1.

Under Fulltime Supervision Services, the

following are the scope of services except:

a)

Filing of documents

b)

Evaluation of Construction Work

c)

Quality Assurance

d)

Preparation of Daily Inspection

Reports

2.

Service where the Architect assists the

Client in conducting bids or negotiations

with General Contractors, subcontractors

and suppliers of building materials,

furniture, equipment, fixtures, etc.

a)

Acoustic Design Services

b)

Architectural Interiors Services

c)

Architectural Lighting Layout And

Design

d)

Regular Design Services

3.

Assist the proper third parties in seeing to

it that all equipment (air-conditioning,

sprinkler system, generators, transformers,

telecommunications equipment, etc.) are

properly maintained and in good working

condition.

a)

Facility Maintenance Support

Services

b)

Construction Manager

c)

Comprehensive Development

Planning

d)

Building Equipment Maintenance

4.

As early as during the design development

phase, perhaps even concurrently with the

Architect’s commission, the Project

Manager (PM) should conduct regular

consultations with the Owner and with the

Architects and Engineers (for A&E

services) on all aspects of planning for the

project.

a)

Consultation

b)

Project Development Phase

c)

Pre-Construction Phase

d)

Comprehensive Development

Planning

5.

The Recommended Professional Fee

(RPF) for an Architect doing Design-Build

Services on Guaranteed Maximum Cost

shall be?

a)

7% of PCC

b)

8% of PCC

c)

9% of PCC

d)

10% of PCC

6.

The person or organization that undertakes

or promotes an ADC with the primary

objective of obtaining excellence in design

for a project or for a development concept.

a)

PRC

b)

Owner

c)

Specialist Consultant

d)

Professional Advisor

7.

Pursuant to Section 7, Article II of R.A. No.

9266, known as?

a)

The Architectural Act of 2004

b)

The Architecture Act of 2010

c)

The Architecture Act of 2004

d)

The Architectural Act of 2010

8.

A person found preparing architectural

plans without the necessary license is

guilty of what?

a)

Misinterpretation

b)

Nothing

c)

Misdemeanor

d)

Illegal Practice

9.

Specialist personnel who may be consulted

by the Jurors during the conduct of the

ADC to permit them to obtain all necessary

relevant information.

a)

Technical Advisors

b)

Professional Advisor

c)

IAPOA ADC Committee

d)

Competition Secretariat

10.

Recommended Professional Fee (RPF) for Detailed Architectural and Engineering Design Services (DAEDS) with a Project Construction Cost (PCC) of over P50.0 million to P100.0 million for buildings with simplest utilization.

a)

P2,500,000 plus 4% of excess of P50.0 million

b)

P2,000,000 plus 3% of excess of P50.0 million

c)

P3,000,000 plus 5% of excess of P50.0 million

d)

P3,500,000 plus 6% of excess of P50.0 million

11.

The project construction cost is guaranteed by the Architect not to exceed how many percentage of the estimated project construction cost?

a)

5%

b)

6%

c)

7%

d)

10%

12.

Supervise landscape contractors and gardeners for the proper watering, pruning, trimming and maintenance of the landscape (both hardscapes and softscapes).

a)

Project Manager

b)

Grounds and Landscaping Supervision

c)

Site and Physical Planning

d)

Site Development Planning

13.

When the Consulting Architect is commissioned to do this service, he examines existing laws, ordinances, and political / social constraints.

a)

Site Development Planning (SDP) Services

b)

Site And Physical Planning Services

c)

Comprehensive Development Planning (CDP) Services

d)

Contract Documentation And Review Services

14.

Is directly responsible to the Owner on all aspects of the construction work: programming, coordination, quality and cost control and time management.

a)

Project Manager

b)

Construction Manager

c)

Contractor

d)

Site Engineer

15.

Under Scope of Pre-design Services, which is NOT included.

a)

Value Management

b)

Architectural Planning

c)

Site Utilization and Land-Use Studies

d)

Feasibility Studies

16.

If portions of the building/s are erected at different periods of time, thus increasing the construction period and Architect’s burden of services, charges pertaining to

services rendered during the Construction Phase shall be adjusted proportionately. The fee for the remaining works shall be doubled when the suspension of construction exceeds a period of how many months?

a)

4

b)

8

c)

6

d)

12

17.

Conceptualizes the specifications for the needed civil works and utility lines.

a)

Site Development Planning (SDP) Services

b)

Site And Physical Planning Services

c)

Comprehensive Development Planning (CDP) Services

d)

Contract Documentation And Review Services

18.

Under Multiple of Direct Expenses, all are to be charged to the Client including:

a)

Out-of-town living and housing allowances of local Consultants

b)

Cost of Transportation

c)

Living and housing allowances of foreign consultants

d)

All of the above

19.

The Architect monitor security services. Which scope of service is this responsibility?

a)

Building and Facilities Administration

b)

Post-Construction Evaluation

c)

Security Evaluation and Planning Services

d)

Facilities Maintenance Support Services

20.

Normally, the Architect enters into a contract with the Owner to perform Comprehensive Architectural Services. By the very nature of the services, he assumes the dual role of?

a)

Project Coordinator and Construction Manager

b)

Project Manager and Construction Supervisor

c)

Project Consultant and Construction Manager

d)

Project Manager and the Construction Manager

21.

The people appointed by the Owner to assess the entries to the competition.

a)

IAPOA ADC Committee

b)

Jury

c)

Professional Advisor

d)

Technical Advisors

22.

For Monumental buildings and other facilities requiring consummate design skill and much precise detailing Recommended Professional Fee (RPF) for Detailed

Architectural Design Services (DADS)?

a)

6%

b)

6.6%

c)

7.2%

d)

7.5%

23.

This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.

a)

Site Utilization and Land-Use Studies

b)

Site Selection and Analysis

c)

Architectural Research

d)

Architectural Programming

24.

The New/Updated Standards of Professional Practice (SPP) for Architects was approved and subsequently prescribed by the PRC through PRBoA Resolution No. 3 on?

a)

27th July, 2010

b)

21st February, 2011

c)

9th March 2011

d)

4th July, 2010

25.

The Owner undertakes to accept the decisions of the Jury to pay the prizes allotted within how many days of the official

announcement of the ADC results?

a)

Thirty (30) Days

b)

Fifteen (15) Days

c)

Ten (10) Days

d)

Five (5) Days