Search Header Logo

CMT 6 floor systems trade terms

Authored by Wayground Content

Specialty

University

Used 9+ times

CMT 6 floor systems trade terms
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first and last joists in a floor system that run parallel to the common joists are called:

Rim Joists

Header Joists

Blocking Joists

Sill Joists

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The weight of permanent, stationary construction and equipment included in a building is referred to as:

Live load

Dead load

Wind load

Snow load

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a length of lumber applied over a joint to strengthen it called?

Scab

Brace

Beam

Strut

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The highest point of the curved edge of a framing member is called:

Crown

Base

Edge

Peak

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is temporary bracing used to support above-grade concrete slabs while they set called?

Shoring

Scaffolding

Formwork

Reinforcement

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a metal or fiberglass concrete form used for two-way joist systems called?

Waffle form

Beam form

Slab form

Panel form

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total of all moving and variable loads that may be placed upon a structure called?

Dead load

Live load

Static load

Environmental load

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?