Weekly CRC Quiz- 29th Nov 2018

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Validation has been introduced wherein the crm request for Reconnection/ Permanent disconnection/Name change will not be saved in case if the vigilance case is booked in consumer account

a)

TRUE

b)

FALSE

2.

In name change, the BA will be created but Name change request transaction will not get saved if Vigilance case is booked on that particular account.

a)

TRUE

b)

FALSE

3.

For name change cases if society/builder is giving NOC on their original letter head then the stamp is not mandatory however signature of secretary or chairman is mandatory

a)

TRUE

b)

FALSE

4.

ACTUAL SOURCE IN TECHNICAL COMPLAINTS HAS TO BE MENTIONED IN CRM AT

a)

short description which is just above the customer name tab on service request page

b)

problem description

c)

solution description

d)

subject category 1

5.

In case if any consumer visits for name change on the same consumer no. where the name change lock is applied

a)

kindly scan the documents and send the same to Ms. Sakshi Shigwan and raise a general query call log. Once the approval is received then raise a name change call under major and send the documents to the backend. Do not remove the lock unless the scanned documents are approved by department.

b)

Reject the application and provide intimation receipt

c)

Remove the name change lock & raise the request

d)

None of the above

6.

What is the DPC charge levied to the consumer if bill is not paid before or on due date.

a)

1.25%

b)

1.5%

c)

2%

d)

1%

7.

Discount is allowed 1 % to the consumer on the complete bill amount

a)

TRUE

b)

FALSE

8.

WHAT ARE THE CONTENTS OF BILL CALCULATED ON BILLED UNIT.

a)

ENERGY CHARGE

b)

FAC

c)

T.O.S.E

d)

WHEELING CHARGE

e)

RAC

9.

WHAT ARE THE BILL CONTENTS CALCULATED ON METERED UNIT FOR SINGLE PHASE WELCOME CONSUMER

a)

RAC

b)

CSS

c)

WHEELING CHARGE

d)

FIXED CHARGE

e)

ELECTRICITY DUTY

10.

LAB TESTING CHARGES FOR 3 PHASE METER ACCEPTED IN CRC FOR ADANI METER IS _______

a)

CHARGES NEED TO BE PAID AT ADANI CRC FOR LAB TESTING

b)

300

c)

500

d)

350

e)

600