Total questions: 25
Worksheet time: 13mins
Under Fulltime Supervision Services, the
following are the scope of services except:
Filing of documents
Evaluation of Construction Work
Quality Assurance
Preparation of Daily Inspection
Reports
Service where the Architect assists the
Client in conducting bids or negotiations
with General Contractors, subcontractors
and suppliers of building materials,
furniture, equipment, fixtures, etc.
Acoustic Design Services
Architectural Interiors Services
Architectural Lighting Layout And
Design
Regular Design Services
Assist the proper third parties in seeing to
it that all equipment (air-conditioning,
sprinkler system, generators, transformers,
telecommunications equipment, etc.) are
properly maintained and in good working
condition.
Facility Maintenance Support
Services
Construction Manager
Comprehensive Development
Planning
Building Equipment Maintenance
As early as during the design development
phase, perhaps even concurrently with the
Architect’s commission, the Project
Manager (PM) should conduct regular
consultations with the Owner and with the
Architects and Engineers (for A&E
services) on all aspects of planning for the
project.
Consultation
Project Development Phase
Pre-Construction Phase
Comprehensive Development
Planning
The Recommended Professional Fee
(RPF) for an Architect doing Design-Build
Services on Guaranteed Maximum Cost
shall be?
7% of PCC
8% of PCC
9% of PCC
10% of PCC
The person or organization that undertakes
or promotes an ADC with the primary
objective of obtaining excellence in design
for a project or for a development concept.
PRC
Owner
Specialist Consultant
Professional Advisor
Pursuant to Section 7, Article II of R.A. No.
9266, known as?
The Architectural Act of 2004
The Architecture Act of 2010
The Architecture Act of 2004
The Architectural Act of 2010
A person found preparing architectural
plans without the necessary license is
guilty of what?
Misinterpretation
Nothing
Misdemeanor
Illegal Practice
Specialist personnel who may be consulted
by the Jurors during the conduct of the
ADC to permit them to obtain all necessary
relevant information.
Technical Advisors
Professional Advisor
IAPOA ADC Committee
Competition Secretariat
Recommended Professional Fee (RPF) for Detailed Architectural and Engineering Design Services (DAEDS) with a Project Construction Cost (PCC) of over P50.0 million to P100.0 million for buildings with simplest utilization.
P2,500,000 plus 4% of excess of P50.0 million
P2,000,000 plus 3% of excess of P50.0 million
P3,000,000 plus 5% of excess of P50.0 million
P3,500,000 plus 6% of excess of P50.0 million
The project construction cost is guaranteed by the Architect not to exceed how many percentage of the estimated project construction cost?
5%
6%
7%
10%
Supervise landscape contractors and gardeners for the proper watering, pruning, trimming and maintenance of the landscape (both hardscapes and softscapes).
Project Manager
Grounds and Landscaping Supervision
Site and Physical Planning
Site Development Planning
When the Consulting Architect is commissioned to do this service, he examines existing laws, ordinances, and political / social constraints.
Site Development Planning (SDP) Services
Site And Physical Planning Services
Comprehensive Development Planning (CDP) Services
Contract Documentation And Review Services
Is directly responsible to the Owner on all aspects of the construction work: programming, coordination, quality and cost control and time management.
Project Manager
Construction Manager
Contractor
Site Engineer
Under Scope of Pre-design Services, which is NOT included.
Value Management
Architectural Planning
Site Utilization and Land-Use Studies
Feasibility Studies
If portions of the building/s are erected at different periods of time, thus increasing the construction period and Architect’s burden of services, charges pertaining to
services rendered during the Construction Phase shall be adjusted proportionately. The fee for the remaining works shall be doubled when the suspension of construction exceeds a period of how many months?
4
8
6
12
Conceptualizes the specifications for the needed civil works and utility lines.
Site Development Planning (SDP) Services
Site And Physical Planning Services
Comprehensive Development Planning (CDP) Services
Contract Documentation And Review Services
Under Multiple of Direct Expenses, all are to be charged to the Client including:
Out-of-town living and housing allowances of local Consultants
Cost of Transportation
Living and housing allowances of foreign consultants
All of the above
The Architect monitor security services. Which scope of service is this responsibility?
Building and Facilities Administration
Post-Construction Evaluation
Security Evaluation and Planning Services
Facilities Maintenance Support Services
Normally, the Architect enters into a contract with the Owner to perform Comprehensive Architectural Services. By the very nature of the services, he assumes the dual role of?
Project Coordinator and Construction Manager
Project Manager and Construction Supervisor
Project Consultant and Construction Manager
Project Manager and the Construction Manager
The people appointed by the Owner to assess the entries to the competition.
IAPOA ADC Committee
Jury
Professional Advisor
Technical Advisors
For Monumental buildings and other facilities requiring consummate design skill and much precise detailing Recommended Professional Fee (RPF) for Detailed
Architectural Design Services (DADS)?
6%
6.6%
7.2%
7.5%
This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.
Site Utilization and Land-Use Studies
Site Selection and Analysis
Architectural Research
Architectural Programming
The New/Updated Standards of Professional Practice (SPP) for Architects was approved and subsequently prescribed by the PRC through PRBoA Resolution No. 3 on?
27th July, 2010
21st February, 2011
9th March 2011
4th July, 2010
The Owner undertakes to accept the decisions of the Jury to pay the prizes allotted within how many days of the official
announcement of the ADC results?
Thirty (30) Days
Fifteen (15) Days
Ten (10) Days
Five (5) Days