning material?

Installation of domestic hot water systems

Testing and decommissioning of domestic hot water systems

Maintenance of domestic hot water systems

Design of domestic hot water systems.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should you check for open ends before soundness testing?

Yes

No

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing and decommissioning process?

Set up equipment

Visual inspection

Test period

Final check

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blank: The step before 'Complete documentation' is ____.

Visual inspection

Set up equipment

Test period

Final check

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In soundness testing, after filling the system with water, what should you do next?

Leave for one hour

Walk around system and check for leaks

Attach the hydraulic test bucket

Rectify and re-test if necessary.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of leaving the system to stand for 30 minutes during soundness testing?

Pressure increase

Temperature stabilisation

Leak detection

Water drainage

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

During soundness testing, the system should be pumped up to how many times the working pressure?

1.5 times

2 times

3 times

4 times

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development