NEW
Font size
WorksheetsPlumbing L2 Drainage systems
Total questions: 12
Worksheet time: 6mins
What building regulations cover drainage systems?
Part L and J
Part H and G
Part H and P
Part G and L
The British standard for sanitary installation is?
BS 6700
BSEN 806
BS 6465
BS 1212
The British standard that cover gravity drainage systems within the building is?
BS 12056
BS 1212
BSEN 806
BS 6700
The British standard for good workmanship on site is?
BS 8000 pt13
BSEN 806
BS 1212
BS 1172
This picture shows a?
Primary ventilated stack
Secondary ventilated stack
Soil pipe
Drain pipe
This picture shows a?
Waste manifold
Long radius bend
Strap boss
intumescent collar
This picture shows a?
Waste manifold
Long radius bend
Strap boss
intumescent collar
This picture shows a?
Waste manifold
Long radius bend
Strap boss
intumescent collar
This picture shows a?
Waste manifold
Long radius bend
Strap boss
intumescent collar
The fall on a soil stack must be?
90 degrees
45 degrees
Self cleaning
7 mm per metre
The lowest connection to the soil stack must be a minimum of how many mm for a two story building?
150 mm
300 mm
450 mm
750 mm
The lowest connection to the soil stack must be a minimum of how many mm for a five story building?
150 mm
300 mm
450 mm
750 mm
