Quality Control Fundamentals in Infrastructure Projects

Quality Control Fundamentals in Infrastructure Projects

Professional Development

10 Qs

quiz-placeholder

Similar activities

software engineering

software engineering

Professional Development

10 Qs

Understanding Milling Machines

Understanding Milling Machines

Professional Development

10 Qs

Juniper Paragon Automation

Juniper Paragon Automation

Professional Development

10 Qs

Quiz sur le Moteur à Deux Temps

Quiz sur le Moteur à Deux Temps

Professional Development

10 Qs

BSD Quiz No. 2

BSD Quiz No. 2

Professional Development

15 Qs

Battery Technology Quiz

Battery Technology Quiz

Professional Development

10 Qs

Chapter 10: TRAPS AND INTERCEPTORS

Chapter 10: TRAPS AND INTERCEPTORS

Professional Development

10 Qs

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Professional Development

10 Qs

Quality Control Fundamentals in Infrastructure Projects

Quality Control Fundamentals in Infrastructure Projects

Assessment

Quiz

Engineering

Professional Development

Medium

Created by

undefined undefined

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the primary focus of Quality Control (QC) in construction projects?

Planning project budgets

Identifying defects in the final product

Preventing defects through planning

Designing construction layouts

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which phase involves final inspections and preparation of punch lists?

Design Phase

Construction Phase

Pre-Construction

Post-Construction

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Why is materials testing critical in QC?

It can replace the need for inspections

It prevents contractors from cheating

It provides definite evidence of material quality

It helps make construction faster

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What document from DPWH sets the national standards for QC?

ISO Handbook

DPWH Blue Book

ASTM Manual

Quality Control Logbook

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Who is primarily responsible for supervising materials testing?

Project Inspector

Survey Team

Materials Engineer

Field Technician

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Poor joint construction in concrete leads to:

Better compaction

Water ingress and cracking

Cost savings

Higher strength

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is a best practice during the material management phase?

Skip laboratory verification

Test only upon final delivery

Pre-qualify materials and suppliers

Use non-standard methods

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?